F - ABCD - 43FLBLDG - 47

ABC Construction Corporation


Project :
TYPE YOUR PROJECT NAME

REQUEST FOR INSTALLATION Date Prepared Request No.


AIRCONDITIONING & VENTILATION
WORKS
Refrigerant Piping Window Type Airconditioners (WAC)
Condensate Drip Piping Air Cooled Condensing Unit (ACCU)
Low Velocity Duct Fan Coil Unit - Split Type (FCU)
Kitchen Exhaust Ductwork Air Handling Unit, DX Type (AHU)
Dampers (fixed, variable & fire) Exhaust Fan (EF)
Grilles / Louvers Toilet Exhaust Fan (TEF)
Others Kitchen Range Hood / PVC Pipe

REQUESTED BY : Name/ Designation :


Contractor : Signature :

Note : All signatories should print their name and sign.


AREA (Pls. enclose key plan) GRIDLINE/LOCATION LEVEL STRUCTURE

NOTED BY CHECKED BY INSPECTED BY


CHECK ITEMS
CONTRACTOR PROJECT SUPERVISOR QC

ELECTRICAL/ FDAS

PLUMBING/SANITARY

FIRE PROTECTION

ARCHITECTURAL

Concrete Topping

Wall Partitioning

Ceiling

Waterprooofing
Painting

Others

REMARKS :

REVIEWED BY : NOTED :

PROJECT SUPERVISOR

APPROVED BY : NOTED BY:

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding
Contractor's Personnel-in-charge at least 24 hours before actual installation.

Rev. 0 August 27,2019