DESCRIPTION UNIT QTY CHEC RATE ACCESS RATE AMOUNT CHEC AMOUNT REMARKS
Access Road to be Completed
Paranthan-poonaryn road drain cover and foot path slab installation work to be completed
CH 20+400-20+460 LHS retain wall extension and guard stone installation to be completed
Soil sloping and grass sodding at the edge of concrete draings to be completed
m3
ACCESS
AMOUNT CHEC AMOUNT REMARKS
g ground levals beside the culvert
- -
-
ts to be completed
-
-
e completed
-
-
o be completed
-
completed
-
ands to be completed
-
draings to be completed
-