Section

No. Sketch / Drawing Dimension / Calculation Volume M2


STA

1 C1 0.58 M2
Koordinat A B C
No
D4 x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
7 D4

Beton
Klas A
Sirtu
1 0 5.503 - 24.21 (12.11)
Elevasi=5.503

5
2 4.4 5.503 24.21 24.49 (0.14)
3 4.4503 5.503 24.64 24.21 0.21
4 4.4 5.536 25.22 - 12.61
1,00
5 0 5.731 - - 0.00

6,203
6,203

5,731

5,536

5,031

4,401
4,014

3,955

4,646

4,875

5,004
6,204
4,604

4,604
6,204
6 0 5.503 - - 0.00

0,77

0,55

0,30

0,30
0,71
4,00 4,40 3,09 2,07 14,29 11,34 1,00

Luas (m2) 0.58

5.8
5.75
5.7
5.65
5.6
5.55
5.5
5.45
5.4
5.35
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
2 C2 0.00 M2

D5 Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
7

0 - - 0.00
Elevasi=5.503

5 0 - - 0.00
0 - - 0.00
0 - - 0.00
2,00
0 - - 0.00

4,418

4,606

6,151
4,551

6,151
5,084

4,551
0 - - 0.00

0,30

0,30
11,58 12,41 1,00

Luas (m2) -

12

10

0
0 2 4 6 8 10 12
3 C3 0.00 M2

Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2

D6
0 - - 0.00
7 0 - - 0.00
0 - - 0.00
0 - - 0.00
Elevasi=5.503

0 - - 0.00
0 - - 0.00
2,00
0 - - 0.00

5,086

4,546
6,146
4,613

4,606

6,146
4,546
0 - - 0.00

0,30

0,30
15,83 15,05 1,00

0 - - 0.00
0 - - 0.00
0 - - 0.00

Luas (m2) -

12

10

0
0 2 4 6 8 10 12
4 C4 0.00 M2

Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
D7

0,00 7
0 - - 0.00
45.24
0 - - 0.00
Elevasi=5.503

0 - - 0.00
0,00
5
0,00

0 - - 0.00
2,00 0 - - 0.00

4,673

5,086

5,068
6,154
4,554
4,554
6,154
0 - - 0.00

0,30

0,30
18,03 19,00 1,00
0 - - 0.00
0 - - 0.00
0 - - 0.00

Luas (m2) -

12

10

0
0 2 4 6 8 10 12
5 D1 0.24 M2

Koordinat A B C
No
E1
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
E1
7

5
Elevasi=5. 505

1 0 5.505 - 12.30 (6.15)


2,00
2 2.2348 5.505 12.79 - 6.39

6,205

6,205

5,393

5,411

5,318

5,364

5,378

5,275
6,015
4,615
4,615
6,020
5,723
3 0 5.723 - - 0.00

0,30
1,00
0,30
5,00 3,38 6,29 18,77 18,49 8,91 7,30

4 0 5.505 - - 0.00

Luas (m2) 0.24

5.75
5.7
5.65
5.6
5.55
5.5
5.45
5.4
5.35
0 0.5 1 1.5 2 2.5
6 D2 0.79 M2

Koordinat A B C
E2
No
7
E2
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
Beton
Klas A
Sirtu
E levasi=5.420
5

2,00
1 0 5.42 - 19.20 (9.60)

4,646
2 20.35 6.92 6.72

6,120

6,120
5,746

5,746

5,071

4,184

4,189

4,326

4,771

4,793

4,344
4,929

5,191

5,241
0,30 6,146

4,646
6,146
3.5416 5.42

0,65

0,30
5,00 1,28 4,69 1,50 2,78 8,91 7,67 12,64 12,05 4,07 3,29 1,00

3 1.276 5.746 7.33 - 3.67


4 0 5.746 - - 0.00
5 0 5.42 - - 0.00

5.8
Luas (m2) 0.79
5.7
5.6
5.5
5.4
5.3
5.2
0 0.5 1 1.5 2 2.5 3 3.5 4
7 D3 0.27 M2

Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
E3

7
E3

1 0 5.458 - 9.35 (4.68)


