Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

GENERAL NOTES

1- All Dimensions are in Millimeters unless


otherwise stated.
2- The drawings included are just schematic
representation of the works, and the Contractor
shall prepare shop drawings detailing the works,
specifications, sizes and locations including the
method statement for approval of the UNOPS site
Engineer in the course of renovation of the project"

KEY PLAN

NO. SHEET NO. SHEET TITLE

COVER SHEET

1 GSU.DD.IC.000 INDEX SHEET 4


Drawn Chkd.

3
2
1

INFRASTRUCTURE & CIVIL PLAN 0


No. Description:
Revisions
Date

PROJECT TITLE:

2 GSU.DD.IC.001 General Notes KASSALA HEALTH CITADEL


GENERAL SURGERY UNITE
KASSALA STATE

3 GSU.DD.IC.002 Pavement Layout CLIENT:

4 GSU.DD.IC.003 Ramps Details


MINISTRY OF HEALTH GOVERNMENT OF
SUDAN
DONOR:

ITALIAN AGENCY FOR DEVELOPMENT


COOPERATION (AICS)
IMPLEMENTED BY :

UNITED NATIONS OFFICE FOR PROJECT


SERVICES

Drawing Title:
IDEX SHEET

Project No. Date:


20470-001 08-Jan-2022

Designed & Drawn By: Chk. By N


Anwar Adam Nada Bashir
Org.Sheet Size: Scale:

A2 N.T.S
Rev. No.
Sheet No. DWG. NO
GSU.DD.IC.000 2
GENERAL NOTES

1- All Dimensions are in Millimeters unless


otherwise stated.
2- The drawings included are just schematic
representation of the works, and the Contractor
shall prepare shop drawings detailing the works,
specifications, sizes and locations including the
method statement for approval of the UNOPS site
Engineer in the course of renovation of the project"

KEY PLAN

Drawn Chkd.
4
3
2
1
0
No. Description: Date
Revisions

PROJECT TITLE:

KASSALA HEALTH CITADEL


GENERAL SURGERY UNITE
KASSALA STATE

CLIENT:

MINISTRY OF HEALTH GOVERNMENT OF


SUDAN
DONOR:

ITALIAN AGENCY FOR DEVELOPMENT


COOPERATION (AICS)
IMPLEMENTED BY :

UNITED NATIONS OFFICE FOR PROJECT


SERVICES

Drawing Title:
General Notes

Project No. Date:


20470-001 08-Jan-2022

Designed & Drawn By: Chk. By N


Anwar Adam Nada Bashir
Org.Sheet Size: Scale:

A2 N.T.S
Rev. No.
Sheet No. DWG. NO
GSU.DD.IC.001 2
GENERAL NOTES

1- All Dimensions are in Millimeters unless


otherwise stated.
2- The drawings included are just schematic
representation of the works, and the Contractor
shall prepare shop drawings detailing the works,
specifications, sizes and locations including the
method statement for approval of the UNOPS site
Engineer in the course of renovation of the project"

Main Entrance
Street

E-05

KEY PLAN

DOWN
DOWN
UP

UP
Custom Text Custom Text

Parking for Ambulance

1
1

5
4
3
2
2
3
4
5
Parking for Ambulance

percentage_0percentage_1
Parking Area
Parking Area
UP UP
1 1

Custom Text

Custom Text
2 2
3 3
4 4

6_trats_mun5_trats_mun4_trats_mun3_trats_mun2_trats_mun1_trats_mun0_trats_mun 5
DOWN DOWN
5
6_trats_mun5_trats_mun4_trats_mun3_trats_mun2_trats_mun1_trats_mun 0_trats_mun

Waiting Waiting
Area D Area
Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2

Isolation Isolation

Dis
OT Electrical OT Electrical

Dis
General Wards &
Single
Double Patient Double Patient Single Patient Meeting Theatre Double Patient Double Patient
Single & General Wards
Supervisor's

