Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

012131ÿ256738ÿ9

ÿ 9ÿ
9ÿ
ÿÿ ÿ19 ÿÿ89
9ÿ
 ÿ9 9ÿÿ5
ÿÿ

efghfij
,-./012ÿ4567ÿ 879:.;7ÿ<71;=6.0>27/ÿ859?>ÿ@ÿ:=2-5:ÿ@ÿ:.:ÿ0:ÿA5927ÿ@ÿ5>BC7ÿD5CD7ÿ
E.CC712?.>ÿ 4FGÿ
H7I7-7>17ÿÿ4.ÿ 879:.;7ÿJ65-KC7Lÿ@ÿMNOPQRNSÿJ9?:T.>Lÿ@ÿSPÿQSOÿSUÿQQÿJ5>BC7ÿD5CD7Lÿ@ÿ
VMOSQRQSSPWSPWÿJA5927ÿ1C?1;Lÿ
X0::C?7-ÿ Y8Eÿ@ÿZ50I7>ÿ.-ÿ5::-.D7/ÿ[\05Cÿ
]?>?9Tÿ ^5-KC7ÿ_ÿY.ÿ6521TÿA?2TÿA5CC9ÿ@ÿ:.C?9T7/ÿK-599ÿ
]7520-79ÿ ^5-KC7ÿI?>?9Tÿ
X?`79ÿ H7I7-ÿ2.ÿ/-5A?>B9ÿ
Z.152?.>ÿ a525-5ÿ^5C7ÿ<?95KC7/ÿY.?C729ÿ
<-5A?>Bÿ H7I7-ÿ2.bÿ,0KC?1ÿ2.?C729ÿ/-5A?>B9ÿ
4.27ÿ c7>7-5Cÿ1.>2-512.-ÿ2.ÿ9:71ÿ925>/5-/ÿI?22?>B9ÿ
4.27ÿ c.79ÿA?2TÿX=]G=dMÿ

 ! ! "0#$%&1'1( ÿ 9)ÿ*ÿ+ÿ#*ÿ


KEY PLAN:
1 6 14 25 34
MECCA
U
N

43
24
L
S-FA-53 S-FA-05

S-WH-41 S-AC-17
T3
M

LEGENDS & PARTICULAR NOTES:

S-FA-29

S-FA-25 S-FA-25
S-WH-10

S-AC-04
S-FA-29 S-AC-17
S-WH-10

S-AC-01
S-AC-01
S-FA-05
S-FA-53

S-AC-04 S-WH-41

S-AC-04 S-FA-58
CEILING SPOUT

S-WH-40 S-AC-04 LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)


S-FA-53 S-FA-53
GENERAL NOTES:
S-WH-41 S-WH-41 All written dimensions shall have precedence over drawing scale. The
S-FA-29 Engineer shall be notified of any errors or dimensions requiring correction. All
S-AC-01 dimensions are to grid line or face of wall finish unless otherwise noted.
The Contractor shall provide all necessary blocking, framing, hangers or
other support fixing for fixtures, equipment, cabinetwork or similar requiring
S-AC-01
S-AC-17 integrated stability. Similarly, all bonding methods for fixing are
S-WH-10
of the Contractor. All wall and ceiling linings (including
S-WH-10 S-FA-05 S-AC-17 surface finishes, applied coatings and treatments, substrates and framing)
S-WH-40 are to be non-combustible to meet local authority regulations or to meet the
S-FA-58
S-FA-25 S-FA-05 equivalent standards of non-combustibility of adopted regulations in force.
CEILING
The Contractor shall provide all necessary shop fabrication drawings to the
SPOUT S-FA-25
S-FA-29 Engineer for checking prior to manufacture to ensure that design integrity is
maintained. The Contractor is to provide finished samples of all exposed
S-FA-25 materials to the Engineer for approval prior to ordering or manufacturing. All
S-FA-05 construction shall comply with all current local building codes and regulations.
S-FA-05
S-WH-10 S-WH-10 All Drawings shall be read in conjunction with the project specifications and
S-AC-17 S-AC-17 drawings related to all other disciplines.
S-AC-01
S-AC-01

