DESIGN 

CONSULTANCY SERVICE 
FOR HEALTH FACILITIES IN YEMEN 

22754 
KfW‐SRHSP‐COV2‐02‐ AL‐SADAQA IU 

Project Brief and Scope of Interventions 
Revision ‐2‐ February 2022

Al Sadaqah Isolation Unit  
Al Shiekh Othman District ‐ Aden Governorate 
Republic of Yemen 
Table of Contents 
1.  Introduction. .................................................................................................................................. 4 
2.  Scope of Works .............................................................................................................................. 5 
2.1.  Architectural Works ................................................................................................................... 5 
2.1.1.  Planning .................................................................................................................................. 5 
2.1.1.1.  DEMOLISHING PLAN ........................................................................................................... 7 
2.1.1.2.  NEW PARTITIONS PLAN ...................................................................................................... 8 
2.1.1.3.  ISOLATION UNIT ZONING PERSPECTIVE ............................................................................. 9 
2.1.1.4.  REMODELED ISOLATION UNIT KEY ELEMENTS ................................................................ 10 
2.1.1.5.  1.5. PATIENT FLOW, FROM ENTRY TO SAMPLING ........................................................... 11  
2.1.1.6.  PATIENT FLOW FOR CONFIRMED CASES .......................................................................... 12 
2.1.1.7.  PROPOSED IU ACCESS (ENTRANCE & EXITS) .................................................................... 13 
2.1.1.8.  STAFF FLOW ...................................................................................................................... 14  
2.1.2.  Architectural interventions – Finishes and interior architecture ....................................... 15 
2.1.3.  Architectural‐ Site Works ..................................................................................................... 16 
2.1.3.1.  Demolition Plan ................................................................................................................ 16 
2.1.3.2.  Proposed Site Plan ............................................................................................................ 17 
2.2.  Structural Works: ..................................................................................................................... 18  
2.2.1.  Design Codes and Standards ................................................................................................ 18 
2.2.2.  Design Software programs ................................................................................................... 18 
2.2.3.  Design Criteria ...................................................................................................................... 19  
2.2.3.1.  Loading .............................................................................................................................. 19 
2.2.3.2.  Loading Combinations ...................................................................................................... 20 
2.2.3.3.  Materials ........................................................................................................................... 20 
2.2.3.3.1.  Concrete ............................................................................................................................ 20 
2.2.3.3.2.  Reinforcing Steel Bars ....................................................................................................... 21 
2.2.3.3.3.  Structural Steel .................................................................................................................. 21 
2.2.3.4.  Proposed Methodology of work ...................................................................................... 21 
2.2.3.5.  Agreed Building Modifications: ........................................................................................ 22 
2.3.  MECHANICAL WORKS............................................................................................................... 22 
2.4.1.  HVAC SYSTEM WORKS .......................................................................................................... 22 
2.4.2.  MEDICAL GASES WORKS ...................................................................................................... 24 
2.4.3.  PLUMBING WORKS ............................................................................................................... 24 
2.4.4.  FIRE PROTECTION WORKS .................................................................................................... 25 
2.4.5.  FUEL SYSTEM ASSESSMENT: ................................................................................................. 25 

2|Page
2.4.  ELECTRICAL WORKS: ................................................................................................................. 25 
2.4.1.  Electrical Power Source: ....................................................................................................... 25 
2.4.2.  GENERATOR SETS: ................................................................................................................ 26 
2.4.3.  UNINTERRUPTIBLE POWER SUPPLY: .................................................................................... 26 
2.4.4.  ISOLATED POWER SYSTEM (IPS): ......................................................................................... 26 
2.4.5.  CABLES AND CABLE WAY SYSTEM ....................................................................................... 27 
2.4.6.  LV DISTRIBUTION BOARDS ................................................................................................... 27 
2.4.7.  EARTHING AND EQUIPOTENTIAL BONDING SYSTEM .......................................................... 28  
2.4.8.  LIGHTNING PROTECTION SYSTEM ........................................................................................ 29 
2.4.9.  LIGHTING SYSTEM ................................................................................................................. 29 
2.4.10.  PLUGS AND SOCKET OUTLETS SYSTEMS .............................................................................. 30 
2.4.11.  ISOLATION AND SWITCHING ................................................................................................ 30 
2.4.12.  Telephone and Data Systems ............................................................................................... 30 
2.4.13.  Fire Alarm Detection & Voice Evacuation System ............................................................... 30 
2.4.14.  IP Surveillance System .......................................................................................................... 31 
2.4.15.  IP NURSE CALL SYSTEM ........................................................................................................ 31 
2.5.  WASTE MANAGEMENT WORKS ............................................................................................... 32 
2.5.1.  Municipal Waste Management:........................................................................................... 32 
2.5.2.  Medical Waste Management ............................................................................................... 32 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 