53-Request For Site Delivery Inspection (Airconditioning)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

F - ABCD - 43FLBLDG - 53

ABC Construction Corporation


Project :
TYPE YOUR PROJECT NAME

REQUEST FOR SITE DELIVERY INSPECTION Date Prepared Request No.


( AIR CONDITIONING AND VENTILATION WORKS )

Refrigerant Piping Air cooled Condensing Unit (ACCU)


Condensate Drip Piping Fan Coil Unit-Split Type (FCU)
Low Velocity Duct Air Handling Unit, DX Type (AHU)
Kitchen Exhaust Ductwork Exhaust Fan (EF)
Dampers (fixed, variable, & fire) Toilet Exhaust Fan (TEF)
Grilles/ Louvers Kitchen Range Hood
Window Type Airconditioners (WAC) Others

REQUESTED BY : Name/ Designation :


Contractor : Signature :

Note : All signatories should print their name and sign.

Item No. Particular Quantity Remarks

REVIEWED BY : INSPECTED BY:

MECHANICAL CONTRACTOR
PROJECT SUPERVISOR

NOTED BY: QC

NOTED BY :

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding
Contractor's Personnel-in-charge at least 24 hours before actual installation.

Rev. 0 August 27,2019