Elec.
IT Room 2 Room Room Room Room Room IT Room 2
8-Beds

DB
Room Single Patient

Elec.
8-Beds

DB
Area =14.30m2 Patient Room Area =24.15m 2 Area =24.15m2 Area =22.20m 2 Area=28.70m2 Office Area =24.15m2 Area =24.15m2
Patient Room Area =14.30m 2
Area =75.30m2 Area =24.15m 2 Office Insurance Office Head Nurse Room Area =24.15m 2
Area =75.30m2
Area 29.75m2 2
Area =22.20m
Area=18.00m2 Office
Lobby
2
Airlock
2
Changing Changing
Pharmacy Reception + Cashier Area=18.00m 2 Area=18.00m2 Airlock Lobby
Area =3.60m Area =4.80m
Room Room Area=28.35m2 +Registration Area =4.80m
2
Area =3.60m
2

2 2 Area=31.50m 2
Area=11.70m Area=11.70m

Nurse Station
Visitor
Toilet Receiving Patient Corridor Corridor Visitor Visitor
Area = Visitor 2 2 Toilet Toilet
Area =58.50m Area =255.60m
9.40m2 Toilet Area =50.00m2 Area =
Area =50.00m2 9.40m2

Area = Area =
12.65m 2 Male Doctor's Doctor's Female 12.65m 2

Elec.
DB
Staff
Area=28.50m 2 Changing Changing Area=28.50m 2 Nurse Changing Room Nurse Changing Room Staff
Toilet Staff Prayer Area=28.50m
2
Area=28.50m
2 Staff Prayer Toilet
Room (M) Abolution Room Room CPR

Solid
CPR
T.
Room (F) T.
Solid
Area=11.30m 2 (M) Abolution Area=11.30m 2 Utility

B A
Utility
Nurse Area=7.20m
2 Preoperative PACU Nurse Green Area
Holding Area=44.50m 2 (F) 2
Station Area=44.50m 2
Area=7. 20m2
Station
Area =83.20m

Clean Area =27.70m2 2 Clean


Area =25.90m
Utility Utility
CPR
T.
Staff CPR
T.
Staff
Toilet Area = Toilet
2
CPR txt
Area = T.
12.65m
12.65m 2 Central Nurse

Elec.
DB
Station
Clean Frozen Blood Area=24.75m
2
Visitor
Visitor
Staff Lounge Electrical Store Section Storage Visitor Toilet
Toilet Central Toilet Toilet Room Area=4.50m2
Toilet Toilet Toilet Area =
Visitor Area =50.00m2 Area=38.25m 2 Area=18.90m
2
Area=18.90m
2 Area=18.90m2 Area=15.50m2
Lab Refrigerator CPR
Area =50.00m2 9.40m2
Toilet
Doctor Station Area=9.00m
2
Area=13.50m 2
T.

Area = Area=27.00m
2 Dirty Area=14.00m
2 Trolley for Soiiled
Linen

9.40m
2
Store

CPR

Elec.
CPR
Trolley for Soiiled

T.
Elec.

DB
Waiting Area

T.
Area=4.50m2
Linen

DB

Airlock Lobby
2 2
Area =4.80m Area =3.60m
Lobby Airlock
2 Area =4.80m 2
Area =3.60m

General Wards
Doctor Isolation Patient Double Patient Double Patient Single Patient Single Patient Double Patient Double Patient Isolation Patient Doctor
General Wards Room Room Room Room Room Room Room Room Room Room
8-Beds
Area =75.20m2 2 UPs UPs Area =75.30m2
Area =14.30m Area =28.10m 2 Area =24.15m
2 2
Area =24.15m Area =22.20m
2
Area =22.20m
2
Area =24.15m
2
Area =24.15m
2
Area =28.10m
2
Area =14.30m
2

Laundry
Store

Dis

Dis
OT OT Stretchers Store Kitchen
Dry Area Bed Bay
PICU Electrical
&
Electrical
& Parking Bay Area= 12.20m2 Area =16.20m
2

Elec.
DB

Elec.
DB
UPs

UPs
IT Room 2 IT Room 2
2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2
Area=15.10 Area=15.10m

Nurse
OT OT
Area=47.52m 2 Area=47.52m 2

Station Store Store Store


Area =11.00m 2 Area =10.60m 2 Area =16.20m2
Bed Bay
DOWN

1_egatnecrep0_egatnecrep
5

Custom Text
4

Ironing Table

Ironing Table

Ironing Table

Ironing Table
3

Recieving 2
1
UP

Area
Ironing Area Area =16.00m2 Corridor
2
Area =27.40m 2 Area =31.50m

F OT
Area=47.52m 2
OT
Area=47.52m 2
G
C
Washing Area

D
Area =27.40m 2
Storage Area

Scrub Up

Scrub Up
2
Area =16.00m

LT.
LT.
stDisplayText
stDisplayText
stDisplayText
stDisplayText
stDisplayText

Bed Bay Bed Bay Bed Bay Bed Bay Bed Bay Bed Bay

Sterile Stock Store


&trolley Set-up
Room

LT.

LT.
OT OT Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2

Area=47.52m
2
Area=47.52m
2
ICU Store
Laundry
Area =239.40m2
Dry Area
General Wards Doctor Isolation Patient Double Patient Double Patient Single Patient
CPR
T.
CPR
T.
Single Patient Double Patient Double Patient Isolation Patient Doctor General Wards

ICU ICU
Area =4.90m2 Area =4.90m2 Area =4.90m2 Area =4.90m2
8-Beds Room Room Room Room Room Room Room Room Room Room 8-Beds
2 2 2 2 2 2 2 2 2 2
Area =75.20m2 Area =14.30m Area =28.10m Area =24.15m Area =24.15m Area =22.20m From CSSD Area =22.20m Area =24.15m Area =24.15m Area =28.10m Area =14.30m
Area =75.30m2
Nurse Nurse
Station Station
Lobby Airlock Lobby
Airlock
Area =3.60m 2 Area =4.80m 2 CPR
Area =3.60m2
T. Area =4.80m 2
Clean Up Flash Flash Clean Up
SH SH
Sterilizer Sterilizer

Elec.

Elec.
DB

DB
SH SH
Visitor Visitor Visitor
Visitor SH SH
Toilet Toilet Toilet
Toilet 2
Area = Area =50.00m2 Area =50.00m Area =
9.40m2 Sterilising & 9.40m2
SH

Cooling

SH
SH
Area =
12.65m 2 Area =48.50m 2
Recieving Area =
1.60 12.65m 2

B2 Staff Staff
B2

SH
Toilet SH SH Toilet
SH SH
Sorting & Pass Through Washing & Clean
Clean
Areas Contamination Utility

H
Packing

I
Utility
Nurse Bed Bay Bed Bay Bed Bay 2 SH
Bed Bay Bed Bay Bed Bay Nurse

UPs

SH
Area =73.25m2 Area =44.75m

Station SH
Station
2 2
Area =27.70m SH
Area =27.70m
Solid Solid
SH SH
Utility Store Utility
SH Store
Staff Area =9.00m2 Staff

SH
SH 2
Area =8.85m
Toilet Toilet
Office Area =
Area =
SH SH SH
Airlock Area = 15.45m 2 12.65m
2

12.65m 2 Area = 8.20m 2 Male SH SH


Female
Changing Changing Visitor
Room room Toilet
Area = 20.80m 2 Area = 20.80m2 Elec & ICT Loan Visitor
Area =
Visitor Toilet
Visitor Toilet Exit Room Equipment Entrance 9.40m2
Area =50.00m2

Pharmacy
Toilet 2 Area = 7.65m 2
Area =
Area =50.00m Cleaning room
Area = 14.30m2

