HSE WEEKLY REPORT

CLIENT: Private Engineering Office (PEO)

MAIN CONTRACTOR: Al Bazilt Rock Trading and Contracting


PROJECT NAME: Renovation (Design and Build) of Former Blood Bank Building
in Shoura Council

1
S.N TABLE CONTENTS PAGE NO

1.0 INTRODUCTION 3
2.0 STATISTIC / PERFORMANCE REPORT 4
3.0 SUMMARY OF WORKERS PERFORMANCE ON SITE / 5
SAFETY TRANING & MEETING
4.0WORK PROGESS PICTURES 6

1.0 Introduction
2
HSE Weekly report as a compilation of all activities carried
out during the Week.

Site Inspection
Safety Officers on Site to facilitate evaluation of construction sites. He reviews blueprints,
evacuation plans, designs for disposal systems, lighting and ventilation, and ensures there is no
danger to the health or safety of workers or site visitors. Ensure implementation of the correct
safety policies and procedures.

Policies and Procedures


All policies, procedures and programs on construction safety that comply with OHSA
regulations and host Nation Rules and Regulations are strictly adored.

Managing Safety Issues


Construction Manager, Site Engineers, supervisors, foremen, etc. are responsible for the health
and safety of workers and employees engaged in activities under their direction or supervision. 
These supervisors must ensure that their workers and employees:

 Perform work activities in a safe and considerate manner.


 Comply with all relevant regulations and accepted standards.
 Have the engineering controls or protective equipment needed to perform work safely.
 Ensure visitors are safe from and aware of hazards in the area or workplace.

2.0 STATISTICS REPORT

Month: March 2023     Date: from 18th – 23rd March, 2023 Project Code:
WEEKLY HSE STATISTICS / PERFORMANCE REPORT

Current Year to
NO Expected Completion Cumulative
week date

1 No. of Employees (including Sub-Contractors) 112 82 194


2 Man - Hours worked 896 656 1552

3
3 Fatality (Work Related Death) 0 0 0
Serious Injurious Accident (4 days or more lost
4 time) 0 0 0
Moderate Injurious Incident (3 days or less lost
5 time) 0 0 0
6 Number of Lost Time Days (Work Related) 0 0 0
7 Injury Frequency Rate (serious and moderate) 0 0 0
8 Injury severity Rate (serious and moderate) 0 0 0
9 Minor Injuries (no day lost / first aid and check-up) 0 0 0
Serious Damage Accident (estimated over
10 Qr10,000) 0 0 0
11 Moderate Damage Incident (Qr1,000 & Qr10,000) 0 0 0
12 Minor Damage Event (estimated below Qr1,000) 0 0 0
13 Fire Incident (any size) 0 0 0
14 Near Miss Report 0 0 0
15 Environmental Incident 0 0 0
No. of Employees Attended HSE Tool Box
16 meetings 24 16 40
17 No. of Employee Trained and Inducted 9 16 25
18 HSE Violation Issued 0 0 0
19 Safety Improvement Notices Issued 0 0 0
20 Safety Improvement 0 0 0
21 NCR Issued 0 0 0
       

Prepared By: …………………………… Approved By: ……………………………….


Olubunmi Adalumo Mohammed
Site Engineer.
HSE Officer

3.0 SUMMARY
Total manpower of 112 and 896 man-hours were recorded during the Week under review, 9 people were
inducted and all necessary information was passed to them during the induction, 24 people attended
safety Toolbox meeting during the week under review.
We also took time to monitor the progress of the project and also made sure that all safe system of work
was strictly followed.

The Activities Performed during the Week under review is as following:

1. Monitoring of work activities on Site


2. Performing safety toolbox Meeting.

4
3. Demolition work
4. Loading and offloading Activity
5. Block work on-going
6. Plumbing working On-going
7. Gypsum board partition work on-going
8. Housekeeping on- going on site

Below are some of the pictures taken during work activities

OUR OBJECTIVE IS TO MAINTAIN ZERO ACCIDENT ON SITE.

Induction Induction training for new workers

5
TOOLBOX TALK ON SITE DURING THE WEEK

6
Work progress photo (18th – 23rd)

7
Ongoing gypsum activities in progress Ongoing gypsum activities in progress

Plumbing work in progress Offloading of scaffold materials in the


site

Here the Forman sorting out the


Blocks setting ongoing plumbing materials for plumber

8
Manual excavation in progress Manual excavation in progress

Ongoing demolition still continue Ongoing demolition still continue

Ongoing duct cleaning in the site Ongoing duct cleaning in the site

9
Ongoing duct cleaning in the site

10
11