2 1.7137 5.458 9.89 - 4.94
Elevasi =5.458

3 0 5.769 - - 0.00
4 0 5.458 - - 0.00
1,00

6,158

6,158
5,769

4,760

3,776

4,095

4,712

4,222

3,779

4,724

4,539

5,165

4,881

5,162

6,143
4,643
4,643
6,143
4,757

5,234
0,82

0,30

0,30
5,00 5,56 1,45 1,81 6,38 6,71 6,00 3,41 7,60 1,79 7,06 5,89 3,45 1,00

5.8
5.75 Luas (m2) 0.27
5.7
5.65
5.6
5.55
5.5
5.45
5.4
5.35
5.3
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8
8 D4 0.18 M2

Koordinat A B C
No
E4
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
E4
7

5
Elevasi= 5.503
1 0 5.503 - 8.63 (4.31)
2 1.5681 5.503 8.76 4.78 1.99
3 5.00 - 2.50
2,00

0.869 5.589

6,203

6,203
5,753
5,589

5,226

4,211

4,066

4,418

4,613

4,673

4,946

4,673
6,150
4,650
4,650
6,150
4 0 5.753 - - 0.00

0,87

0,30

0,30
5,00 2,95 3,04 4,29 6,03 9,79 14,67 7,58 5,13 1,00

5 0 5.503 - - 0.00

Luas (m2) 0.18

5.8
5.75
5.7
5.65
5.6
5.55
5.5
5.45
5.4
5.35
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8
Section
No. Sketch / Drawing Dimension / Calculation Volume M2
STA
1 C1 24.32 M2
Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2

1 4.4503 5.503 22.39 28.45 (3.03)


2 5.17 5.031 22.75 41.56 (9.40)
3 8.26 4.401 33.16 38.77 (2.81)
D4
4 8.81 4.014 34.84 43.68 (4.42)
5 10.883 3.955 50.56 45.85 2.36
7 D4

Beton
Klas A
6 11.593 4.646 56.52 120.25 (31.87)
7 25.883 4.875 129.52 181.46 (25.97)
Sirtu
Elevasi=5.503

8 37.223 5.004 204.84 186.26 9.29


9 37.223 5.503 204.84 24.49 90.17
1,00
10 4.4503 5.503 - - 0.00
6,203

5,731

5,536

4,646

4,875

6,204

4,604
6,203

5,031

4,401
4,014

3,955

5,004
4,604

6,204
0,77

0,55

0,71

0,30

0,30
4,00 4,40 3,09 2,07 14,29 11,34 1,00

Luas (m2) 24.32

6
5
4
3
2
1
0
0 5 10 15 20 25 30 35 40
2 C2 19.64 M2

D5 Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
7

1 0 4.418 - 51.16 (25.58)


Elevasi=5.503

5 2 11.58 4.606 58.87 110.50 (25.81)


3 23.99 5.084 132.02 121.97 5.03
4 23.99 5.503 132.02 - 66.01
2,00
5 0 5.503 - - 0.00

4,418

4,606

5,084
6,151
4,551
4,551
6,151
6 0 4.418 - - 0.00

0,30
0,30
11,58 12,41 1,00

6 Luas (m2) 19.64

0
0 5 10 15 20 25 30
3 C3 24.03 M2

Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2

D6
1 0 4.613 - 73.02 (36.51)
7 2 15.83 4.606 80.51 142.23 (30.86)
3 30.88 5.086 169.93 157.06 6.44
4 169.93 - 84.97
Elevasi=5.503

5 30.88 5.503
5 0 5.503 - - 0.00
6 0 4.613 - - 0.00
2,00

4,613

6,146

6,146
4,606

5,086
4,546

4,546
0,30

0,30
15,83 15,05 1,00

Luas (m2) 24.03

6
5.5
5
4.5
4
0 5 10 15 20 25 30 35
4 C4 19.34 M2

Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
D7

0,00 7
1 0 4.673 - 84.25 (42.13)
45.24
2 18.03 5.086 91.38 188.33 (48.48)
Elevasi=5.503
0,00

0,00
5
3 37.03 5.068 203.78 187.67 8.05
4 37.03 5.503 203.78 - 101.89
2,00 5 0 5.503 - - 0.00

6,154

4,554
4,673

5,086

5,068
4,554

6,154
6 0 4.673 - - 0.00

0,30

0,30
18,03 19,00 1,00

Luas (m2) 19.34

6
5.5
5
4.5
4
0 5 10 15 20 25 30 35 40
5 D1 8.88 M2

Koordinat A B C
No
E1
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
E1
7

5
El evasi =5.50 5

1 2.2348 5.505 12.05 18.62 (3.29)


2,00
2 3.383 5.393 18.31 52.16 (16.93)

