Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

012131ÿ256738ÿ9

ÿ 9ÿ
9ÿ
ÿÿ2ÿ8 
 ÿÿ89
9ÿ
 ÿ9 9ÿÿ5
ÿÿ

GHIJHKL
8 
ÿ99ÿ : ;<ÿ:9 ÿ
=
ÿ 9>1ÿ
3?ÿÿ9ÿ 2:=ÿ
8 ;;ÿ 2:=ÿ
 ÿ 2:=ÿ
9
 ÿ =999ÿ9ÿ@82#ABÿ
8C ÿ 3?ÿ
ÿ89D!ÿ
9
ÿ 39ÿE ;ÿ@9
ÿ9
Bÿ
E9D!ÿ 3?ÿ
Fÿ2ÿ 
ÿ89D! ÿ

$%&'%&('%'')(*+,-./0(1(23(456(57(%%ÿ 9!ÿ"#ÿ
KEY PLAN:
1 6 14 25 34
MECCA
U
N
88 89 85 101 S-FA-05 S-FA-02
689 689 689 789-6
S-AC-01
43

L
CONCEALED
650 S/O ACCESS PANEL

1170
T4
3170 200 600 1230
A
150 S-FA-01
1255

285
81 LEGENDS & PARTICULAR NOTES:
S-WH-01

620

620
689

S-WH-02
1240

S-AC-04
82 S-FA-04
689
1400 850 S/O 940 180
S-AC-02
810C/O WASTE BIN S-WH-04
76
789-5 S-AC-15
700 840
S-AC-13
WASTE BIN
580

AP-TV-03 S-AC-05
S-FA-55
83
689 600 S-WH-49
S-FA-60
2160

1000

MIRROR TV

84 LF-18
689

11
789-10
76
580

789-5
880 S/O S-AC-15
1385 840 235 1440

05
220

810C/O
789-10 LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
220 175 850 150
640

200

100
GENERAL NOTES:
220

100
S-FA-68 All written dimensions shall have precedence over drawing scale. The
S-AC-04 Engineer shall be notified of any errors or dimensions requiring correction. All
185

1125 1125
S-FA-07 dimensions are to grid line or face of wall finish unless otherwise noted.
86
689
S-FA-68 The Contractor shall provide all necessary blocking, framing, hangers or
280

2100

other support fixing for fixtures, equipment, cabinetwork or similar requiring


S-FA-08 integrated stability. Similarly, all bonding methods for fixing are
the responsibility of the Contractor. All wall and ceiling linings (including
1420
530

87
S-FA-10 S-AC-04 surface finishes, applied coatings and treatments, substrates and framing)
689
100 are to be non-combustible to meet local authority regulations or to meet the
equivalent standards of non-combustibility of adopted regulations in force.
730
280

450 S-FA-13 The Contractor shall provide all necessary shop fabrication drawings to the
1125 100 1000 S/O 300
S-FA-09 Engineer for checking prior to manufacture to ensure that design integrity is
150 185

900C/O maintained. The Contractor is to provide finished samples of all exposed


2250 01 materials to the Engineer for approval prior to ordering or manufacturing. All
789-12 construction shall comply with all current local building codes and regulations.
All Drawings shall be read in conjunction with the project specifications and
drawings related to all other disciplines.

29
77 BUILDERS WORK & ELECTRICAL PLAN 789-2
78 SANITARYWARE PLAN
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level

