300000

LEGEND
1. INLET CHAMBER
2. SCREEN CHAMBER
3. DETRITOR
4. PRIMARY CLARIFIER
5. SECONDARY CLARIFIER
6. FEED CHAMBER TO
PRIMARY CLARIFIER
7. RAW SLUDGE PUMP HOUSE
8. PRIMARY SLUDGE 8 9 SLUDGE DRYING BED
DIGESTER
9. SECONDARY SLUDGE
DIGESTER
10. FEED CHAMBER TO
SECONDARY CLARIFIER 8 9 SLUDGE DRYING BED
11. FILTRATE PUMP HOUSE
200000

FINAL
4 4 5 11 EFFLUENT
5
3

2
7
6 RETURN
3
10 SLUDGE
PUMP
AERATION TANKS
HOUSE
BALANCING TANK

LAYOUT SKALA 1:1200


PROGRAM STUDI TEKNK LINGKUNGAN
BERLIAN MIFTAH FARID UKURAN KERTAS FAKULTAS TEKNIK
UNIVERSITAS PELITA BANGSA
332010096 - TL.20.F3 420x297 (A3) BEKASI
TANGGAL 2021
DODIT ARDIATMA S.T., MSc
28-06-2021