Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

30000 TOTAL WIDTH

16000 ROB VIADUCT


6000 500 FRL 500 6000
SLIP ROAD KERB KERB SLIP ROAD
SLOPE* SLOPE*
U/S SLOPE 2.5 % SLOPE 2.5 % D/S

CRUST CRUST HEAD WALL


IN PCC M20
EARTH FILL 300 THK DRY STONE
EARTH FILL EARTH FILL PITCHING OVER
150 THK GRANULAR
2 2 MATERIAL BACKING
BED LVL 1 INV. LVL.(U/S) INV. LVL.(D/S) 1
SLOPE 1 IN 1000
300
1500 3000

COMPACTED GRANULAR ℄ OF STRUCTURE 300 THK STONE


PITCHING FOR APRON
MATERIAL OR PCC M15
SECTION A-A
RUBBLE FILLING INCLUDING
FILLING VOIDS WITH SAND/GRIT

℄ OF STRUCTURE

SLOPE 2:1 6000 B 500 16000 500 6000 SLOPE 2:1

SLOPE 2.50% SLOPE 2.50% SLOPE 2.50% SLOPE 2.50%

℄ OF STRUCTURE
6400 (LENGTH OF HEAD WALL)
A U/S D/S A

COMPACTED GRANULAR
MATERIAL OR PCC M15

SLOPE 2.50% SLOPE 2.50% SLOPE 2.50% SLOPE 2.50%

SLOPE 2:1 SLOPE 2:1


B

DRAWING TITLE

GENERAL ARRANGEMENT DRAWING OF NEW PROPOSED PIPE


CULVERT 1X1200 mm UNDER ROB PORTION
DRAWING NO.

You might also like