Isolation
9.40m2

OT Electrical

Dis
Lobby Airlock
Electrical

E
General Wards
2 2
Area =3.60m Area =4.80m
Medical Gas Airlock Lobby
LV Room 2 2
Area =4.80m Area =3.60m
Area=14.85m2 Area=15.00m2

Double Patient Double Patient &


General Wards OT Electrical
&
Isolation
Single
Double Patient
Room
Double Patient
Room
Single Patient
Room Water Tanks Administration
Office
Single Patient
Room
Double Patient
Room
Double Patient
Room
Isolation
Single
OT Electrical
&
General Wards
8-Beds

DB
Elec.
8-Beds IT Room 2 Patient Room Airlock
Area = 12.00m 2
Patient Room IT Room 2

Dis
Area =24.15m 2 Area =24.15m2 Area =22.20m 2 Area =22.20m 2 Area =24.15m 2 Area =24.15m 2 Area =75.30m
2
2 Area =14.30m2 Area =24.15m 2 Pump Room Office 2
Electrical MV Area =24.15m 2 Area =14.30m 2
Generators

Dis
Area =75.30m Area=64.35m2 Area = 7.60m

Single
2
Area = 10.50m
Room

Elec.
DB
Area=62.85m2 Area=15.00m2
Area=14.85m2
Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2
Sterilising & Sorting & Washing &

UPs
Cooling Packing Contamination

Room Room IT Room 2


Area =46.10m2 Area =45.20m2

8-Beds
Area =65.65m 2

Single Patient

Elec.
DB
SH SH
Pass Through Pass Through
Areas Areas Store

Patient Room
Store
Area =7.40m2

SH

SH
2
Area =7.45m

Area =14.30m2
SH SH SH SH

Area =24.15m2 Area =24.15m2


Insurance Office Head Nurse Room Area =24.15m2
Area =75.30m2 Service Entrance
Transformers
Area=41.70m 2

Area =22.20m2
Office
Reception + Cashier Area=18.00m2 Area=18.00m2 Airlock Lobby
+Registration Area =4.80m2 Area =3.60m2
Area=31.50m2

E-09

Ironing Table
Corridor Corridor Patient
Drawn Chkd.
Area =58.50m2 Area =255.60m2 Toilet
Nurse Station
Ironing Area
Receiving Patient
Laundry 4
Area =
12.65m2
Washing Area 3
Nurse Changing Room Nurse Changing Room Washing & Staff
L.V Room Toilet
2

A
Area=28.50m2 Area=28.50m2 Contamination CPR
T.
Solid
PACU Sterilization
Utility
1
Nurse Green Area
Unit Area =83.20m2

Preoperative
Station
Area =25.90m2
Laundry Dry 0
Sorting & Packing Area
Holding CPR
T.
No. Description: Date
Frozen Revisions

Elec.
DB
Blood Section
Clean Storage Trolley for Soiiled
Linen
Lab
Store Refrigerator Area=14.00m2

Area=4.50m2
Toilet Toilet
Sterilising &
Cooling
E-11
PROJECT TITLE:
Dirty Area=18.90m2 Area=18.90m2
Store
Area=4.50m2
LT.

Scrub Up
LT.

Scrub Up
KASSALA HEALTH CITADEL
GENERAL SURGERY UNITE
UPs
KASSALA STATE
Bed Bay Transformers Generators
OT

ICU
Dis
Area=9.00m2 Area=15.00m2
Medical Gas Electrical
Bed Bay & Pump

Elec.
UPs

DB
IT Room 2 Fuel tank
Area=15.10m2 16.20
Room m2 CLIENT:
OT
2
OT 2

Nurse Station Area=47.52m2 Area=47.52m2

Bed Bay

Stretchers
Parking Bay
Store Store

E-07
2 2
MINISTRY OF HEALTH GOVERNMENT OF
SUDAN
DONOR:

ITALIAN AGENCY FOR DEVELOPMENT


COOPERATION (AICS)
IMPLEMENTED BY :

B2
UNITED NATIONS OFFICE FOR PROJECT
SERVICES

Drawing Title:
Pavement Layout

Project No. Date:


20470-001 08-Jan-2022

Designed & Drawn By: Chk. By N


Anwar Adam Nada Bashir
Org.Sheet Size: Scale:

A2 N.T.S
Rev. No.
Sheet No. DWG. NO
E-06
GSU.DD.IC.003 2
Street GENERAL NOTES

1- All Dimensions are in Millimeters unless


otherwise stated.
2- The drawings included are just schematic
representation of the works, and the Contractor
shall prepare shop drawings detailing the works,
specifications, sizes and locations including the
method statement for approval of the UNOPS site
Engineer in the course of renovation of the project"

E-05

KEY PLAN

DOWN
DOWN
UP

UP
Custom Text Custom Text

percentage_0percentage_1
Parking Area
Parking Area
UP UP
1 1

Custom Text

Custom Text
2 2
3 3
4 4

6_trats_mun5_trats_mun4_trats_mun3_trats_mun2_trats_mun1_trats_mun0_trats_mun 5
DOWN DOWN
5
6_trats_mun5_trats_mun4_trats_mun3_trats_mun2_trats_mun1_trats_mun 0_trats_mun

Waiting Waiting
Area D Area
Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2

Isolation Isolation

Dis
OT Electrical OT Electrical

Dis
General Wards &
Single
Double Patient Double Patient Single Patient Meeting Theatre Double Patient Double Patient
Single & General Wards
Supervisor's

Elec.
IT Room 2 Room Room Room Room Room IT Room 2
8-Beds

DB
Room Single Patient

Elec.
8-Beds

DB
Area =14.30m2 Patient Room Area =24.15m 2 Area =24.15m2 Area =22.20m 2 Area=28.70m2 Office Area =24.15m2 Area =24.15m2
Patient Room Area =14.30m 2
Area =75.30m2 Area =24.15m 2 Office Insurance Office Head Nurse Room Area =24.15m 2
Area =75.30m2
Area 29.75m2 2
Area =22.20m
Area=18.00m2 Office
Lobby
2
Airlock
2
Changing Changing
Pharmacy Reception + Cashier Area=18.00m 2 Area=18.00m2 Airlock Lobby
Area =3.60m Area =4.80m
Room Room Area=28.35m2 +Registration Area =4.80m
2
Area =3.60m
2

2 2 Area=31.50m 2
Area=11.70m Area=11.70m

Nurse Station
Visitor
Toilet Receiving Patient Corridor Corridor Visitor Visitor
Area = Visitor 2 2 Toilet Toilet
Area =58.50m Area =255.60m
9.40m2 Toilet Area =50.00m2 Area =
Area =50.00m2 9.40m2

Area = Area =
12.65m 2 Male Doctor's Doctor's Female 12.65m 2

Elec.
DB
Staff
Area=28.50m 2 Changing Changing Area=28.50m 2 Nurse Changing Room Nurse Changing Room Staff
Toilet Staff Prayer Area=28.50m
2
Area=28.50m
2 Staff Prayer Toilet
Room (M) Abolution Room Room CPR

Solid
CPR
T.
Room (F) T.
Solid
Area=11.30m 2 (M) Abolution Area=11.30m 2 Utility

B A
Utility
Nurse Area=7.20m
2 Preoperative PACU Nurse Green Area
Holding Area=44.50m 2 (F) 2
Station Area=44.50m 2
Area=7. 20m2
Station
Area =83.20m

Clean Area =27.70m2 2 Clean


Area =25.90m
Utility Utility
CPR
T.
Staff CPR
T.
Staff
Toilet Area = Toilet

1
2
CPR txt
Area = 12.65m
1

T.
12.65m 2 Central Nurse

Elec.
DB
3

5
4
3
2

4
Station
Clean Frozen Blood Area=24.75m
2
Visitor
Visitor
Staff Lounge Electrical Store Section Storage Visitor Toilet
Toilet Central Toilet Toilet Room Area=4.50m2
Toilet Toilet Toilet Area =
Visitor Area =50.00m2 Area=38.25m 2 Area=18.90m
2
Area=18.90m
2 Area=18.90m2 Area=15.50m2
Lab Refrigerator CPR
Area =50.00m2 9.40m2
Toilet
Doctor Station Area=9.00m
2
Area=13.50m 2
T.

