Professional Documents
Culture Documents
Alw Cross Section + Criteria
Alw Cross Section + Criteria
· Ev 2 > 60MPa
· Rayleigh wave velocity) >
1.6 x design train speed
s
le ALW SCEW cl. 5.8.7)
r ab
l ive Sub-Formation Level
de
IFC Upper Embankment Fill (UEF)
In · Ev 2>60MPa Average / Min individual result of 50Mpa per km
with 1 test / 200m Centre Line every 1m height
Down Up
(Table at the end of App. B in ALW SCEW - Contract-specific Tables to 600 Series Appendices )
X
1 1
5.0% 5.0%
Lower Embankment Fill (LEF) Protection Layer
4%
2
Top of Foundation Level 1
· Ev 2 >60MPa when Where the top of Upper Embankment Fill - Class 9J
Foundation is <2.0m below Formation Level
(HS2-HS2-GT-STD-000-000001 P08 Table 4.2/2)
CONSTRUCTION SEQUENCE
A. WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH THE SEQUENCING SPECIFIED IN THE HS2
SPECIFICATION FOR CIVIL ENGINEERING WORKS SERIES 0600: EARTHWORKS
(HS2-HS2-CV-SPE-000-010600).
LEGENDS:
TOPSOIL
NO
FILTER MATERIAL
T
STARTER LAYER LANDSCAPE EARTHWORKS FILL In
TOPSOIL STRIPPING OR ZONE 1
IF
SUBSOIL STRIPPING LANDSCAPE EARTHWORKS FILL C
UPPER EMBANKMENT FILL
ZONE 2
de
LANDSCAPE EARTHWORKS
liv
LOWER EMBANKMENT FILL FILL ZONE 3 (CLASS 4)
e ra
PROTECTION LAYER DRAINAGE STONE
bl
PREPARED SUBGRADE GEOTEXTILE SEPARATOR es
NATURAL GROUND EXISTING GROUND LEVEL
WALKWAY