The document is a checklist for sunken filling using AAC blocks at a construction site. It outlines steps to check for cleaning of the base surface, any slab cracks, reference levels, floor slope approval, availability of materials during filling, applying cement slurry to the top surface, using the proper mixing ratio for the sunken filling, ensuring proper mortar thickness and joints, checking top levels after filling, and curing the sunken filling. The checklist is signed off by the site engineer and approved by the client engineer once completed.
The document is a checklist for sunken filling using AAC blocks at a construction site. It outlines steps to check for cleaning of the base surface, any slab cracks, reference levels, floor slope approval, availability of materials during filling, applying cement slurry to the top surface, using the proper mixing ratio for the sunken filling, ensuring proper mortar thickness and joints, checking top levels after filling, and curing the sunken filling. The checklist is signed off by the site engineer and approved by the client engineer once completed.
The document is a checklist for sunken filling using AAC blocks at a construction site. It outlines steps to check for cleaning of the base surface, any slab cracks, reference levels, floor slope approval, availability of materials during filling, applying cement slurry to the top surface, using the proper mixing ratio for the sunken filling, ensuring proper mortar thickness and joints, checking top levels after filling, and curing the sunken filling. The checklist is signed off by the site engineer and approved by the client engineer once completed.
BROADWAY CHECKLIST - SUNKEN FILLING(AAC BLOCK) Date: MEGAAPLEX (Mix ratio - 1:5) Location Drawing no & Date Status S.No Description Remarks Yes No NA Before Sunken Filling:
Check for CLEANING OF BASE SURFACE. Is loose
1 mortar & debris removed from the work area?
Check for Slab area cracks if any visible at top
2 surface?
3 Check for reference level and Sunken filling top
level?
4 Check for floor slope as per drawing
5 Check for final approval of clients?
During sunken filling:
1 Check for avilability of materials & man power
Check for moist and cement slurry should be
2 applied top surface area?
Check for sunken filling(AAC Block-50mm tk) mixing
3 ratio 1:5 (one cement and five parts of m sand )
Ensure 10mm thickness of mortar at block bottom
4 area & horizontal joints packing
Check for sunken filling top level & floor level,Trap
5 location
After sunken filling :
1 Check for sunken filling curing
Checked Approved
Name Name
Site Engineer/ Project Engg(GRC) Client Engineer /Project Head (FABS)