PERT CPM Assignment
PERT CPM Assignment
PERT CPM Assignment
( BY PERT/CPM DIAGRAM)
###
C
26 28
ELECTRICAL/SANITARY/MECHANICAL ROUGH-IN
###
J
23 24
###
INST. ELECT/
MECH/SANITARY
FIXTURES K
MOVE-
IN
EARTH
WORKS
CONCRETE
MASONRY
WORKS
ROOF FRAMING
ROOFING
24 25
FINISHES
PAINTING
MOVE
OUT
A B D
WORKS E
I L O P S T
0 0 2 2 2
2 4 4 5
9 9 3
12 12 5
17 17 4
21 21 4
25 25
3 28 28 2
30 30
INST. GUTTER &
SOIL POISONING 1
M
12 14
N
16 21
###
Q 4
2 23 25
R
27 28
BACKFILL
F G
DAMPROOFING/SLAB ON FILL
H
INST. FAB. MATLS &
HARDWARE
4 5 2 5 7 3
10 21
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
LEGEND:
NETWORK -
ACTIVITY - EVENT -
DUMMY -
A B
ES LS EF LF
A
ES LS
CALENDAR DAYS
CRITICAL PATH -
AMOUNT CALENDAR DAY
SCOPE OF WORKS WT.(%)
(PHP) 5 10
I. MOBILIZATION/DEMOB 1.00 3,000.00
II. EARTHWORKS 2.29 6,870.00
III. SOIL POISONING 0.56 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00
V. CONCRETE WORKS 29.65 88,950.00
VI. MASONRY WORKS 3.21 9,630.00
VII. CARPENTRY WORKS 3.54 10,620.00
VIII. FAB. MATLS & H’WARE 9.08 10,620.00
IX. ROOF FRAMING WORKS 9.87 27,240.00
X. ROOFING WORKS 7.20 29,610.00
XI. FINISHES 12.23 21,600.00
XII. PAINTING WORKS 6.50 36,690.00
XIII. SANITARY WORKS 4.06 19,500.00
XIV. ELECTRICAL WORKS 5.34 16,020.00
XV. MECHANICAL WORKS 5.00 15,000.00
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P)
PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)
- CRITICAL ACTITITY
- PARALLEL ACTITITY
DATA SHEETS
CLASSROOM SCHOOL BUILDING
ESTIMATED START FINISH
ACTIVITIES FLOAT
TIME ES LS EF LF
A-B MOBILIZATION 2 0 0 2 2 0
A-C PROCUREMENT / DELIVERY OF CONSTRUCTION 26 0 0 26 28 2
MATERIALS
B-D EARTHWORKS 2 2 2 4 4 0
D-E CONCRETE WORKS 5 4 4 9 9 0
D-F SOIL POISONING 1 4 4 4 5 1
F-G BACKFILL 2 4 5 5 7 3
G-H WATERPROOFING / SLAB ON FILL 3 5 7 10 21 13
E-I MASONRY WORKS 3 9 9 12 12 0
E-J ELECTR./SANITARY/MECH. ROUGH - IN 14 9 9 23 24 1
J-K INST. OF ELECT/MECH/SAN. FIXTURES 1 23 24 24 25 2
I-L ROOF FRAMING 5 12 12 17 17 0
L-O ROOFING 4 17 17 21 21 0
O-P FINISHES 4 21 21 25 25 0
O-Q CARPENTRY 2 21 21 23 25 2
Q-R INST. OF FAB. MATERIALS & H’WARE 4 23 25 27 28 3
P-S PAINTING 3 25 25 28 28 0
S-T MOVE OUT 2 28 28 30 30 0
TOTAL CALENDAR DAYS
AMOUNT 5 10 15 20 25 30
1 1 111 1 1 11 1 1 1 1 1 11 1 11 1 1 11111 1111
MANPOWER
RATE/DAY
RES. ENGINEER
CONST. FOREMAN 1
LEADMAN 1
CARPENTER 1
MASON 1
SAFETY OFFICER
###
TOTAL
SCOPE OF WORKS WT.(%) AMOUNT CALENDAR DAYS
(PHP) 5 10 15 20 2
I. MOBILIZATION/DEMOB 1.00 3,000.00 1,500.00
II. EARTHWORKS 2.29 6,870.00 3,435.00 3,435.00
III. SOIL POISONING 0.56 1,680.00 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00 1,410.00
V. CONCRETE WORKS 29.65 88,950.00 11,118.75 44,475.00 33,356.25
VI. MASONRY WORKS 3.21 9,630.00 3,210.00 6,420.00
VII. CARPENTRY WORKS 3.54 10,620.00
VIII. FAB. MATLS & H’WARE 9.08 10,620.00
IX. ROOF FRAMING WORKS 9.87 27,240.00
X. ROOFING WORKS 7.20 29,610.00
XI. FINISHES 12.23 21,600.00
XII. PAINTING WORKS 6.50 36,690.00
XIII. SANITARY WORKS 4.06 19,500.00 676.67 3,383.33
XIV. ELECTRICAL WORKS 5.34 16,020.00 890.00 4,450.00
XV. MECHANICAL WORKS 5.00 15,000.00 833.33 4,166.67
CALENDAR DAYS
15 20 25 30
CRITICAL
FLOAT ACTIVITY
0 +
2
0 +
0 +
1
3
13
0 +
1
2
0 +
2
7
0 +
0 +
2
3
0 +
0 +
30
CALENDAR DAYS
20 25 30
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1
CALENDAR DAYS
20 25 30
1,500.00
1,410.00
33,356.25
6,420.00
10,620.00
13,620.00 13,620.00
17,766.00 11,844.00
16,200.00 5,400.00
36,690.00
19,500.00
3,383.33 3,383.33 3,383.33 1,353.34
4,450.00 4,450.00 4,450.00 1,780.00
4,166.67 4,166.67 4,166.67 1,666.66