Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

0 10 20 30 40 50 60 70 80 90 100 NATURAL GAS


Nr./No. Funkcion Pipe no. Pipe Dim.
1 VS INLET SE-NG-001-100 ø 114,3 x 3,6
A 2 Combined burner 1 SE-NG-201-050 ø 60,3 x 2,9 A
3 Combined burner 2 SE-NG-202-050 ø 60,3 x 2,9
4 Fast burner 1 SE-NG-203-050 ø 60,3 x 2,9
5 Fast burner 2 SE-NG-204-050 ø 60,3 x 2,9
6 Blow out line SE-NG-501-025 ø 33,7 x 2,6
7 VS-PCC SE-NG-003-150 ø 168,3 x 4,5

B B

TRANSFORMER CENTER LINE


FURNACE CENTER LINE

C C
T.O.P. 5 5680
NG101
+8400
980

16345
APP. +7400 A
5 6 FPR002
6300

D FURNACE CENTER LINE D


B
APP. +3200 5

EAF UTILITIES
6 BUILDING
All cited standards refer to the version valid at creation date of this drawing

E E

5
D
8250

11350

500
2 3 4
F F

SE.84.1-F2010
SE.21.12-FPP1000
B A B
FPR002

E-E
6310

VS REPAIR STAND
the Primetals Technologies Legal Entity being party to the respective order. Copying, adapting, reproducing, distributing and/or communicating

G 01 1:10 SE.22.54-3001 G
to the public and/or thrid parties without the written consent of the respective Primetals Technologies Legal Entity is strictly forbidden.

+3840
The copyright, other intellectual property rights and the exclusive right of use of the present document (and its content) remains with

+3750 +3750 SE.22.54-F3001


950 SE.84.1-F2010

150 REDUCER 50/25


5675 5675 4100
H 5 V 20 W 33 X 25 Y 12
H
E E

15
11

12
12000 12000 15000 10

12
9
VS REPAIR STAND 5
5

12
4
Any infringement will be prosecuted to full extent of the applicable law.

2 SE.22.54-F3001 01
APP. +3200 3 8

12
7

B/5
W

12
B-B D
SW

NW
6
KEY PLAN

18
SE
NE
E

4 3 2
1:35 1:20 5

18
J 3900 46Q 366411.71 2492756.35 46Q 366396.76 2492848.14
4 J
2590

12
D' A 3

11
9,5

12
D 2

27
B' 3,85

12
10.,4
1 B

3
38
+10300
680

27
E
84.1-F2010

5
46Q 366465.01 2492765.03 C
3
21.12-FPP1000 01 12 12 12 12 12 12 12 12 12 12 12 12 12 12 15 18 12 12 15 12 12 12 12 12 15 12 12
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
VALID STANDARDS UNLESS OTHERWISE SPECIALLY NOTED
K K
document shall not be used for any purpose other than for executing the respective order.
The content of the present document shall be treated strictly confidential and shall not be

DIN ISO 1302 R2 (Ra) DIN ISO 2768 T1-m DIN EN ISO 13920 B, F ISO 5817 C
Technologies Legal Entity being party to the respective order. In particular, the present

280
technical drawings method of indicating surface texture general tolerances T2-K general tolerances for welded constructions arc-welded joints in steel
disclosed to the public or to any third party wihout the written consent of the Primetals

7030 3900 01 Table,pipe routing changed 24.02.2017 J.POKORNY F.ARRAMON


Revision Modification Contents Date Made by Checked by

Customer Doc No.

102-07-04-UTL-005 GPH ispat ltd.


V1.6

GPH ISPAT Ltd


Project Sub Supplier
4 3 2
GPH ISPAT Ltd Sub Supplier Doc.No.

EAF STAHLWERK
Plant Date Name

L EAF STEELMAKING PLANT L


Made by
09.01.2017 J.POKORNY
ERDGAS
Area Checked by
REMARKS:
NATURAL GAS
Approved by
17.01.2017 F.ARRAMON
- PIPE ROUTINGS ARE SHOWN ONLY SCHEMATICALLY
ZWISCHENVERROHRUNG
550

Equipment Material

- LEVEL OF PIPE ROUTING DETERMINED ONLY APPROXIMATELY INTERCONNECTING PIPING


Mass (kg)
01 - FOR EQUIPMENT TOP´s SEE DETAIL ENGINEERING OF MACHINE ATTACHED PIPING Sub-Group Security Level

- FINAL PIPE ROUTING HAS TO BE DEFINED DURING DETAIL ENGINEERING Status

- DETAIL ENGENEERING CUSTOMER SUPPLY Drawing Name Document Type


Fuehrungsplan Rohrleitungen
Guidance drawing piping
1:80 1:20 A1
Material No. Version Scale Size

M IMPORTANT REMARK: M
1 1
Sheet No. of Sheets

4 3 2 - PIPE CLASS FOR NATURAL GAS PIPING GENERAL D16FH Drwg. No. PLM ID Revision

C.LY70.SE.84.1-F2010/FPR001 20050181659 01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A1 (841 x 594)

You might also like