Area = Area=27.00m
2 Dirty Area=14.00m
2 Trolley for Soiiled
Linen

9.40m
2
Store

CPR

Elec.
CPR
Trolley for Soiiled

T.
Elec.

DB
T.
Area=4.50m2
Linen

DB

Airlock Lobby
2 2
Area =4.80m Area =3.60m
Lobby Airlock
2 Area =4.80m 2
Area =3.60m

General Wards
Doctor Isolation Patient Double Patient Double Patient Single Patient Single Patient Double Patient Double Patient Isolation Patient Doctor
General Wards Room Room Room Room Room Room Room Room Room Room
8-Beds
Area =75.20m2 2 UPs UPs Area =75.30m2
Area =14.30m Area =28.10m 2 Area =24.15m
2 2
Area =24.15m Area =22.20m
2
Area =22.20m
2
Area =24.15m
2
Area =24.15m
2
Area =28.10m
2
Area =14.30m
2

Laundry
Store

Dis

Dis
OT OT Stretchers Store Kitchen
Dry Area Bed Bay
PICU Electrical
&
Electrical
& Parking Bay Area= 12.20m2 Area =16.20m
2

Elec.
DB

Elec.
DB
UPs

UPs
IT Room 2 IT Room 2
2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2
Area=15.10 Area=15.10m

Nurse
OT OT
Area=47.52m 2 Area=47.52m 2

Station Store Store Store


Area =11.00m 2 Area =10.60m 2 Area =16.20m2
Bed Bay
DOWN

1_egatnecrep0_egatnecrep
5

Custom Text
4

Ironing Table

Ironing Table

Ironing Table

Ironing Table
3

Recieving 2
1
UP

Area
Ironing Area Area =16.00m2 Corridor
2
Area =27.40m 2 Area =31.50m

F OT
Area=47.52m 2
OT
Area=47.52m 2
G
C
Washing Area
Area =27.40m 2
Storage Area

Scrub Up

Scrub Up
2
Area =16.00m

LT.
LT.
stDisplayText
stDisplayText
stDisplayText
stDisplayText
stDisplayText

Bed Bay Bed Bay Bed Bay Bed Bay Bed Bay Bed Bay

Sterile Stock Store


&trolley Set-up
Room

LT.

LT.
OT OT Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2

Area=47.52m
2
Area=47.52m
2
ICU Store
Laundry
Area =239.40m2
Dry Area
General Wards Doctor Isolation Patient Double Patient Double Patient Single Patient
CPR
T.
CPR
T.
Single Patient Double Patient Double Patient Isolation Patient Doctor General Wards
8-Beds
Area =75.20m2
Room
Area =14.30m
2
Room
Area =28.10m
2
Room
Area =24.15m
2
Room
2
Area =24.15m
Room
Area =22.20m
2

ICU Nurse
Station
From CSSD
Nurse
Station
ICU Room
Area =22.20m
2
Room
Area =24.15m
2
Room
Area =24.15m
2
Room
Area =28.10m
2
Room
Area =14.30m
2 8-Beds
Area =75.30m2

Lobby Airlock Lobby


Airlock
Area =3.60m 2 Area =4.80m 2 CPR
Area =3.60m2
T. Area =4.80m 2
Clean Up Flash Flash Clean Up
SH SH
Sterilizer Sterilizer

Elec.