6, 20 5

5 ,364

4, 61 5
6 ,020
6,205

5,723

5,393

5,411

5,318

5,378

5,275
6, 015
4,615
3 9.6721 5.411 51.44 153.90 (51.23)

1 ,00
0,30

0,30
5,00 3,38 6,29 18,77 18,49 8 ,91 7,30

4 28.4421 5.318 152.56 249.56 (48.50)


5 46.9271 5.364 252.37 299.51 (23.57)
6 55.8371 5.378 294.54 339.57 (22.52)
7 63.1414 5.275 347.59 333.07 7.26
8 63.1414 5.505 347.59 12.30 167.65
9 2.2348 5.505 - - 0.00

Luas (m2) 8.88

5.6
5.5
5.4
5.3
5.2
5.1
0 10 20 30 40 50 60 70
6 D2 43.04 M2

Koordinat A B C
E2
No
7
E2 x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
Beton
Kl as A
Si rtu
El evasi =5 .42 0
5

2,00
1 3.5416 5.42 17.96 32.34 (7.19)

6 ,12 0

4 ,18 4
6,1 20

5,7 46

5,7 46

5,071

4,1 89

4 ,326

4,771

4 ,793

4,3 44
4 ,929

5,1 91

5 ,241
6,14 6
4,6 46
4,6 46
6,146
2 5.967 5.071 24.97 37.87 (6.45)

0,6 5

0,30

0,30
5,00 1,28 4,69 1,50 2,78 8,91 7,67 12,64 12,05 4,07 3,29 1,00

3 7.467 4.184 31.28 42.89 (5.81)


4 10.251 4.189 44.35 80.25 (17.95)
5 19.157 4.326 91.40 116.04 (12.32)
6 26.823 4.771 128.56 188.29 (29.86)
7 39.466 4.793 171.44 246.89 (37.73)
8 51.511 4.344 253.90 226.57 13.67
9 52.156 4.929 270.74 277.13 (3.19)
10 56.224 5.191 294.67 308.92 (7.13)
11 59.5112 5.241 322.55 311.90 5.33
12 59.5112 5.42 322.55 19.20 151.68
13 3.5416 5.42 - - 0.00

6
Luas (m2) 43.04
5
4
3
2
1
0
0 10 20 30 40 50 60 70
7 D3 46.25 M2

Koordinat A B C
No
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
E3

7
E3

1 1.7137 5.458 8.16 30.35 (11.09)


2 5.56 4.76 20.99 33.38 (6.19)
E l evasi =5.4 58
5

3 7.0119 3.776 28.71 33.32 (2.30)


4 8.8242 4.095 41.58 39.50 1.04
1, 00

6 ,15 8

6 ,1 58
5 ,7 69

3 ,7 76

4 ,0 95

3 ,7 79

4 ,7 24

4 ,75 7

4,53 9

5 ,1 65

4,88 1

5 ,16 2

5 ,23 4
6 ,1 43
4 ,6 43

4 ,64 3
4,7 60

4,712

4,2 22

6,1 43
0 ,3 0
0 ,82

0 ,30
5 9.6447 4.712 40.72 75.50 (17.39)
5,00 5,56 1,45 1,81 6,38 6,71 6,00 3, 41 7,60 1,79 7,06 5,89 3,45 1,00

6 16.0227 4.222 60.55 95.98 (17.71)


7 22.7332 3.779 107.39 108.56 (0.59)
8 28.7282 4.724 136.66 151.82 (7.58)
9 32.1382 4.757 145.88 189.03 (21.58)
10 39.7382 4.539 205.25 188.50 8.37
11 41.5292 5.165 202.70 250.94 (24.12)
12 48.5852 4.881 250.80 265.90 (7.55)
13 54.4757 5.162 285.13 299.01 (6.94)
14 57.9257 5.234 316.16 303.18 6.49
15 57.9257 5.458 316.16 9.35 153.40
6 16 1.71 5.46 - - 0.00
5 Luas (m2) 46.25
4
3
2
1
0
0 10 20 30 40 50 60 70
8 D4 47.24 M2

Koordinat A B C
No
E4
x y (Xn*Y(n+1)) X(n+1)*Yn (A-B)/2
E4
7

5
Elevasi=5.503
1 1.5681 5.503 8.19 21.02 (6.41)
2 3.82 5.226 16.09 35.86 (9.89)
3 27.90 46.97 (9.53)
2,00

6.862 4.211

6,203

6,203
5,753
5,589

5,226

4,211

4,066

4,418

4,613

4,673

4,946

4,673
6 ,150
4,650
4,650
6,150
4 11.153 4.066 49.27 69.87 (10.30)