REVISION

04
789-12 DATE REV. APP. BY REVISION DETAILS
02.10.2020 00 JH APPROVED ISSUE

2980 1236 3020

ROLLER BLINDS AND


250

150 2680 150 1230


100 MULLION CHANNELS
600

S-AC-14

D
1150
EQ EQ EQ

1200
700

FCH 3000 FCH 3000


1390

1390
D
SLOPE 0.5%
600

PROJECT
F-ST-53 F-ST-53 F-PT-03
250

50
2450

02 810
KATARA TOWERS AT LUSAIL

190
789-18
Lusail District, Doha
3623

3970

430
CLIENT

Katara Hospitality
1060

Katara Hospitality Building, Marina District,


50 50 FCH 3000 Lusail City, PO Box 2977 Doha, Qatar
F-MS-03
15

LEAD
F-PT-03
2120

2120

130
340

CONSULTANT
CL
3970 R8 0 1215

D
80

3895
R1
15

95

830
R2

R495 0
R38

1500 SUB -
340 580 70 CONSULTANTS
100
50

100 550 840


10
0
10

190
50

2500 1470
0
490

490

100 FCH 3000

1025 1085
EQ 350

1125 1085
360

875
F-ST-53
2100

2100
710

LUSAIL HOTEL
1910

S-AC-07 S-FA-68
310
[ PK4b(i)-c & PK4b(ii)-c ]
1420

F-PT-03
700

04 SLOPE 1% SUBMISSION
50 50 50 50
STAMP ISSUED FOR CONSTRUCTION
710

730

789-12
OCTOBER 2020 PACKAGE PK4b(i)-c
EQ 350

2210 1175 220


360

2210 PACKAGE TITLE

67
Lusail Katara Hotel Towers
PK4b(i) 34th Floor Level- Themed Suite-1 Royal Duplex
180

CL
-c- MASTER BATHROOM- PLANS
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)

79 FLOORING PLAN
80 CEILING PLAN A0 02.10.2020 EH CM 1:20
Marina-hotel 001 /
LUSAIL
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.

Q17017-0100D FC T4 AI 689 17 OF 21 00
KEY PLAN:
S-AC-01 1 6 14 25 34
MECCA
S-WH-01 U
98
N
689
101 102 S-FA-05
101 689 689
789-6 S-FA-02
43

L
650 S/O

T4

600
600 D/L
1190
A
220 3000 S-AC-04

94
S-AC-02

620

620
LEGENDS & PARTICULAR NOTES:
689 WASTE BIN

BATHROOM 2
S-AC-05 S-WH-02

1240

1240
1387
S-FA-01

95 S-FA-04
689 1720 850 S/O 650 150

285
810C/O
S-AC-15
75

150

150

180
150 789-5
2305 840C/O

320 S-AC-04
96
689 11
789-10

500
S-WH-04
BATHROOM 2
97 S-FA-60
689
AP-TV-03

2430

2430
S-AC-13

650
LF-24 WASTE BIN

S-FA-55

500
S-WH-49
75
1500 S/O 880 S/O 600 789-5
1400C/O 840C/O S-AC-15

45
LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
02
150

150
150 789-10 GENERAL NOTES:
50 810C/O 900
585 1436C/O 125
21 All written dimensions shall have precedence over drawing scale. The
789-1 Engineer shall be notified of any errors or dimensions requiring correction. All
dimensions are to grid line or face of wall finish unless otherwise noted.
S-FA-68 The Contractor shall provide all necessary blocking, framing, hangers or
99 other support fixing for fixtures, equipment, cabinetwork or similar requiring
689 S-FA-07
integrated stability. Similarly, all bonding methods for fixing are
S-FA-13 the responsibility of the Contractor. All wall and ceiling linings (including

2070
2120

surface finishes, applied coatings and treatments, substrates and framing)


are to be non-combustible to meet local authority regulations or to meet the
100
S-FA-68 equivalent standards of non-combustibility of adopted regulations in force.
689 The Contractor shall provide all necessary shop fabrication drawings to the
1035

S-FA-09 Engineer for checking prior to manufacture to ensure that design integrity is

985
maintained. The Contractor is to provide finished samples of all exposed
S-FA-08
materials to the Engineer for approval prior to ordering or manufacturing. All
1800 S-FA-10
2210 construction shall comply with all current local building codes and regulations.

100
100

01 All Drawings shall be read in conjunction with the project specifications and
789-12 drawings related to all other disciplines.
150 355 280 530 280 355 150
125
585 1500

90 BUILDERS WORK & ELECTRICAL PLAN SANITARYWARE PLAN


91
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level
04
789-12 REVISION

DATE REV. APP. BY REVISION DETAILS


02.10.2020 00 JH APPROVED ISSUE

100
250

1235 1230
600

EQ EQ EQ 130 2550 130


1200

1200

1200
700

FCH 3000 FCH 3000


1390

1390
SLOPE 0.5%

D
F-ST-53
F-ST-53
600

F-PT-03 FCH 3000


250

2810
2810
PROJECT
190

190
02
789-18
4070 2345 840 885
KATARA TOWERS AT LUSAIL

D
Lusail District, Doha
CLIENT
F-MS-03
Katara Hospitality
FCH 3000 Katara Hospitality Building, Marina District,
15

F-PT-03 Lusail City, PO Box 2977 Doha, Qatar


2390

2390
130
340

LEAD
R80 CL

D
CONSULTANT
95 80
R2 R1

ROLLER BLINDS AND


15

MULLION CHANNELS
R495 0
R38

1500
340 580 70 SUB -
100
100 CONSULTANTS
10 10

4165 436 1500 330 840 885


0

1500 840
0

CL
180

190

190

190
EQ EQ

150
F-ST-53 FCH 3000

655
170 150 1510 150 310 1140 310
EQ1

F-PT-03
F-WD-15
S-FA-68
FCH 3000
LUSAIL HOTEL
2030

2030

2030
720
2090

SLOPE 1%

1780 [ PK4b(i)-c & PK4b(ii)-c ]