S-FA-29

S-WH-40 S-FA-53
S-FA-53
S-FA-58 S-WH-41
S-WH-41 S-AC-04
CEILING
SPOUT
02.10.2020 00 JH APPROVED ISSUE

S-AC-04

S-FA-53 S-AC-04 S-FA-53

S-WH-41 S-WH-40 S-FA-58 S-WH-41


CEILING SPOUT

25
S-AC-01 S-WH-10
S-AC-01
S-WH-10 S-AC-17 S-AC-17
S-FA-05 S-FA-05
PROJECT
S-FA-25 S-FA-25

S-FA-29 KATARA TOWERS AT LUSAIL


S-FA-29 Lusail District, Doha
K
CLIENT

Katara Hospitality
Katara Hospitality Building, Marina District,
Lusail City, PO Box 2977 Doha, Qatar
LEAD
S-WH-42 CONSULTANT

S-FA-53
SUB -
S-WH-12 CONSULTANTS

S-AC-17 S-FA-05
S-AC-22

S-AC-01

LUSAIL HOTEL
[ PK4b(i)-c & PK4b(ii)-c ]
SUBMISSION
STAMP ISSUED FOR CONSTRUCTION
OCTOBER 2020 PACKAGE PK4b(i)-c
PACKAGE TITLE
Lusail Katara Hotel Towers
SANITARY CODE PLAN
PK4b(i) Ground Floor Level
02
610-2 SCALE 1:20
-c- Katara Male Toilet Sanitary Code Plan
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)

Marina-hotel 001 /
A0 02.10.2020 EH CM LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.

Q17017-0100D FC T3 AI 610 2 OF24 00


KEY PLAN:
1 6 14 25 34
MECCA
U
03 16 15 23
N
710-1 710-1 710-1 710-1
09
2450 AFFL 2450 AFFL 710-2 2450 AFFL
02 01 5 43
710-2 710-2

5
180
L

15
8
T3

45
230

230

230
85

35
F-PT-01 F-PT-01 F-PT-01 F-PT-08

10

10

65
77 F-PT-08

90

50 55 90

50 55 90

50 90
F-PT-08 6
F-PT-08

50
A
F-PT-08

40
NOTE:

94
306

306
F-PT-01 F-PT-08 F-PT-08

20
FIXING TO F-PT-01
CEILING TO BE MIRROR MIRROR LEGENDS & PARTICULAR NOTES:

20
COORDINATED
F-PT-08

10

10
BY CONTRACTOR
F-PT-08
4

R4
KH.LF04 F-PT-08
F-MR-02 12
3 F-PT-08
3
S-FA-29 6

802 F-SP-52 F-PT-08

802
1
12 R2 METAL MESH IN
MIRROR MIRROR ACRYLIC RESIN
F-PT-08
1648
PANEL

R1
2
F-PT-08 20 130

1450

1450
13
5
02 02 22 60 70
50

1742

1750
710-1 710-1 710-1

2220
10

10
17 WALL DETAIL
5MM
MIRROR MIRROR S-WH-41 710-1
F-PT-08 SCALE 1:2 EQ 660 EQ CHANNEL

15
S-FA-53 15MM

180
SENSOR SQUARE
230 F-PT-08 FRAME

25 R12
460

460
F-PT-08 R8 F-PT-08
4MM GLASS
S-FA-53 37
F-MT-01

140
3
25 250
S-WH-41 F-PT-08

R5
225

50
ART WORK
04 45

65
375 F-PT-08 F-PT-08 F-PT-08 BY

40
60 105
710-1

945
945
150
40 OTHER
810

810
82
F-ST-02
422

F-PT-08 F-PT-08

575
575
20 15

4
F-MT-01 F-MT-01

40

40
300
180
572

572

3
2
12

50 94
LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)