0,87

0,30

0,30
5,00 2,95 3,04 4,29 6,03 9 ,79 14,67 7,58 5,13 1,00

5 17.1841 4.418 79.27 119.15 (19.94)


6 26.9691 4.613 126.03 192.06 (33.02)
7 41.6341 4.673 205.92 229.95 (12.02)
8 49.2091 4.946 229.95 268.74 (19.39)
9 54.3351 4.673 299.01 253.91 22.55
10 54.3351 5.503 299.01 8.63 145.19
11 1.5681 5.503 - - 0.00

Luas (m2) 47.24

0
0 10 20 30 40 50 60
Section
No. Sketch / Drawing Dimensio/Calculation
STA

1 A1
Panjang Lebar Luas (M2)
TIMBUNAN 2.57

2 A2
Panjang Lebar Luas (M2)
TIMBUNAN 5.50

3 A3
Panjang Lebar Luas (M2)
TIMBUNAN 3.60

4 A4
Panjang Lebar Luas (M2)
TIMBUNAN 2.00
5 B1
Panjang Lebar Luas (M2)
TIMBUNAN 0.65

6 B2
Panjang Lebar Luas (M2)
TIMBUNAN 0.80

7 B3
Panjang Lebar Luas (M2)
TIMBUNAN 1.40

8 C1
Panjang Lebar Luas (M2)
TIMBUNAN 18.92
9 C2
Panjang Lebar Luas (M2)
TIMBUNAN 12.19

10 C3
Panjang Lebar Luas (M2)
TIMBUNAN 18.92

11 C4
Panjang Lebar Luas (M2)
TIMBUNAN 17.76

12 D1
Panjang Lebar Luas (M2)
TIMBUNAN 31.57
13 D2
Panjang Lebar Luas (M2)
TIMBUNAN 29.75

14 D3
Panjang Lebar Luas (M2)
TIMBUNAN 28.96

15 D4
Panjang Lebar Luas (M2)
TIMBUNAN 21.17

16 E1
Panjang Lebar Luas (M2)
TIMBUNAN 0.88
17 E5
Panjang Lebar Luas (M2)
TIMBUNAN 2.71

18 E6
Panjang Lebar Luas (M2)
TIMBUNAN 4.06

19 E7
Panjang Lebar Luas (M2)
TIMBUNAN 1.46

20 E8
Panjang Lebar Luas (M2)
TIMBUNAN 5.07
PEKERJAAN : Terminal Anak Air
LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME C

1 C1 0.58
0.29 16.00 4.60
2 C2 -
- -
3 C3 -

4 C4 -

Jumlah 4.60
HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME D

1 D1 0.24
0.12 20.53 2.50
2 D2 0.79
0.39 10.00 3.93
3 D3 0.27
0.13 20.62 2.75
4 D4 0.18

Jumlah 9.17
PEKERJAAN : Terminal Anak Air
LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME C

1 C1 24.32
21.98 16.00 351.66
2 C2 19.64
21.84 16.00 349.39
3 C3 24.03
21.68 16.00 346.94
4 C4 19.34

Jumlah 1,047.99
HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME D

1 D1 8.88
25.96 10.53 273.37
2 D2 43.04
44.65 10.00 446.49
3 D3 46.25
46.75 20.62 963.94
4 D4 47.24

Jumlah 1,683.79
PEKERJAAN : Terminal Anak Air
LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME A

1 A1 2.57
4.04 17.00 68.60
2 A2 5.50
4.55 20.00 91.00
3 A3 3.60
2.80 20.00 56.00
4 A4 2.00

Jumlah 215.60
HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME B

1 B1 0.65
0.73 11.30 8.19
2 B2 0.80
1.10 20.00 22.00
3 B3 1.40

Jumlah 30.19
HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME C

1 C1 18.92
15.56 16.00 248.88
2 C2 12.19
15.56 16.00 248.88
3 C3 18.92
18.34 16.00 293.44
4 C4 17.76

Jumlah 791.20
HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME D

1 D1 31.57
30.66 20.53 629.45
2 D2 29.75
29.36 10.00 293.55
3 D3 28.96
25.07 20.62 516.84
4 D4 21.17

Jumlah 1,439.84
HITUNGAN

Luas Luas
Panjang Volume
AREA Rata-rata
No. Keterangan
(M2) (M2) (M) (M3)

