Professional Documents
Culture Documents
Al-Bazilt Weekly Report 18th - 23rd March 2023
Al-Bazilt Weekly Report 18th - 23rd March 2023
1
S.N TABLE CONTENTS PAGE NO
1.0 INTRODUCTION 3
2.0 STATISTIC / PERFORMANCE REPORT 4
3.0 SUMMARY OF WORKERS PERFORMANCE ON SITE / 5
SAFETY TRANING & MEETING
4.0WORK PROGESS PICTURES 6
1.0 Introduction
2
HSE Weekly report as a compilation of all activities carried
out during the Week.
Site Inspection
Safety Officers on Site to facilitate evaluation of construction sites. He reviews blueprints,
evacuation plans, designs for disposal systems, lighting and ventilation, and ensures there is no
danger to the health or safety of workers or site visitors. Ensure implementation of the correct
safety policies and procedures.
Month: March 2023 Date: from 18th – 23rd March, 2023 Project Code:
WEEKLY HSE STATISTICS / PERFORMANCE REPORT
Current Year to
NO Expected Completion Cumulative
week date
3
3 Fatality (Work Related Death) 0 0 0
Serious Injurious Accident (4 days or more lost
4 time) 0 0 0
Moderate Injurious Incident (3 days or less lost
5 time) 0 0 0
6 Number of Lost Time Days (Work Related) 0 0 0
7 Injury Frequency Rate (serious and moderate) 0 0 0
8 Injury severity Rate (serious and moderate) 0 0 0
9 Minor Injuries (no day lost / first aid and check-up) 0 0 0
Serious Damage Accident (estimated over
10 Qr10,000) 0 0 0
11 Moderate Damage Incident (Qr1,000 & Qr10,000) 0 0 0
12 Minor Damage Event (estimated below Qr1,000) 0 0 0
13 Fire Incident (any size) 0 0 0
14 Near Miss Report 0 0 0
15 Environmental Incident 0 0 0
No. of Employees Attended HSE Tool Box
16 meetings 24 16 40
17 No. of Employee Trained and Inducted 9 16 25
18 HSE Violation Issued 0 0 0
19 Safety Improvement Notices Issued 0 0 0
20 Safety Improvement 0 0 0
21 NCR Issued 0 0 0
3.0 SUMMARY
Total manpower of 112 and 896 man-hours were recorded during the Week under review, 9 people were
inducted and all necessary information was passed to them during the induction, 24 people attended
safety Toolbox meeting during the week under review.
We also took time to monitor the progress of the project and also made sure that all safe system of work
was strictly followed.
4
3. Demolition work
4. Loading and offloading Activity
5. Block work on-going
6. Plumbing working On-going
7. Gypsum board partition work on-going
8. Housekeeping on- going on site
5
TOOLBOX TALK ON SITE DURING THE WEEK
6
Work progress photo (18th – 23rd)
7
Ongoing gypsum activities in progress Ongoing gypsum activities in progress
8
Manual excavation in progress Manual excavation in progress
Ongoing duct cleaning in the site Ongoing duct cleaning in the site
9
Ongoing duct cleaning in the site
10
11