Elec.
DB

DB
SH SH
Visitor Visitor Visitor
Visitor SH SH
Toilet Toilet Toilet
Toilet 2
Area = Area =50.00m2 Area =50.00m Area =
9.40m2 Sterilising & 9.40m2
SH

Cooling

SH
SH
Area =
12.65m 2 Area =48.50m 2
Recieving Area =
1.60 12.65m 2

B2 Staff Staff
B2

SH
Toilet SH SH Toilet
SH SH
Sorting & Pass Through Washing & Clean
Clean
Areas Contamination Utility

H
Packing

I
Utility
Nurse Bed Bay Bed Bay Bed Bay 2 SH
Bed Bay Bed Bay Bed Bay Nurse

SH
Area =73.25m2 Area =44.75m

Station SH
Station
2 2
Area =27.70m SH
Area =27.70m
Solid Solid
SH SH
Utility Store Utility
SH Store
Staff Area =9.00m2 Staff

SH
SH 2
Area =8.85m
Toilet Toilet
Office Area =
Area =
SH SH SH
Airlock Area = 15.45m 2 12.65m
2

12.65m 2 Area = 8.20m 2 Male SH SH


Female
Changing Changing Visitor
Room room Toilet
Area = 20.80m 2 Area = 20.80m2 Elec & ICT Loan Visitor
Area =
Visitor Toilet
Visitor Toilet Exit Room Equipment Entrance 9.40m2
Area = 7.65m 2 Area =50.00m2
Toilet 2

Area =
Area =50.00m Cleaning room
Area = 14.30m2
9.40m2

Lobby Airlock
Electrical

E
2 2
Area =3.60m Area =4.80m
Medical Gas Airlock Lobby
LV Room 2 2
Area =4.80m Area =3.60m
Area=14.85m2 Area=15.00m2

Isolation Isolation General Wards


General Wards OT Electrical Double Patient Double Patient Single Patient Single Patient Double Patient Double Patient OT Electrical
&
Single Water Tanks Office Single
Room Room Room Administration Room Room Room &
8-Beds

DB
Elec.
8-Beds IT Room 2 Patient Room Airlock
Area = 12.00m 2
Patient Room IT Room 2

Dis
Area =24.15m 2 Area =24.15m2 Area =22.20m 2 Area =22.20m 2 Area =24.15m 2 Area =24.15m 2 Area =75.30m
2
2 Area =14.30m2 Area =24.15m 2 Pump Room Office 2
Electrical MV Area =24.15m 2 Area =14.30m 2
Generators

Dis
Area =75.30m Area=64.35m2 2 Area = 7.60m
Area = 10.50m
Room

Elec.
DB
Area=62.85m2 Area=15.00m2
Area=14.85m2
Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2 Area =4.90m 2
Sterilising & Sorting & Washing &
Cooling Packing Contamination
Area =65.65m 2 Area =46.10m2 Area =45.20m2

SH SH
Pass Through Pass Through
Areas Areas Store
Store
Area =7.40m2

SH

SH
2
Area =7.45m

SH SH SH SH

Transformers
Service Entrance Area=41.70m 2

Drawn Chkd.
4
3
2
1
0
No. Description: Date
Revisions

PROJECT TITLE:

KASSALA HEALTH CITADEL


GENERAL SURGERY UNITE
KASSALA STATE

CLIENT:

Waiting Area
MINISTRY OF HEALTH GOVERNMENT OF
SUDAN
DONOR:

+ 1.20
+ 1.20
ITALIAN AGENCY FOR DEVELOPMENT
COOPERATION (AICS)
IMPLEMENTED BY :

UNITED NATIONS OFFICE FOR PROJECT


SERVICES

Drawing Title:

Ramp Layout & Details


Project No. Date:
20470-001 08-Jan-2022

Designed & Drawn By: Chk. By N


Anwar Adam Nada Bashir
Org.Sheet Size: Scale:

A2 N.T.S
Rev. No.
Sheet No. DWG. NO
GSU.DD.IC.004 2

You might also like