Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Hellooo

Summary
The article from VNexpress International by Phuoc Tuan is about the dismantling
of famous impromptu greenhouses in Da Lat due to endangering ecological safety
in this area. In the central highlands province of Lam Dong, the Department of
Agriculture and Rural Development has been working hard to implement a plan to
eliminate poorly managed greenhouses through 2030. In a land famous for many
fresh flower exports to foreign markets (even the Netherlands also imports flowers
from Da Lat), it is known that the greenhouses here are built by private individuals
and businesses with little knowledge and local workers are self-taught by using
iron and bamboo sticks, without much concern for eco-safety. The greenhouses are
erected not in accordance with modern environmental protection standards, which
cause these greenhouses cannot absorb water from the stormy environment,
causing severe flooding and causing loss of urban beauty because of the rapid
spontaneity. Local authorities are actively pooling capital to ask them to remove
their innovations and move to a more environment-friendly model. The project is
estimated to cost about 178 billion VND (7.5 million USD) of which 173 billion
VND will be obtained from private donors.
Response
After reading the article about the massive appearance of spontaneous flower
greenhouses causing ecological insecurity, I clearly see the increased awareness of
local authorities in Da Lat city, Lam Dong province. In the past 20 years, people
and small flower growing businesses have become too dependent on these
greenhouses, they have built their own greenhouse models that do not meet the
conservation standard of environmental protection. They use non-specialized raw
materials and only see the immediate benefit that is the export of flowers to
domestic and foreign markets. Da Lat is known as the city of thousands of flowers,
with a favorable location and climate for the proliferation of different flowers, it is
not surprising that flowers in the city have the highest amount of exported flowers
with high quality. Along with pride is anxiety because the massive appearance
caused the government to lose control and cause flooding in this area. The project
predicted to last until 2030 shows the calculation for the following environmental
problems. I hope the project will be successful and the environmental protection
plan will be completed successfully.
In my previous response, the environmental problem I mentioned was the pollution
in the capital. Even the capital or just a small city like Da Lat, the environment is
always a big challenge for all levels of government. I feel the government is
making great efforts in solving environmental problems. They were aware of the
importance and took appropriate measures. Personally, I think maintaining a clean
and green environment is the responsibility of each individual, not the
government's own. Each person must have a sense of protecting the environment
and not be subjective when seeing that the problems have been solved.
Environmental protection is a long-term responsibility that requires awareness and
determination.
Credibility
I took this article from VN Express, the site that I always choose to read daily
news. I believe the site is trustworthy and also say no to bias issue. On
environmental topics, the newspaper also quickly updates the data as well as
reports the truth to warn the people.

You might also like