Professional Documents
Culture Documents
1
1
Detailed Engineering Design from the previous geotechnical study in terms of the construction of Toll
Road Serang Panimbang. The geotechnical study was conducted to analyze and calculate the soil
improvement on box culvert. Based on this study, there are several typical design for embankment
area at STA 644,79 as the following section: