Professional Documents
Culture Documents
GH Ijh KL
GH Ijh KL
ÿ
9ÿ
9ÿ
ÿÿ2ÿ8
ÿÿ89
9ÿ
ÿ99ÿÿ5
ÿÿ
GHIJHKL
8
ÿ99ÿ :
;<ÿ:9
ÿ
=
ÿ 9>1ÿ
3?ÿÿ9ÿ 2:=ÿ
8;;ÿ 2:=ÿ
ÿ 2:=ÿ
9
ÿ =999ÿ9ÿ@82#ABÿ
8C
ÿ 3?ÿ
ÿ89D!ÿ
9
ÿ 39ÿE;ÿ@9
ÿ9
Bÿ
E9D!ÿ 3?ÿ
Fÿ2ÿ
ÿ89D!
ÿ
$%&'%&('%'')(*+,-./0(1(23(456(57(%%ÿ 9!ÿ"#ÿ
KEY PLAN:
1 6 14 25 34
MECCA
U
N
88 89 85 101 S-FA-05 S-FA-02
689 689 689 789-6
S-AC-01
43
L
CONCEALED
650 S/O ACCESS PANEL
1170
T4
3170 200 600 1230
A
150 S-FA-01
1255
285
81 LEGENDS & PARTICULAR NOTES:
S-WH-01
620
620
689
S-WH-02
1240
S-AC-04
82 S-FA-04
689
1400 850 S/O 940 180
S-AC-02
810C/O WASTE BIN S-WH-04
76
789-5 S-AC-15
700 840
S-AC-13
WASTE BIN
580
AP-TV-03 S-AC-05
S-FA-55
83
689 600 S-WH-49
S-FA-60
2160
1000
MIRROR TV
84 LF-18
689
11
789-10
76
580
789-5
880 S/O S-AC-15
1385 840 235 1440
05
220
810C/O
789-10 LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
220 175 850 150
640
200
100
GENERAL NOTES:
220
100
S-FA-68 All written dimensions shall have precedence over drawing scale. The
S-AC-04 Engineer shall be notified of any errors or dimensions requiring correction. All
185
1125 1125
S-FA-07 dimensions are to grid line or face of wall finish unless otherwise noted.
86
689
S-FA-68 The Contractor shall provide all necessary blocking, framing, hangers or
280
2100
87
S-FA-10 S-AC-04 surface finishes, applied coatings and treatments, substrates and framing)
689
100 are to be non-combustible to meet local authority regulations or to meet the
equivalent standards of non-combustibility of adopted regulations in force.
730
280
450 S-FA-13 The Contractor shall provide all necessary shop fabrication drawings to the
1125 100 1000 S/O 300
S-FA-09 Engineer for checking prior to manufacture to ensure that design integrity is
150 185
29
77 BUILDERS WORK & ELECTRICAL PLAN 789-2
78 SANITARYWARE PLAN
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level
REVISION
04
789-12 DATE REV. APP. BY REVISION DETAILS
02.10.2020 00 JH APPROVED ISSUE
S-AC-14
D
1150
EQ EQ EQ
1200
700
1390
D
SLOPE 0.5%
600
PROJECT
F-ST-53 F-ST-53 F-PT-03
250
50
2450
02 810
KATARA TOWERS AT LUSAIL
190
789-18
Lusail District, Doha
3623
3970
430
CLIENT
Katara Hospitality
1060
LEAD
F-PT-03
2120
2120
130
340
CONSULTANT
CL
3970 R8 0 1215
D
80
3895
R1
15
95
830
R2
R495 0
R38
1500 SUB -
340 580 70 CONSULTANTS
100
50
190
50
2500 1470
0
490
490
1025 1085
EQ 350
1125 1085
360
875
F-ST-53
2100
2100
710
LUSAIL HOTEL
1910
S-AC-07 S-FA-68
310
[ PK4b(i)-c & PK4b(ii)-c ]
1420
F-PT-03
700
04 SLOPE 1% SUBMISSION
50 50 50 50
STAMP ISSUED FOR CONSTRUCTION
710
730
789-12
OCTOBER 2020 PACKAGE PK4b(i)-c
EQ 350
67
Lusail Katara Hotel Towers
PK4b(i) 34th Floor Level- Themed Suite-1 Royal Duplex
180
CL
-c- MASTER BATHROOM- PLANS
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)
79 FLOORING PLAN
80 CEILING PLAN A0 02.10.2020 EH CM 1:20
Marina-hotel 001 /
LUSAIL
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.
Q17017-0100D FC T4 AI 689 17 OF 21 00
KEY PLAN:
S-AC-01 1 6 14 25 34
MECCA
S-WH-01 U
98
N
689
101 102 S-FA-05
101 689 689
789-6 S-FA-02
43
L
650 S/O
T4
600
600 D/L
1190
A
220 3000 S-AC-04
94
S-AC-02
620
620
LEGENDS & PARTICULAR NOTES:
689 WASTE BIN
BATHROOM 2
S-AC-05 S-WH-02
1240
1240
1387
S-FA-01
95 S-FA-04
689 1720 850 S/O 650 150
285
810C/O
S-AC-15
75
150
150
180
150 789-5
2305 840C/O
320 S-AC-04
96
689 11
789-10
500
S-WH-04
BATHROOM 2
97 S-FA-60
689
AP-TV-03
2430
2430
S-AC-13
650
LF-24 WASTE BIN
S-FA-55
500
S-WH-49
75
1500 S/O 880 S/O 600 789-5
1400C/O 840C/O S-AC-15
45
LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
02
150
150
150 789-10 GENERAL NOTES:
50 810C/O 900
585 1436C/O 125
21 All written dimensions shall have precedence over drawing scale. The
789-1 Engineer shall be notified of any errors or dimensions requiring correction. All
dimensions are to grid line or face of wall finish unless otherwise noted.
S-FA-68 The Contractor shall provide all necessary blocking, framing, hangers or
99 other support fixing for fixtures, equipment, cabinetwork or similar requiring
689 S-FA-07
integrated stability. Similarly, all bonding methods for fixing are
S-FA-13 the responsibility of the Contractor. All wall and ceiling linings (including
2070
2120
S-FA-09 Engineer for checking prior to manufacture to ensure that design integrity is
985
maintained. The Contractor is to provide finished samples of all exposed
S-FA-08
materials to the Engineer for approval prior to ordering or manufacturing. All
1800 S-FA-10
2210 construction shall comply with all current local building codes and regulations.
100
100
01 All Drawings shall be read in conjunction with the project specifications and
789-12 drawings related to all other disciplines.
150 355 280 530 280 355 150
125
585 1500
100
250
1235 1230
600
1200
1200
700
1390
SLOPE 0.5%
D
F-ST-53
F-ST-53
600
2810
2810
PROJECT
190
190
02
789-18
4070 2345 840 885
KATARA TOWERS AT LUSAIL
D
Lusail District, Doha
CLIENT
F-MS-03
Katara Hospitality
FCH 3000 Katara Hospitality Building, Marina District,
15
2390
130
340
LEAD
R80 CL
D
CONSULTANT
95 80
R2 R1
MULLION CHANNELS
R495 0
R38
1500
340 580 70 SUB -
100
100 CONSULTANTS
10 10
1500 840
0
CL
180
190
190
190
EQ EQ
150
F-ST-53 FCH 3000
655
170 150 1510 150 310 1140 310
EQ1
F-PT-03
F-WD-15
S-FA-68
FCH 3000
LUSAIL HOTEL
2030
2030
2030
720
2090
SLOPE 1%
655
1760
PACKAGE TITLE
100
Marina-hotel 001 /
A0 02.10.2020 EH CM 1:20
92 FLOORING PLAN 93 CEILING PLAN
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART
LUSAIL
REV. NO.
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level
Q17017-0100D FC T4 AI 689 19 OF 21 00
KEY PLAN:
1 6 14 25 34
76 77 MECCA
789-5 789-5 U
N
04
789-22
43
04
L
789-22 11
200
789-10
1450
1450
F-MT-05
F-GL-20 LEGENDS & PARTICULAR NOTES:
LF-17 S-AC-04
BOOKMATCHED BOOKMATCHED F-ST-53 BOOKMATCHED BOOKMATCHED
S-AC-15
3000
3000
3000
2785C/O
2795C/O
F-MT-05
WC
IM-G-3.05 F-GL-20 CONCEALED ACCESS
PANEL
S-FA-01
1900
1450
1450
F-GL-20
S-AC-01
1100
1050
S-FA-04 S-WH-04
850
S-FA-02 08
S-WH-02 789-10 S-FA-60
100
100
100
100
S-WH-01
60
F-ST-53 S-AC-14 F-ST-53 W.P.
W.P.
IM-G-3.05
S-AC-05
81 ELEVATION 82 ELEVATION 83 ELEVATION
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level
135
200
BEVELED F-PT-03 surface finishes, applied coatings and treatments, substrates and framing)
MIRROR
F-PT-03 WITH FRAME F-PT-03 are to be non-combustible to meet local authority regulations or to meet the
equivalent standards of non-combustibility of adopted regulations in force.
F-ST-53 F-ST-53 The Contractor shall provide all necessary shop fabrication drawings to the
Engineer for checking prior to manufacture to ensure that design integrity is
1450
1450
LF-17 LF-17 F-MT-05 maintained. The Contractor is to provide finished samples of all exposed
1830
materials to the Engineer for approval prior to ordering or manufacturing. All
F-MT-05 F-GL-20
1880
construction shall comply with all current local building codes and regulations.
F-GL-20 All Drawings shall be read in conjunction with the project specifications and
BOOKMATCHED BOOKMATCHED BOOKMATCHED S-AC-04 drawings related to all other disciplines.
S-AC-04
3000
3000
3000
2795C/O
ROBE HOOKS
2800 S/O
2785C/O
2800
MIRROR TV
S-AC-15 S-AC-05
IM-G-3.05
270
01
1900
1900
1900
20
135
S-FA-55 789-12
40
1450
BATHTUB AREA
1450
REVISION
270
BOOKMATCHED
230
DATE REV. APP. BY REVISION DETAILS
170
S-WH-04 02.10.2020 00 JH APPROVED ISSUE
850
370
BOOKMATCHED
S-FA-60 02
789-12
440
100
100
100
110
W.P.
F-ST-53 F-ST-53
S-AC-07
01 S-FA-55
IM-G-3.08 IM-G-3.05
789-10 S-WH-49
84 ELEVATION 85 ELEVATION 86 ELEVATION
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level
PROJECT
78 78 78 78
789-5 F-PT-03
F-MT-15 789-5 789-5 F-PT-03 789-5 KATARA TOWERS AT LUSAIL
F-MR-02 Lusail District, Doha
AP-TV-03 CLIENT
S-FA-68 S-FA-68
S-FA-68
Katara Hospitality
Katara Hospitality Building, Marina District,
F-ST-53 Lusail City, PO Box 2977 Doha, Qatar
F-PT-03 F-PT-03 F-ST-53 F-PT-03 LEAD
CONSULTANT
F-ST-53 F-ST-53 F-ST-53
1450
1450
SHOWER
BOOKMATCHED
1830
LF-17
BOOKMATCHED SUB -
CONSULTANTS
BOOKMATCHED BOOKMATCHED BOOKMATCHED
S-FA-07
800
3000
3000
3000
3000
3000
2805 S/O
2785C/O
01
WC
2800
789-12
360
MIRROR TV
SHOWER
20
270
S-FA-08
190
S-FA-01
60
120
20
20
S-FA-68 S-FA-10
1450
1450
S-FA-05
1550
190
60
270
270
BOOKMATCHED
S-WH-01
1200
S-FA-10
1045
1010
170
170
170
1000
60
S-FA-04
900
900
02 BOOKMATCHED
LUSAIL HOTEL
370
789-12 S-WH-02
440
100
100
100
100
70
SUBMISSION
S-AC-07 STAMP ISSUED FOR CONSTRUCTION
OCTOBER 2020 PACKAGE PK4b(i)-c
04 PACKAGE TITLE
789-12
IM-G-3.05 S-FA-55 LEATHER TRAY IM-G-3.05 IM-G-3.05 S-FA-68 Lusail Katara Hotel Towers
S-WH-49
FOR TOWELS IM-G-3.05
S-WH-04 S-FA-60 S-FA-07 PK4b(i) 34th Floor Level- Themed Suite-1 Royal Duplex
87 ELEVATION 88 ELEVATION 89 ELEVATION
-c- MASTER BATHROOM - ELEVATIONS
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level 689 SCALE 1:20 34th Floor Level (ISSUE OF REV00)
Marina-hotel 001 /
A0 02.10.2020 EH CM 1:20 LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.
Q17017-0100D FC T4 AI 689 18 OF 21 00
KEY PLAN:
1 6 14 25 34
MECCA
U
N
01 01
789 789
02 03 02 03 43
789 789 789 789 04 04
789 789 L
2390 2120
F-ST-53 F-ST-53
T4
135
135
96 96
11 11
F-MT-15 F-MT-15
789 789
A
135 2120 135 1850
EQ 11 11
(135) 789 789 LEGENDS & PARTICULAR NOTES:
70 70
1220
1880
1880
550
WALL LIGHTS TBC WALL LIGHTS TBC
F-ST-53 F-ST-53
MIRROR TV
F-MT-15 F-MT-15
AP-TV-03 AP-TV-03 AP-TV-03 AP-TV-03
F-MR-02 F-MR-02 F-MR-02 F-MR-02
MIRROR TV
02 05 02 03 02 03
789 789 789 789
S-FA-55 789 789
600 600
700 F-ST-53
135
135
S-FA-55 S-FA-55
1800
100 420 180 700 LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
F-ST-53
40
40
F-ST-53
40
GENERAL NOTES:
130
F-WH-49 RECESSED F-WH-49 F-ST-53 All written dimensions shall have precedence over drawing scale. The
270
DOWN LIGHT
230
230
230
BOOK MATCHED BOOK MATCHED 40
Engineer shall be notified of any errors or dimensions requiring correction. All
40
40
09 F-ST-53 09 F-ST-53 09 09
40
789 789 789 789 dimensions are to grid line or face of wall finish unless otherwise noted.
F-ST-53 F-ST-53 RECESSED The Contractor shall provide all necessary blocking, framing, hangers or
BOOK MATCHED BOOK MATCHED DOWN LIGHT F-ST-53
RECESSED 40 other support fixing for fixtures, equipment, cabinetwork or similar requiring
DOWN LIGHT
850
850
850
850
EQ F-ST-53 integrated stability. Similarly, all bonding methods for fixing are
370
370
370
370
RECESSED
2120 DOWN LIGHT (135)
03 06 05 06
40
05 06 350 350
of the Contractor. All wall and ceiling linings (including
789 789 789 789 789 789 surface finishes, applied coatings and treatments, substrates and framing)
F-ST-53 are to be non-combustible to meet local authority regulations or to meet the
SHELVING FOR SHELVING FOR F-ST-53 equivalent standards of non-combustibility of adopted regulations in force.
110
110
110
BOOK MATCHED LEATHER TRAYS BOOK MATCHED LEATHER TRAYS F-ST-53
F-ST-53 The Contractor shall provide all necessary shop fabrication drawings to the
10 10 100 600 100 600
100
100
F-ST-53 F-ST-53 Engineer for checking prior to manufacture to ensure that design integrity is
789 789 F-ST-53 F-ST-53 maintained. The Contractor is to provide finished samples of all exposed
10 10 materials to the Engineer for approval prior to ordering or manufacturing. All
789 789 construction shall comply with all current local building codes and regulations.
All Drawings shall be read in conjunction with the project specifications and
drawings related to all other disciplines.
01 BATHROOM VANITY FRONT VIEW 04 MASTER VANITY FRONT VIEW 07 VANITY SIDE SECTION 08 VANITY SIDE SECTION
789 SCALE 1:10 789 SCALE 1:10 789 SCALE 1:10 789 SCALE 1:10
F-ST-53 100
2
20
2
60 02.10.2020 00 JH APPROVED ISSUE
F-ST-53 20
20
07 08 07 08
LF-23 789 789 AP-TV-03 LF-23 LF-17 789 789 AP-TV-03 LF-17 F-ST-53
720 990 720 F-ST-53
EQ EQ EQ EQ 20 20 20
(135) 2120 (135) (135) 1850 (135)
PLYWOOD F-ST-53
70
96
96
MIRROR TV MIRROR TV
F-MT-15 F-MT-15
200
11 F-MR-02 11 F-MR-02
789 789
S-FA-55 S-FA-55
S-AC-15 S-AC-15
700
604
400
789 265 700 460 700 265 789 215 700 290 700 215 DOWN LIGHT
2390
2120 KATARA TOWERS AT LUSAIL
Lusail District, Doha
CLIENT
02 BATHROOM VANITY TOP VIEW 05 MASTER VANITY TOP VIEW
789 SCALE 1:10 789 SCALE 1:10 F-ST-53 CONCEALED Katara Hospitality
LED LIGHT STRIP
Katara Hospitality Building, Marina District,
F-MT-15 25 68 Lusail City, PO Box 2977 Doha, Qatar
2
09 VANITY EDGE DETAIL 3
789 LEAD
SCALE 1:2
22
25
CONSULTANT
F-MR-02
SHELVING FOR
LEATHER TRAYS 19
2 6 20 50 20 SUB -
F-ST-53
CONSULTANTS
50
2
PLYWOOD
07 08 07 08
789 789 789 789
F-ST-53 70
50
30
40 40 20 30
26
100
PLYWOOD PLYWOOD PLYWOOD
20
310
310
350
350
20
40
40
26
2
700
700
700
2
F-ST-53 F-ST-53 100 20 50
10 10
BOOK MATCHED F-ST-53 BOOK MATCHED F-ST-53
F-ST-53
F-ST-53
LUSAIL HOTEL
350
350
F-ST-53
100
Marina-hotel 001 /
A0 02.10.2020 EH CM LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.
Q17017-0100D FC T4 AI 789 10 OF 31 00