COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

1. NOT ALIGNED ROLL UP LOCK HOLES FIXED LOCK HOLE.

APPLIED SKIM COAT ON CRACK,


ADDED FLOOR BEAM, WALL STILL
CRACKING

2. CRACKED WALL INSIDE THE QUARTERS AREA

3. BROKEN FAUCET IN THE QUARTERS FIXED BROKEN FAUCET AND EXTENDED


AREA SINK, AND WATER IS DROPPING TOO THE FACUET SO THE WATER COMING OUT
CLOSE TO THE CORNER, SHOULD DROP WILL DROP NEAR THE CENTER OF THE SINK.
CLOSE TO THE CENTER OF THE SINK
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

4. CRACKED TILES INSIDE THE


QUARTERS AREA REMOVED BROKEN TILES AND
REPLACED WITH NEW ONE

5. CRACK BRIDGING THE DOOR AND FIXED BY APPLYING SKIM COAT


WINDOW IN THE QUARTERS AREA

REMOVED HOLLOW TILES AND


6. HOLLOW TILES AT QUARTERS ROOM REPLACED WITH NEW ONES
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

REMOVED HOLLOW TILES AND


7. HOLLOW TILES AT CHLORINATOR REPLACED WITH NEW ONES
ROOM

REMOVED HOLLOW TILES AND


8. HOLLOW TILES AT CONTROL ROOM REPLACED WITH NEW ONES

RECTIFIED BY REMOVING, SANDING OF OLD


9.UNEVEN CEILING PAINT INSIDE AND
PAINTS, APPLYING SKIM COATS FOR
OUTSIDE THE CONTROL ROOM
UNEVEN FINISHES AND APPLIED PAINT.
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

10. UNEVEN PAINTING AT WAREHOUSE RECTIFIED BY REMOVING, SANDING OF OLD


OUTSIDE WALL PAINTS, APPLYING SKIM COATS FOR
UNEVEN FINISHES AND APPLIED PAINT.

11.UNFINISHED AND UNPAINTED TOP APPLIED SKIM COAT AND APPLIED PAINT
PORTION OF THE CONCRETE FENCE

12.WAVY FINISH OF PERIMETER COLUMNS REMOVED OLD PAINT AND APPLIED SCRATCH COAT
AND WALLS (REBOKADA) THAT SERVED AS BINDER BETWEEN
THE WALL/COLUMNS AND THE NEW LAYER OF
PLASTER.
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

13. NO PAINTING ON STEEL GATE’S PAINTED GATE'S PILLOW BLOCK


PILLOW BLOCK

SHORTENED GATE EXTENSION


14.GATE EXTENSION IS SCRATCHING
THE PUMPING STATION GROUND
FLOOR WHEN OPENED INWARDS

REMOVED OLD PAINT AND APPLIED SCRATCH COAT


15. MISALIGNED PERIMETER WALLS
(REBOKADA) THAT SERVED AS BINDER BETWEEN
AND COLUMNS THE WALL/COLUMNS AND THE NEW LAYER OF
PLASTER.
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

16. UNEVEN PAINTING AT FRONTSIDE REMOVED OLD PAINT BEFORE APPLYING


OF PUMPING STATION NEW PAINT

17. CRACK & UNEVEN PAINTING AT


RIGHT SIDE OF FENCE REMOVED OLD PAINT, APPLIED SCRATCH COAT
(REBOKADA) THAT SERVED AS BINDER BETWEEN THE
WALL/COLUMNS AND THE NEW LAYER OF PLASTER AND
APPLIED NEW PAINT

18.LETTERING & LOGO OF LUBIGAN RE-MADE LETTERING OF PUMPING STATION


PUMPING STATION (NOT ACCEPTABLE
WORKMANSHIP)
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

19.CHIPPED PAINT AT THE TOPSIDE OF REMOVED OLD PAINT BEFORE RE-APPLYING


STEEL FENCE (FRONT SIDE OF NEW PAINT
STATION)

20. CRACKED, UNEVEN & UNPAINTED FIXED FINISH OF TOP OF PEDESTAL AND
CONCRETE PEDESTAL APPLIED PAINT

APPLIED PAINT ON THE UNPAINTED PART


21. UNFINISHED PAINTING ABOVE
THE ROLL UP

FOR APPROVAL OF TECHNICAL DEPT.

22.VFD NOT FUNCTIONING (FOR


REPLACEMENT)
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

FOR APPROVAL OF TECHNICAL DEPT.

23.REPLACE SINGLE PHASE STEPDOWN


TRANSFORMER WITH 3 PHASE AS PER
CONTRACT SPECIFICATION

STILL NO COVER

24. NO COVER ON ELECTRICAL WIRINGS

25.NO FLOOR DRAIN ON CHLORINE ROOM INSTALLED FLOOR DRAIN.


COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

FOR APPROVAL OF TECHNICAL DEPT.