SUBMISSION
F-PT-03
EQ1

STAMP ISSUED FOR CONSTRUCTION


1820 1760 OCTOBER 2020 PACKAGE PK4b(i)-c

655
1760
PACKAGE TITLE
100

Lusail Katara Hotel Towers


150

04 PK4b(i) 34th Floor Level- Themed Suite-1 Royal Duplex


789-12
-c-
140

BEDROOM BATHROOM - PLANS


FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)

Marina-hotel 001 /
A0 02.10.2020 EH CM 1:20
92 FLOORING PLAN 93 CEILING PLAN
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART
LUSAIL
REV. NO.
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level
Q17017-0100D FC T4 AI 689 19 OF 21 00
KEY PLAN:
1 6 14 25 34
76 77 MECCA
789-5 789-5 U
N

04
789-22
43
04
L
789-22 11

200
789-10

F-ST-53 F-ST-53 F-PT-03


T4
F-ST-53 F-ST-53 F-ST-53
A

1450

1450
F-MT-05
F-GL-20 LEGENDS & PARTICULAR NOTES:

LF-17 S-AC-04
BOOKMATCHED BOOKMATCHED F-ST-53 BOOKMATCHED BOOKMATCHED

S-AC-15

3000
3000

3000
2785C/O

2795C/O
F-MT-05
WC
IM-G-3.05 F-GL-20 CONCEALED ACCESS
PANEL
S-FA-01

1900
1450

1450
F-GL-20
S-AC-01

1100
1050
S-FA-04 S-WH-04

850
S-FA-02 08
S-WH-02 789-10 S-FA-60

100
100

100

100
S-WH-01

60
F-ST-53 S-AC-14 F-ST-53 W.P.

W.P.

IM-G-3.05
S-AC-05
81 ELEVATION 82 ELEVATION 83 ELEVATION
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level

LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)

F-GL-20 30 77 32 76 GENERAL NOTES:


11
789-2 789-5 789-2 F-MT-15 789-5 All written dimensions shall have precedence over drawing scale. The
F-PT-01 789-10
F-MR-02 Engineer shall be notified of any errors or dimensions requiring correction. All
dimensions are to grid line or face of wall finish unless otherwise noted.
AP-TV-03 The Contractor shall provide all necessary blocking, framing, hangers or
F-FA-68 other support fixing for fixtures, equipment, cabinetwork or similar requiring
integrated stability. Similarly, all bonding methods for fixing are
the responsibility of the Contractor. All wall and ceiling linings (including

135
200
BEVELED F-PT-03 surface finishes, applied coatings and treatments, substrates and framing)
MIRROR
F-PT-03 WITH FRAME F-PT-03 are to be non-combustible to meet local authority regulations or to meet the
equivalent standards of non-combustibility of adopted regulations in force.
F-ST-53 F-ST-53 The Contractor shall provide all necessary shop fabrication drawings to the
Engineer for checking prior to manufacture to ensure that design integrity is
1450

1450
LF-17 LF-17 F-MT-05 maintained. The Contractor is to provide finished samples of all exposed

1830
materials to the Engineer for approval prior to ordering or manufacturing. All
F-MT-05 F-GL-20

1880
construction shall comply with all current local building codes and regulations.
F-GL-20 All Drawings shall be read in conjunction with the project specifications and
BOOKMATCHED BOOKMATCHED BOOKMATCHED S-AC-04 drawings related to all other disciplines.
S-AC-04

3000
3000

3000
2795C/O

ROBE HOOKS

2800 S/O
2785C/O
2800

MIRROR TV
S-AC-15 S-AC-05
IM-G-3.05

270
01

1900

1900

1900

20
135
S-FA-55 789-12

40
1450

BATHTUB AREA

1450
REVISION

270
BOOKMATCHED

230
DATE REV. APP. BY REVISION DETAILS

170
S-WH-04 02.10.2020 00 JH APPROVED ISSUE

850

370
BOOKMATCHED
S-FA-60 02
789-12

440
100

100

100
110
W.P.
F-ST-53 F-ST-53

S-AC-07

01 S-FA-55
IM-G-3.08 IM-G-3.05
789-10 S-WH-49
84 ELEVATION 85 ELEVATION 86 ELEVATION
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level