VOLUME E

1 E1 0.88 0.88 16.00 14.08

2 E5 2.71
3.385 16.00 54.16
3 E6 4.06
2.76 13.49 37.23
4 E7 1.46
3.265 16.70 54.53
5 E8 5.07

Jumlah 160.00
REKAPITULASI VOLUME TIMBUNAN

PEKERJAAN : Terminal Anak Air


LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

No. Uraian Satuan Kuantitas Keterangan

1 Volume Galian Area C M3 4.600

2 Volume Galian Area D M3 9.174

Jumlah Volume Jumlah 13.77

, ........................ 2022
Dibuat Oleh

...........................................
..........................

Disetujui
REKAPITULASI VOLUME TIMBUNAN

PEKERJAAN : Terminal Anak Air


LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

No. Uraian Satuan Kuantitas Keterangan

1 Volume Timbunan Area C M3 1,047.992

2 Volume Timbunan Area D M3 1,683.795

Jumlah Volume Jumlah 2,731.79

, ........................ 2022
Dibuat Oleh

...........................................
..........................

Disetujui
REKAPITULASI VOLUME TIMBUNAN

PEKERJAAN : Terminal Anak Air


LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

No. Uraian Satuan Kuantitas Keterangan

1 Volume Sirtu A M3 215.595

2 Volume Sirtu B M3 30.193

3 Volume Sirtu C M3 791.20

4 Volume Sirtu D M3 1,439.84

5 Volume Sirtu E M3 160.00

Jumlah Volume Jumlah 2,636.83

, ........................ 2022
Dibuat Oleh

...........................................
..........................

Disetujui
REKAPITULASI VOLUME TIMBUNAN

PEKERJAAN : Terminal Anak Air


LOKASI : Kota Padang
SATUAN PEMBAYARAN :
TANGGAL PEKERJAAN :

No. Uraian Satuan Kuantitas Keterangan

1 Volume Bantalan Rel A M2 1,922.00


1 Volume Bantalan Rel B M2 1,078.000

Jumlah Volume Jumlah 3,000.00

, ........................ 2022
Dibuat Oleh

...........................................
..........................

Disetujui
AKTUAL CHECK

Pekerjaan : Penigkatan Terminal Anak Air Type A Kota Padang


Lokasi : Terminal Type A , Anak Air Kota Padang

No Gambar Uraian Stn Pjg Lbr Tgg Jmh Byk Vol Total
AKTUAL CHECK

Pekerjaan : Penigkatan Terminal Anak Air Type A Kota Padang


Lokasi : Terminal Type A , Anak Air Kota Padang

No Gambar Uraian Stn Pjg Lbr Tgg Jmh Byk Vol Total

B PEKERJAAN LANSEKAP
I Pekerjaan Galian Tanah 13.77
1 Volume Galian Area C m3 4.60
2 Volume Galian Area D m3 9.17

II Pekerjaan Timbunan Tanah 1,047.99


1 Volume Timbunan Area C m3 1,047.99
2 Volume Timbunan Area D m3 1,683.79

III Pekerjaan Timbunan Sirtu 2,636.83


1 Volume Sirtu A m3 215.60
2 Volume Sirtu B m3 30.19
1 Volume Sirtu C m3 791.20
2 Volume Sirtu D m3 1,439.84
1 Volume Sirtu E m3 160.00

IV Pekerjaan Bantalan Rel


1 Urugan Tanah Gunung m3 6000.00 x 0.02 144.00

2 Pas. Bantalan Rel unit 3000.00 = 6000.00 6,000.00


Bantalan Rel per Unit = 0.5m2
RENCANA ANGGARAN BIAYA

Pekerjaan : Peningkatan Terminal Anak Air Type A Kota Padang


Lokasi : Terminal Anak Air Type A Kota Padang

B. Pekerjaan Lansekap

HARGA JUMLAH
NO URAIAN PEKERJAAN STN SATUAN VOL HARGA KET
( Rp ) (RP)
1 2 3 4 5 6 7

I Pekerjaan Galian Tanah


Volume Galian Area C M3 4.60 -
Volume Galian Area D M3 9.17 -

II Pekerjaan Timbunan Tanah -


Volume Timbunan Area C M3 1,047.99 -
Volume Timbunan Area D M3 1,683.79 -

III Pekerjaan Timbunan Sirtu


Volume Sirtu A M3 215.60 -
Volume Sirtu B M3 30.19 -
Volume Sirtu C M3 791.20 -
Volume Sirtu D M3 1,439.84 -
Volume Sirtu E M3 160.00 -