26. NO INSTALLED HOUR METER ON


RVAT AND VFD

SOLAR LIGHT NEAR GATE FOR CHECKING,


SOLAR LIGHT ATTACHED TO BOOM NOT
WORKING ( FOR REPLACEMENT)

27. BOTH PERIMETER SOLAR LIGHTS


INSTALLED ON SITE NOT
WORKING/DAMAGED

28. CHIPPED AND UNFINISHED REMOVED CHIPPED PAINTING AND


PAINTING OF MAINTENANCE BOOM REPAINTED THE BOOM
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

29. NO PADLOCK LATCH/HASP ON


DOORS (CHLORINE ROOM, METERING ADDED LOCK HASP ON DOORS
PUMP ROOM, QUARTERS AREA)

ADDED GRAVEL BEDDING, GENSET PLACED ON


CENTER OF PAD, ADDED RUBBER BASE. (GENSET
30.PLACE GENSET ON CENTER OF ITS
FOR ACCEPTANCE OF TECH. DEPT.
PAD, AND ADD GRAVEL BEDDING ON ITS
SURROUNDING

31.HOLLOW FLOORING NEAR


REMOVED HOLLOW FLOORING BY
DISCHARGE LINE
BACKFILLING AND COMPACTING BEFORE
CONCRETING.
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

32.UNEVEN ALLOWANCE/CLEARANCE CHIPPED FLOORING TO ADD CLEARANCE


UNDER QUARTERS DOOR (TOUCHING SO THE DOOR WON'T TOUCH THE
THE GROUND CAUSING SCRATCHES ON GROUND.
CONCRETE)

33.CONTROL ROOM’S DOOR LOCK IS NOT FIXED BY EMBEDDMENT OF LOCK HOLE


INSTALLED PROPERLY, (FLOOR AREA) ON CONCRETE.

STRETCHED BARBED WIRE TO REMOVE


34.BARBED WIRE NO PAINTING SAG AND PAINTED WITH SILVER
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

35.BROKEN WATER SPOUT NEAR


CONTROL ROOM DOOR
FIXED BY ADJUSTING POSITION OF
DOWNSPOUT SO THE STEEL DOOR
WON'T HIT IT.

36.INCONSISTENCY OF GROUND
FLOOR FINISH

FOR REPLACEMENT

37.DRESSER COUPLING THAT'S CURRENTLY


INSTALLED AT DISCHARGE LINE IS FROM TANWD'S
STORE ROOM, BECAUSE THE DRESSER COUPLING
THAT WAS INITIALLY INSTALLED BY SINIAN WAS
DAMAGED.
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

38.PAINT THE TUBE CONNECTING


THE ACB TO MERALCO METER
PAINTED WITH SILVER

39.LEAKING FAUCET OUTSIDE REPLACED FAUCET AND


NEAR THE WATER METER ADDED TEFLON TAPE.

40.PROTRUDING ELECTRICAL EMBEDDED ELECTRICAL


WIRING WIRING AT WALL AND BEAM
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

41.POOR WORKMANSHIP OF REMOVED TILES, FIXED GROUT THICKNESS


KITCHEN SINK, TILES AND GROUT BEFORE INSTALLING NEW TILES

42. CRACKS ON COLUMN OF FIXED BY APPLYING SKIM COAT


QUARTERS AREA (PLASTERING) AND PLASTERING

43.WAVY COLUMNS AT QUARTERS AREA FIXED BY APPLYING SKIM COAT


AND PLASTERING
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

CONT. FROM #43 (WAVY COLUMNS AT


QUARTERS AREA) FIXED BY APPLYING SKIM COAT
AND PLASTERING

FIXED BY APPLYING SKIM COAT


44.POOR WORKMANSHIP OF STRUCTURAL AND PLASTERING (COLUMNS
MEMBERS AT QUARTERS AREA, ONLY)
UNALIGNED BEAMS COLUMNS.
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

45.SHOULD BE PAINTED (ENTRANCE RECTIFIED BY APPLYING PAINT


OF WAREHOUSE AREA)

46. POOR PAINTING WORKMANSHIP


OF DOWNSPOUTS
REPAINTED DOWNSPOUTS

47. POOR TILES INSTALLATION


WORKMANSHIP (CHLORINATOR REMOVED TILES AND REPLACED
ROOM) WITH NEW ONE
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

48.WATER ACCUMULATES ON CERTAIN GROUND


FLOOR AREAS IN THE PUMPING STATION (SEE
PHOTOS ABOVE).

49.FENCE SCREEN STARTING TO RUST SANDING OF RUST AND APPLYING


DUE TO POOR APPLICATION OF PAINT NEW PAINT

50.CRACKED WALL (REAR SIDE OF REMOVED OLD PAINT, APPLIED SCRATCH COAT (REBOKADA) THAT
PUMPING STATION) AND POOR SERVED AS BINDER BETWEEN THE WALL/COLUMNS AND THE NEW
PAINTING WORKMANSHIP LAYER OF PLASTER AND APPLIED NEW PAINT
COMMISSIONING OF LUBIGAN PUMPING STATION PUNCHLIST PHOTOS

BEFORE AFTER

53. ALIGNMENT OF DOWNSPOUT


FIXED ALIGNMENT AND
REPAINTED

54. EMBEDMENT OF ELECTRICAL LINE

56. PUMP BASE SHOULD BE


TAPERED (AS PER PLAN) REMOVED EXPOSED PLATE
AND PLASTERED.