50 50
17 F-PT-08

60

25
710-1 F-ST-03

45
GENERAL NOTES:
15 SKIRTING
150

150

150

150
F-ST-03 F-ST-03 F-ST-03 F-ST-03
30

125
F-ST-03 20 All written dimensions shall have precedence over drawing scale. The

50

50
SKIRTING SKIRTING SKIRTING SKIRTING SKIRTING
Engineer shall be notified of any errors or dimensions requiring correction. All
18 dimensions are to grid line or face of wall finish unless otherwise noted.
710-1
The Contractor shall provide all necessary blocking, framing, hangers or
01 MALE WC VANITY ELEVATION 03 SECTION 13 WALL PANELING ELEVATION 15 SECTION 16 SECTION 18 SKIRTING DETAIL 21 INDIRECT LIGHT WALL ELEVATION 23 SECTION other support fixing for fixtures, equipment, cabinetwork or similar requiring
710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:2 710-1 SCALE 1:10 710-1 SCALE 1:10 integrated stability. Similarly, all bonding methods for fixing are
03 the responsibility of the Contractor. All wall and ceiling linings (including
710-1 16 15 02
F-MT-05 F-ST-02 F-PT-08 710-1 710-1 710-1 surface finishes, applied coatings and treatments, substrates and framing)
F-PT-08 F-PT-08 20
05 are to be non-combustible to meet local authority regulations or to meet the
30

40

40

12
710-1

20
3 80

30
equivalent standards of non-combustibility of adopted regulations in force.
24

6 6 12
12
20

60
20

110
80

130
170 170 2

5
60 65
The Contractor shall provide all necessary shop fabrication drawings to the

8
50

70
30

45
105
F-PT-08
170

170

20 Engineer for checking prior to manufacture to ensure that design integrity is


20

19 5 620 20
6

R2
S-FA-52

45
50 388 50 100 230 100 50 710-1 100 178 660 178 100 maintained. The Contractor is to provide finished samples of all exposed

1
F-ST-02

R12
40 40 40

20
100 50 materials to the Engineer for approval prior to ordering or manufacturing. All
R1

R210 F-PT-08 F-PT-08 F-PT-08 F-PT-08 F-PT-08


10

13 construction shall comply with all current local building codes and regulations.
710-1
S-WH-41 F-ST-03 F-PT-08 F-ST-03 F-PT-08 F-PT-08 F-PT-08 01
All Drawings shall be read in conjunction with the project specifications and
50
01 F-MT-05 SKIRTING SKIRTING 710-1 drawings related to all other disciplines.
710-1 KH.LF04
10

24
14 WALL PANELING PLAN 19 PLAN DETAIL 22 INDIRECT LIGHT WALL PLAN F-SP-52 F-PT-08
24

02 MALE WC VANITY ELEVATION 25


20 6 710-1 SCALE 1:10 710-1 SCALE 1:2 710-1 SCALE 1:10 METAL MESH IN
710-1 SCALE 1:10 ACRYLIC RESIN
F-MT-05 F-MT-05 F-MT-05 PANEL
20