IV Pekerjaan Bantalan Rel


1 Urugan Tanah Gunung M3 144.00 -
2 Pas. Bantalan Rel Unit 6,000.00 -

Jumlah Total -
RENCANA ANGGARAN BIAYA

Pekerjaan : Peningkatan Terminal Anak Air Type A Kota Padang


Lokasi : Terminal Anak Air Type A Kota Padang

A. Biaya Penerapan SMKK

HARGA JUMLAH
NO URAIAN PEKERJAAN STN SATUAN VOL HARGA KET
( Rp ) (RP)
1 2 3 4 5 6 7
I PENYIAPAN RENCANA KESELAMATAN KONSTRUKSI
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Ls 3,000,000.00 1.00 3,000,000.00
Kerja
2 Pembuatan Kartu Identitas Pekerja Org 25,000.00 10.00 250,000.00
3 Simulasi K3 Org 50,000.00 10.00 500,000.00
4 Spanduk ( Banner ) Lb 200,000.00 1.00 200,000.00
5 Poster Lb 200,000.00 1.00 200,000.00
6 Papan Informasi K3 Bh 200,000.00 1.00 200,000.00
Jumlah 4,350,000.00
II ALAT PELINDUNG KERJA
1 Pembatas Area (Restricted Area) Ls 3,000,000.00 1.00 3,000,000.00
2 Tali Keselamatan (life Line) Ls 2,500,000.00 1.00 2,500,000.00
Jumlah 5,500,000.00
III ALAT PELINDUNG DIRI
1 Topi Pelindung (Safety Helmet) Bh 45,000.00 10.00 450,000.00
2 Pelindung Mata (Googles, Spectacles) Psg 75,000.00 - -
3 Pelindung Pernafasan dan mulut (Masker) Box 20,000.00 - -
4 Sarung Tangan (Safety Gloves) Psg 50,000.00 10.00 500,000.00
5 Sepatu keselamatan Safety shoes,untuk staff Psg 325,000.00 3.00 975,000.00
6 Sepatu keselamatan (Rubber safety shoes toe cap) Psg 145,000.00 10.00 1,450,000.00
7 Rompy keselamatan (safety Vest) Bh 47,500.00 10.00 475,000.00
8 Penunjang seluruh tubuh (Full Body harness) Bh 265,000.00 - -
9 Pelindung jatuh (Fall arrester) Bh 375,000.00 - -
Jumlah 3,850,000.00
IV PERSONIL KESELAMATAN KONSTRUKSI
1 Petugas K3 Bln/Org 3,000,000.00 1.00 3,000,000.00
Jumlah 3,000,000.00
V FASILITAS SARANA KESEHATAN

1 Peralatan PP3K (kotak P3K tandu, tabung


oksigen,obat luka,perban dll) Ls 2,000,000.00 1.00 2,000,000.00

Jumlah 2,000,000.00
VI RAMBU RAMBU
1 Rambu petunjuk Bh 100,000.00 1.00 100,000.00
2 Rambu larangan Bh 100,000.00 1.00 100,000.00
3 Rambu peringatan Bh 100,000.00 1.00 100,000.00
4 Rambu kewajiban Bh 100,000.00 1.00 100,000.00
5 Rambu Informasi Bh 100,000.00 1.00 100,000.00
6 Tongkat Pengatur lalu lintas Bh 100,000.00 1.00 100,000.00
Jumlah 600,000.00
VII LAIN LAIN TERKAIT PENGENDALIAN RESIKO K3
1 Alat pemadam api ringan (APAR), 6kg Bh 750,000.00 1.00 750,000.00
2 Bendera K3 Bh 50,000.00 1.00 50,000.00
3 Pelaporan K3 Bh 250,000.00 1.00 250,000.00
Jumlah 1,050,000.00
Jumlah Total 20,350,000.00
RENCANA ANGGARAN BIAYA

Pekerjaan : Peningkatan Terminal Anak Air Type A Kota Padang


Lokasi : Terminal Anak Air Type A Kota Padang

C Pekerjaan Lansekap

HARGA JUMLAH
NO URAIAN PEKERJAAN STN SATUAN VOL HARGA KET
( Rp ) (RP)
1 2 3 4 5 6 7

I Mobilisasi dan Demobilisasi Excavator mini Unit 5,000,000.00 1.00 5,000,000

II Angkutan Bantalan Rel Jam -

Jumlah Total 5,000,000.00


REKAPITULASI
Pekerjaan : Peningkatan Terminal Anak Air Type A Kota Padang
Lokasi : Terminal Anak Air Type A Kota Padang

