The Five Phases of Hotel Development
The Five Phases of Hotel Development
This phase includes defining project objectives and defining development issues.
It is also necessary to find out if there are any restrictions on land use and determine the
configuration of the hotel.
And also, in this phase, you need to develop a flowchart of the project and a preliminary
master plan.
This phase includes selecting a qualified consultant to conduct the study. It is also
necessary to identify and select elements that will be covered in the study and also use the results
of the feasibility study.
In this phase, it is necessary Assemble the land/acquire the site, Secure agreements from
public entities for development and funding assistance.
Also, in this phase it is necessary to: Select and contract with a hotel operator for
franchise rights, affiliation, and/or management assistance.; Obtain development rights for the
site; Develop overall land-use plan; Select the project architect and engineer; Refine project
development costs, schedules, and drawings; Obtain the necessary government approvals and
documents, Determine the ownership structure and obtain financing.
In this phase, it is necessary to: Conceptualize and complete the architectural design and
physical layout; Allocate space; plan energy and technical systems; Construct the facility;
Interface architecture, landscaping, and interior design.
In this phase, it is necessary to: initiate a marketing campaign; recruit and train staff;
organize departments. maintain the facility.