MANNER OF PROVIDING

SPP SCHEDULE OF FEES SCOPE OF SERVICES


SERVICES
METHOD OF COMPENSATION

1. Consultation 1. Multiple of Direct Personnel


7. Architectural programming
2. Pre-feasibility studies 1. Individual Architect must be Expenses (MDPE)
5% PF upon signing of agreement 8. Space planning
3. Feasibility studies knowlegdeable in diff. fields 2. Professional Fee plus expenses
9. Space Management studies
201 PRE-DESIGN 4. Site Selection and analysis 2. Architect (as natural persons) or 3. Lump Sum or Fixed Fee
progress payment upon submission of 10. Value management
5. Site Utilization and Land-Use Firms (judicial persons) 4. Per Diem, Honorarium plus
SOA = 7 days 11. Design brief preparation
6. Architectural research 3. by consultation or networking Reimbursable Expenses
12. Promotional services
5. Mixed method of compensation

202 REGULAR DESIGN DAEDS DADS


Simple Projects 5% 3%
Moderate Projects 6% 3.60% 1. Percentage of PCC
Exceptional Projects 7% 4.20% 1. Project Definition Phase 2. Multiple of Direct Personnel
Residential Projects 10% 6% 2. Schematic Design Phase Expenses (MDPE)
1. single contract (arch & owner)
3. Design Development Phase 3. Professional Fee plus expenses
Monumental Projects 12% 7.50% 2. separate contract (arch + allied
4. Contract Document Phase 4. Lump Sum or Fixed Fee
Repetitive Projects 100% prof)
5. Bidding or Negotiation Phase 5. Per Diem, Honorarium plus
Housing Projects 10% 6% 6. Construction Phase Reimbursable Expenses
Extensive Detailing 15% 6. Mixed method of compensation
Alterations/ Renovations 150%
Consulatition/ Arbitration shall not be less than P1000/hr
1. Architectural Interiors (AI) 12. Building Environmental
203 SPECIALIZED ARCHITECTURAL RFP
2. Acoustic Design Certification
3. Architectural Lighting Layout 13. Forensic Architecture
Arch'l Interior
and Design 14. Building Appraisal
4. SDP 15. Structural Conceptualization
Acoustic design
5. Site and Physical Planning 16. Preliminary Services
10%
Services (including Master 17. Contract Documentation and
Arch'l Lighting layout
Development Planning, Review
Subdivision Planning and Urban 18. Post-Design Services (including
SDP Design) Construction Management
6. Comprehensive Development Services) 1. dual capacity (AoR and CA)
Physical planning Planning 19. Dispute Avoidance and 2. CA only
7. Historic and Cultural Heritage Resolution
<5 hec P5.00/sqm Conservation and Planning 20. Architectural Research
8. Security Evaluation and Methods
5-10 hec P4.00/sqm Planning 21. Special Building / Facility
9. Building Systems Design Planning and Design
10-50 hec P3.00/sqm 10. Facilities Maintenance Support 22. Building Components
11. Building Testing and 23. Management of Architectural
50 hec above P1.50/sqm Commissioning Practices

Others man-months
MANNER OF PROVIDING
SPP SCHEDULE OF FEES SCOPE OF SERVICES
SERVICES
METHOD OF COMPENSATION

1. Quality Control
2. Evaluation of Construction Work 1. Percentage of PCC
3. Preparation of Daily Inspection Reports 2. Multiple of Direct Personnel
5% PF upon signing of agreement
4. Filing of documents Expenses (MDPE)
1. dual capacity (AoR/CA and CSG) 3. Professional Fee plus expenses
204-A FULL TIME SUPERVISION progress payment uponof
1% to 1.5% submission
PCC of
2. CA or CSG 4. Lump Sum or Fixed Fee
SOA = 7 days
5. Per Diem, Honorarium plus
Reimbursable Expenses
6. Mixed method of compensation

a) as CM:
1. Coordination and Supervision
2. Coast and Time Control
204-B CONSTRUCTION MANAGEMENT 1.5% to 3% of PCC 3. Quanlity Control of Work
4. Keeping of records

b) may hire the CSG


a) Building and Facilities Administration:
1. Building Maintenance
2. Grounds and Landscaping Supervision
1. Percentage of gross rentals,
3. Building Equipment Maintenance 1. dual capacity (AoR and CA)
205 POST-CONSTRUCTION 4% to 6% of gross rental maintenance and security fees
4.Business Development and Management 2. CA only
2. Monthly salary/fee

b) Post-Construction Evaluation

a) Comprehensive Architectural Services:


1. Pre-design 1. Percentage basis
2. Regular design 2. same as regular design services
3. Specialized Architectural a) Comprehensive Arch'l: *Percentage of PCC
4. Construction 1. PM and CM * Multiple of Direct Personnel
5. Post-Construction Expenses (MDPE)
206 COMPREHENSIVE ARCHITECTURAL 2% to 5% of PCC
b) PM * Professional Fee plus expenses
b) Project Management 1. may hire a CM * Lump Sum or Fixed Fee
1. Pre-Construction 2. Owner-Ar-Engr-Contractor Team * Per Diem, Honorarium plus
2. Construction Reimbursable Expenses
* Mixed method of compensation

207 DESIGN-BUILD
1. by Administration
same as regular design:
* Project Definition Phase
* Schematic Design Phase 1. part or member of the entity
as Administration 7% of PCC
* Design Development Phase contructing his design
1. payment based on progress of
* Contract Document Phase 2. State-licensed contractor
construction
* Bidding or Negotiation Phase implementing his design
* Construction Phase

2. w/ Guaranteed Maximum PCC


Guaranteed Maximum Cost 10% of PCC
* 10% of the estimated PCC