PROJECT

78 78 78 78
789-5 F-PT-03
F-MT-15 789-5 789-5 F-PT-03 789-5 KATARA TOWERS AT LUSAIL
F-MR-02 Lusail District, Doha
AP-TV-03 CLIENT
S-FA-68 S-FA-68
S-FA-68
Katara Hospitality
Katara Hospitality Building, Marina District,
F-ST-53 Lusail City, PO Box 2977 Doha, Qatar
F-PT-03 F-PT-03 F-ST-53 F-PT-03 LEAD
CONSULTANT
F-ST-53 F-ST-53 F-ST-53
1450

1450
SHOWER
BOOKMATCHED
1830

LF-17
BOOKMATCHED SUB -
CONSULTANTS
BOOKMATCHED BOOKMATCHED BOOKMATCHED
S-FA-07

800
3000

3000

3000

3000

3000
2805 S/O
2785C/O
01
WC
2800

789-12
360

MIRROR TV
SHOWER
20

S-FA-13 S-FA-09 BATHTUB AREA


WC
270

270

S-FA-08
190

S-FA-01
60

120
20

20

S-FA-68 S-FA-10
1450

1450
S-FA-05
1550
190

60
270

270

BOOKMATCHED
S-WH-01

1200
S-FA-10
1045

1010
170

170

170

1000
60

S-FA-04
900

900
02 BOOKMATCHED
LUSAIL HOTEL
370

789-12 S-WH-02
440
100

100

F-ST-53 F-ST-53 F-ST-53


[ PK4b(i)-c & PK4b(ii)-c ]
70

100

100
70

SUBMISSION
S-AC-07 STAMP ISSUED FOR CONSTRUCTION
OCTOBER 2020 PACKAGE PK4b(i)-c
04 PACKAGE TITLE
789-12
IM-G-3.05 S-FA-55 LEATHER TRAY IM-G-3.05 IM-G-3.05 S-FA-68 Lusail Katara Hotel Towers
S-WH-49
FOR TOWELS IM-G-3.05
S-WH-04 S-FA-60 S-FA-07 PK4b(i) 34th Floor Level- Themed Suite-1 Royal Duplex
87 ELEVATION 88 ELEVATION 89 ELEVATION
-c- MASTER BATHROOM - ELEVATIONS
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level (ISSUE OF REV00)

Marina-hotel 001 /
A0 02.10.2020 EH CM 1:20 LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.

Q17017-0100D FC T4 AI 689 18 OF 21 00
KEY PLAN:
1 6 14 25 34
MECCA
U
N
01 01
789 789

02 03 02 03 43
789 789 789 789 04 04
789 789 L

2390 2120
F-ST-53 F-ST-53
T4

135

135
96 96
11 11
F-MT-15 F-MT-15
789 789
A
135 2120 135 1850
EQ 11 11
(135) 789 789 LEGENDS & PARTICULAR NOTES:

70 70

LF-23 LF-23 LF-17 LF-17

1220

1880

1880
550
WALL LIGHTS TBC WALL LIGHTS TBC

F-ST-53 F-ST-53
MIRROR TV

F-MT-15 F-MT-15
AP-TV-03 AP-TV-03 AP-TV-03 AP-TV-03
F-MR-02 F-MR-02 F-MR-02 F-MR-02

MIRROR TV

02 05 02 03 02 03
789 789 789 789
S-FA-55 789 789
600 600

700 F-ST-53

135

135
S-FA-55 S-FA-55
1800
100 420 180 700 LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
F-ST-53
40

40
F-ST-53

40
GENERAL NOTES:

130
F-WH-49 RECESSED F-WH-49 F-ST-53 All written dimensions shall have precedence over drawing scale. The

270
DOWN LIGHT
230

230

230
BOOK MATCHED BOOK MATCHED 40
Engineer shall be notified of any errors or dimensions requiring correction. All

40

40
09 F-ST-53 09 F-ST-53 09 09

40
789 789 789 789 dimensions are to grid line or face of wall finish unless otherwise noted.
F-ST-53 F-ST-53 RECESSED The Contractor shall provide all necessary blocking, framing, hangers or
BOOK MATCHED BOOK MATCHED DOWN LIGHT F-ST-53
RECESSED 40 other support fixing for fixtures, equipment, cabinetwork or similar requiring
DOWN LIGHT
850

850

850

850
EQ F-ST-53 integrated stability. Similarly, all bonding methods for fixing are
370

370

370

370
RECESSED
2120 DOWN LIGHT (135)
03 06 05 06
40
05 06 350 350
of the Contractor. All wall and ceiling linings (including
789 789 789 789 789 789 surface finishes, applied coatings and treatments, substrates and framing)
F-ST-53 are to be non-combustible to meet local authority regulations or to meet the
SHELVING FOR SHELVING FOR F-ST-53 equivalent standards of non-combustibility of adopted regulations in force.

110

110

110
BOOK MATCHED LEATHER TRAYS BOOK MATCHED LEATHER TRAYS F-ST-53
F-ST-53 The Contractor shall provide all necessary shop fabrication drawings to the
10 10 100 600 100 600

100

100
F-ST-53 F-ST-53 Engineer for checking prior to manufacture to ensure that design integrity is
789 789 F-ST-53 F-ST-53 maintained. The Contractor is to provide finished samples of all exposed
10 10 materials to the Engineer for approval prior to ordering or manufacturing. All
789 789 construction shall comply with all current local building codes and regulations.
All Drawings shall be read in conjunction with the project specifications and
drawings related to all other disciplines.
01 BATHROOM VANITY FRONT VIEW 04 MASTER VANITY FRONT VIEW 07 VANITY SIDE SECTION 08 VANITY SIDE SECTION
789 SCALE 1:10 789 SCALE 1:10 789 SCALE 1:10 789 SCALE 1:10

F-ST-53 100
2

20
2
60 02.10.2020 00 JH APPROVED ISSUE
F-ST-53 20

20
07 08 07 08
LF-23 789 789 AP-TV-03 LF-23 LF-17 789 789 AP-TV-03 LF-17 F-ST-53
720 990 720 F-ST-53
EQ EQ EQ EQ 20 20 20
(135) 2120 (135) (135) 1850 (135)
PLYWOOD F-ST-53
70
96

96

MIRROR TV MIRROR TV
F-MT-15 F-MT-15
200

11 F-MR-02 11 F-MR-02
789 789
S-FA-55 S-FA-55
S-AC-15 S-AC-15
700

604

400

09 BOOK MATCHED F-ST-53 09 BOOK MATCHED F-ST-53


PLYWOOD
789 F-WH-49 789 F-WH-49
PROJECT
F-ST-53 F-ST-53
01 04
RECESSED
100

789 265 700 460 700 265 789 215 700 290 700 215 DOWN LIGHT

2390
2120 KATARA TOWERS AT LUSAIL
Lusail District, Doha
CLIENT
02 BATHROOM VANITY TOP VIEW 05 MASTER VANITY TOP VIEW
789 SCALE 1:10 789 SCALE 1:10 F-ST-53 CONCEALED Katara Hospitality
LED LIGHT STRIP
Katara Hospitality Building, Marina District,
F-MT-15 25 68 Lusail City, PO Box 2977 Doha, Qatar

2
09 VANITY EDGE DETAIL 3

789 LEAD
SCALE 1:2

22
25
CONSULTANT

F-MR-02
SHELVING FOR
LEATHER TRAYS 19
2 6 20 50 20 SUB -
F-ST-53
CONSULTANTS

50
2
PLYWOOD
07 08 07 08
789 789 789 789

F-ST-53 70

50
30
40 40 20 30
26

100
PLYWOOD PLYWOOD PLYWOOD

20
310

310
350

350

SHELVING FOR SHELVING FOR


LEATHER TRAYS LEATHER TRAYS

20
40

40

26
2
700

700

700

2
F-ST-53 F-ST-53 100 20 50
10 10
BOOK MATCHED F-ST-53 BOOK MATCHED F-ST-53
F-ST-53
F-ST-53
LUSAIL HOTEL
350

350

F-ST-53
100

[ PK4b(i)-c & PK4b(ii)-c ]


01 F-ST-53 04 F-ST-53 F-ST-53
789 789 SUBMISSION
PLYWOOD
2120
1850 STAMP ISSUED FOR CONSTRUCTION
2390 OCTOBER 2020 PACKAGE PK4b(i)-c
2120
PACKAGE TITLE
Lusail Katara Hotel Towers
03 BATHROOM VANITY PLAN SECTION 06 MASTER VANITY PLAN SECTION 10 VANITY SKIRTING DETAIL 11 MIRROR FRAME DETAIL PK4b(i) 34th Floor Level- Themed Suite-1 Royal Duplex
789 SCALE 1:10 789 SCALE 1:10 789 SCALE 1:2 789 SCALE 1:2 -c- Bathrooms Mirrors and Vanities Details
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)

Marina-hotel 001 /
A0 02.10.2020 EH CM LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.

Q17017-0100D FC T4 AI 789 10 OF 31 00

You might also like