TOTAl HARGA
NO URAIAN PEKERJAAN KET
(Rp)
1 2 3 4

1 Pekerjaan Mobilisasi dan Demobilisasi

2 Penerapan SMKK

3 Pekerjaan Lansekap -

Jumlah -
PPN 10% -
Jumlah -
Konsultan Perancangan -
Konsultan Supervisi -
Jumlah -
Dibulatkan -

Terbilang : Seratus Dua Puluh Tujuh Juta Tujuh Ratus Dua Puluh Lima Ribu Rupiah

Padang, 2022

Disahkan Oleh, Dibuat oleh,


Kuasa Pengguna Anggaran Pejabat Pembuat Komitmen
Balai Transportsi Darat Wilayah III Balai Transportsi Darat Wilayah III
Provinsi Sumatera Barat Provinsi Sumatera Barat

DENY KUSDYANA, AMTrD., MMTr SUMARTA ENDRA, S.ST (TD)


NIP. 19700429 199803 1 002 NIP. 19940305 201902 1 003
DAFTAR HARGA DASAR SATUAN UPAH

URAIAN HARGA HARGA


No. KODE KETERANGAN SATUAN PERJAM SATUAN PERHARI
( Rp.) ( Rp.)

1 Pekerja L01 15,000.00 105,000.00


2 Tukang L02 21,428.57 150,000.00
3 Kepala Tukang L03 25,000.00 175,000.00
4 Mandor L04 25,000.00 175,000.00
5 Juru ukur L05 25,714.29 180,000.00
6 Pembantu juru ukur L06 15,000.00 105,000.00
7 Sopir / Driver L10 Upah dihitung dengan 25,714.29 180,000.00
jumlah hari kerja di
8 Pembantu Sopir / Driver L11 asumsikan 25 hari 15,000.00 105,000.00
9 Operator L12 dalam sebulan. Jam 25,714.29 180,000.00
10 Pembantu Operator L13 kerja efektif 15,000.00 105,000.00
diasumsikan 7 jam
11 Mekanik L14 sehari. 25,714.29 180,000.00
12 Pembantu Mekanik L15 15,000.00 105,000.00
13 Desain engineer L16 25,714.29 180,000.00
14 Operator komputer/printer/pl L17 17,142.86 120,000.00
15 Drafter Cad / Estimator L18 25,714.29 180,000.00
16 Penjaga malam L19 20,571.43 144,000.00
17.00 25,714.29 180,000.00
DAFTAR HARGA DASAR SATUAN BAHAN

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

A. KELOMPOK AIR,TANAH,BATU DAN SEMEN


1 Air M.02 M3 18,100.00
2 Pasir Pasang (Sedang) M01b M3 184,100.00 Base Camp
3 Pasir Beton (Kasar) M01a M3 182,200.00 Base Camp
4 Pasir Halus (untuk HRS) M01c M3 183,800.00 Base Camp
5 Pasir Urug M44 M3 136,800.00 Base Camp
6 Batu Kali M02 M3 226,300.00 Lokasi Pekerjaan
7 Agregat Pecah Mesin 20-30 mm M93 M3 245,400.00 Base Camp
Agregat Pecah Mesin 5-10 &
8 10-20 mm (agregat sedang) M92 M3 235,900.00 Base Camp

