Structure Engineer Report,

Centurion Park, 'Non Tower' Near F-06, Stilt Floor Slab,

Date - 04-03-2023.

Report figure wise:

Fig: 00

1. Pour card not issued.


2. Slab casting Date – 04-03-2023.

Fig: 01

1. Beam bottom 2nos 25dia extra bars missing.


2. Provide missing bars and report compliance.
3. Beam both side 8dia 2nos face bars provided instead of 8dia 8nos.
4. Provide missing face bars and report compliance.

Fig: 02

1. Slab depth obtained 100mm instead of 175mm near at beam support.


2. Provide cover blocks and proper size chairs bars to maintain slab
thickness and report compliance.
3. Beam hooks not bent at 135degree.

Fig: 03

1. Slab top extra bars freely provided near at beam support.


2. Provide re-bar arrangement and report compliance.

Fig: 04

1. Beam dowels ring set missing.


2. Provide missing ring set and report compliance.
Fig: 00

Centurion Park, 'Non


Tower' Near F-06, Stilt
Floor Slab,

Date - 04-03-2023.

1. Pour card not


issued.
2. Slab casting Date –
04-03-2023.

Fig: 00

Centurion Park, 'Non


Tower' Near F-06, Stilt
Floor Slab,
Date - 04-03-2023.
Fig: 01

Centurion Park, 'Non


Tower' Near F-06, Stilt
Floor Slab,

Date - 04-03-2023.

5. Beam bottom 2nos


25dia extra bars
provided.
6. Provided missing
bars and.
7. Beam both side
8dia 8nos face bars
provided.
8. Provided missing
face bars.
Fig: 02

Centurion Park, 'Non


Tower' Near F-06, Stilt
Floor Slab,

Date - 04-03-2023.

4. Slab depth obtained


175mm near at
beam support.
5. Provided cover
blocks and proper
size chairs bars to
maintain slab
thickness and.
6. Beam hooks bent at
135degree.
Fig: 03

Centurion Park, 'Non Tower'


Near F-06, Stilt Floor Slab,

Date - 04-03-2023.

3. Slab top extra bars


support provided
near at beam
support.
4. Provided re-bar
arrangement.
Fig: 04

Centurion Park, 'Non


Tower' Near F-06, Stilt
Floor Slab,

Date - 04-03-2023.

1. Beam dowels ring


set missing.
2. Provide missing ring
set and report
compliance.
Fig: 04

Centurion Park, 'Non


Tower' Near F-06, Stilt
Floor Slab,

Date - 04-03-2023.

3. Beam dowels ring


set provided.
4. Provided missing
ring set.