Professional Documents
Culture Documents
Footing Shedule
Footing Shedule
F-2=2Nos 8'-0" X 10'-0" 15" 3" 18" 18" 16 mm Ø @ 6" c/c. 16 mm Ø @ 6" c/c.
F-3=2Nos 9'-0" X 9'-0" 15" 3" 18" 18" 16 mm Ø @ 6" c/c. 16 mm Ø @ 6" c/c.
CF-=1Nos 18'-0" X 20'-0" 21" 3" 24" 24" 16 mm Ø @ 4" c/c bot. 16 mm Ø @ 4" c/c bot.
16 mm Ø @ 7" c/c. top 16 mm Ø @ 7" c/c. top
Note:
f'c= 3500 Psi (Only Column )
f'c = 2500 Psi (Others works)
fs = 60,000 Psi:
Sand = 2.5 , Cement- OPC , Stone Chips w/c =0.35~0.45
Ratio : 1:1.5:3
Note:
GRADE BEAM
EGL(±0 )
X X
T T
m
18"
D
d1
1'-0"
3" PCC
12" Sand Compaction
JOB NO
PROJECT LOCATION
Mobile : 01729-999949
Md. Shamim Sardar Sabrina Rahman Seba
CLIENT.
Mobile : 01792-716906