F-ST-02
10
30

50

F-MT-05
30

220 02 02
25

25
18

24

170 40 REVISION
6

20 6
50

710-1 710-1
20

20
20

25

2550 AFFL 2550 AFFL


50

24
50

10
710-2
10 F-MT-05 500 DATE REV. APP. BY REVISION DETAILS
71

F-PT-08 10
6

R110 FRAME AROUND 6 F-MR-02 02.10.2020 00 JH APPROVED ISSUE


20

F-ST-02 20
24
50

30
F-ST-02
25

220
50 F-MT-05
10

60 F-PT-08

195

45

45
10
10
F-ST-02 F-ST-02 13 17
05 MIRROR PLAN DETAIL 04 MIRROR SECTION DETAIL

10
F-ST-02 5 F-PT-08

95

95
50

20

20
5 F-PT-08
710-1 SCALE 1:5 F-ST-02 710-1 SCALE 1:5 10

50
20

F-MR-02

10
20

16
10

45

F-MT-05
225
S-FA-58 S-FA-58 50 205 50

CEILING SPOUT CEILING SPOUT 6 6


06 SHELF DETAIL 10

710-1 SCALE 1:5 403


F-ST-03

850
PROJECT
09
2550

2550

710-1

1285

1153
KATARA TOWERS AT LUSAIL

655
F-ST-02 F-ST-02
Lusail District, Doha
SENSOR S-FA-53
F-PT-08 CLIENT
S-WH-42 S-WH-42
200

200

08 30-1
710-1 710-1
Katara Hospitality
110

500
40

F-ST-02 F-ST-02
200 500 F-ST-02 Katara Hospitality Building, Marina District,
10
195

195

50 205 50 Lusail City, PO Box 2977 Doha, Qatar


F-ST-02
200

200

710-1 F-ST-02
F-PT-08 LEAD

16
F-ST-02

10
30 30 CONSULTANT

70 50
S-FA-29

20
400 10 5 10
F-PT-08

70
5 F-PT-08

55
860

860

10
5

5
S-WH-40 S-WH-40 15
750

750
400

550

550

635
655

SECTION - 30-1

335

335
F-PT-08 SUB -
30-2 CONSULTANTS
F-PT-08
20

710-1 25

20
100
150

F-ST-03 F-ST-03 500

150

150
SKIRTING SKIRTING
110

20

20

F-ST-03 F-ST-03
SKIRTING SKIRTING

50
R2
07 MALE DDA WC VANITY ELEVATION 09 SECTION 25 LOBBY VANITY FRONT ELEVATION 26 LOBBY VANITY SIDE ELEVATION 31 PILASTER FRONT ELEVATION 32 PILASTER SIDE ELEVATION
710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10
02
710-1 F-MR-02 F-ST-02
28 570 R230
710-1 F-MT-05 F-MT-05

S-FA-29 F-ST-02
750
00
60
F-MR-02 F-ST-02 R210
LUSAIL HOTEL
Ø5

30
F-ST-02
23

65
F-ST-03
[ PK4b(i)-c & PK4b(ii)-c ]

95
3

5
20

24
41

50
S-FA-53
6

66
40

R19
0

5
F-ST-02
6
20

6 10 14 14 10

32
500

20 50 20 SUBMISSION
710-1 ISSUED FOR CONSTRUCTION
20

DOWNSTAND S-WH-42 20 50 20

365
173
R1 STAMP
60

99 20

10
6
OCTOBER 2020 PACKAGE PK4b(i)-c

16
20

F-ST-02 R25 PACKAGE TITLE

50

50
0
6

600 26
710-1 90 90 403 30 Lusail Katara Hotel Towers
PK4b(i)
4

07 25 31 Ground Floor Level


710-1 PLAN - 30-2 710-1
710-1

MALE DDA WC VANITY ELEVATION SECTION DETAIL LOBBY VANITY PLAN MIRROR PLAN DETAIL MARBLE PLAN DETAIL PILASTER PLAN
-c- Katara Male Toilet details
08 10 27 28 29 30 VANITY DETAIL 33 FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
710-1 SCALE 1:10 710-1 SCALE 1:2 710-1 SCALE 1:10 29 710-1 SCALE 1:2 710-1 SCALE 1:2 710-1 SCALE 1:10 710-1 SCALE 1:10 (ISSUE OF REV00)

Marina-hotel 001 /
710-1 A0 02.10.2020 EH CM VARIES LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.
S-WH-40
Q17017-0100D FC T3 AI 710 1 OF 2 00

You might also like