9 Agregat Pecah Mesin 0-5 mm (a M91 M3 261,100.00 Base Camp


10 Bahan Agr.Base Kelas A M26 M3 453,525.00 Base Camp
11 Bahan Agr.Base Kelas B M27 M3 415,575.00 Base Camp
12 Bahan Agr.Base Kelas C M28 M3 413,100.00 Base Camp
13 Batu Pecah 5/10 M3 340,750.00
14 Batu Pecah 5/7 M3 340,750.00
15 Batu Pecah 3/4 M3 340,750.00
16 Batu Pecah 2/3 M3 310,506.25
17 Batu Pecah 1/2 M3 307,425.00
18 Split 0..5 - 1 cm M3 323,925.00
19 Filler M05 Kg 2,700.00 Proses/Base Camp
20 Batu Belah M06 M3 257,000.00 Lokasi Pekerjaan
21 Gravel M07 M3 133,900.00 Base Camp
22 Bahan Tanah Timbunan M08 M3 64,200.00 Borrow Pit/quarry
23 Bahan Pilihan M09 M3 137,900.00 Quarry
24 Abu Batu / Pasir saring M.01 M3 271,200.00
25 Sirtu M16 M3 172,200.00 Lokasi Pekerjaan
26 Kerikil/agregat Beton M.06 M3 175,700.00
27 Tanah liat M.17a M3 75,000.00
28 Bahan Aditif (Caldbon, Strorox, M.03 Ltr 50,400.00
29 Batu bata / merah bakar kelas M.04.a Bh 900.00
30 Batu bata / merah bakar biasa M.04.b Bh 700.00
31 Batu bata / merah bakar kelas M.04.c Bh 800.00
32 Semen / PC (50kg) M12 Zak 64,000.00 Base Camp
33 Semen / PC (kg) M12 Kg 1,280.00 Base Camp
34 Semen Putih M12a kg 4,800.00
35 Semen Merah kg 14,800.00
36 Lem Rakol tube 18,600.00
37 Semen Warna (Tepung Affa) M.15b Kg 15,400.00
38 Additive M67a Ltr 75,000.00
39 Curing Compound M98 Ltr 46,200.00
40 Elastomer M62 Bh 2,665,100.00
41 Arbocell M45 Kg. 93,700.00 Base Camp
42 Chipping M41 M3 259,000.00 Base Camp
43 Plastik Filter M23 M2 53,800.00
44 Plastik cor (Hitam) M23a M2 5,000.00
45 Lempengan rumput / Gebalan M32 M2 25,000.00 Lokasi Pekerjaan
46 Bata Ringan 20 x 60 x 10 cm Bh 15,400.00 Kunango Jantan
47 Bata Ringan 20 x 60 x 7.5 cm Bh 14,800.00 Kunango Jantan
ANALISA HARGA SATUAN FISIK

Pekerjaan : Peningkatan Terminal Type A Anak Air Kota Padang


Lokasi : Terminal Type A Anak Air Kota Padang
Tahun : 2022
Analisa Galian Tanah Biasa dalam 1 meter / M3
UPAH :
0.750 OH Pekerja Rp. 105,000.00 Rp. 78,750.00
0.025 OH Mandor Rp. 175,000.00 Rp. 4,375.00 Rp. 83,125.00
Jumlah Rp. 83,125.00
Overhead Fee 10% Rp. 8,312.50
Dibulatkan Rp. 91,438.00

Mengurug 1 m3 Sirtu
UPAH :
0.300 OH Pekerja Rp. 105,000.00 Rp. 31,500.00
0.010 OH mandor Rp. 175,000.00 Rp. 1,750.00 Rp. 33,250.00
BAHAN :
1.200 M3 Sirtu Rp. 172,200.00 Rp. 206,640.00 Rp. 206,640.00
Jumlah Rp. 239,890.00
Overhead Fee 10% Rp. 23,989.00
Dibulatkan Rp. 263,879.00

Mengurug 1 m3 Pasir Gunung


UPAH :
0.300 OH Pekerja Rp. 105,000.00 Rp. 31,500.00
0.010 OH mandor Rp. 175,000.00 Rp. 1,750.00 Rp. 33,250.00
BAHAN :
1.200 M3 Pasir Gunung Rp. 184,100.00 Rp. 220,920.00 Rp. 220,920.00
Jumlah Rp. 254,170.00
Overhead Fee 10% Rp. 25,417.00
Dibulatkan Rp. 279,587.00
FORMULIR STANDAR UNTUK
ANALISA HARGA SATUAN PEKERJAAN

ITEM PEMBAYARAN NO. :


JENIS PEKERJAAN Pengangkutan Bantalan Beton termasuk sistem penambat
SATUAN PEMBAYARAN :

HARGA JUMLAH
NO. KOMPONEN SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. - Mandor (L04) Oh 0.036 175,000.00 6,250.00
2 - Pekerja (L01) Oh 0.286 105,000.00 30,000.00

JUMLAH HARGA TENAGA 36,250.00

B. BAHAN

1. Bantalan Beton Set 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Flat Bed Truck Jam 0.0986 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 36,250.00


E. OVERHEAD & PROFIT 10.0 % x D 3,625.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 39,875.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, untuk bahan dalam ukuran berat.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.