Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

PETROCON ECC WLL

DRILLING MACHINE INSPECTION CHECKLIST

Date: Make: Model:

Equipment Name & Number Drilling Machine &


Note: Please write Yes or No in the given box and if some comments write in remarks column.

ITEM YES NO REMARKS

Is the Drill machine in good and working condition.


Is Power cable free from damages and connection
taken through industrial plug.
Is flexible cord provided to keep cable free from damage.

Is Dead man switch provided and in working condition

Is handle provided for better control

Is drill bit in good condition and free from defect.


Always use designated key for removing and changing
drill bit.
Drill machine should be double insulated otherwise grounded.

FIT UNFIT
Inspected By Reviewed By :
Name : Name :
Signature with Date Signature with Date

You might also like