Professional Documents
Culture Documents
Ef GHF Ij
Ef GHF Ij
ÿ
9ÿ
9ÿ
ÿÿÿ19
ÿÿ89
9ÿ
ÿ99ÿÿ5
ÿÿ
efghfij
,-./012ÿ4567ÿ 879:.;7ÿ<71;=6.0>27/ÿ859?>ÿ@ÿ:=2-5:ÿ@ÿ:.:ÿ0:ÿA5927ÿ@ÿ5>BC7ÿD5CD7ÿ
E.CC712?.>ÿ 4FGÿ
H7I7-7>17ÿÿ4.ÿ 879:.;7ÿJ65-KC7Lÿ@ÿMNOPQRNSÿJ9?:T.>Lÿ@ÿSPÿQSOÿSUÿQQÿJ5>BC7ÿD5CD7Lÿ@ÿ
VMOSQRQSSPWSPWÿJA5927ÿ1C?1;Lÿ
X0::C?7-ÿ Y8Eÿ@ÿZ50I7>ÿ.-ÿ5::-.D7/ÿ[\05Cÿ
]?>?9Tÿ ^5-KC7ÿ_ÿY.ÿ6521TÿA?2TÿA5CC9ÿ@ÿ:.C?9T7/ÿK-599ÿ
]7520-79ÿ ^5-KC7ÿI?>?9Tÿ
X?`79ÿ H7I7-ÿ2.ÿ/-5A?>B9ÿ
Z.152?.>ÿ a525-5ÿ^5C7ÿ<?95KC7/ÿY.?C729ÿ
<-5A?>Bÿ H7I7-ÿ2.bÿ,0KC?1ÿ2.?C729ÿ/-5A?>B9ÿ
4.27ÿ c7>7-5Cÿ1.>2-512.-ÿ2.ÿ9:71ÿ925>/5-/ÿI?22?>B9ÿ
4.27ÿ c.79ÿA?2TÿX=]G=dMÿ
43
24
L
S-FA-53 S-FA-05
S-WH-41 S-AC-17
T3
M
S-FA-29
S-FA-25 S-FA-25
S-WH-10
S-AC-04
S-FA-29 S-AC-17
S-WH-10
S-AC-01
S-AC-01
S-FA-05
S-FA-53
S-AC-04 S-WH-41
S-AC-04 S-FA-58
CEILING SPOUT
S-FA-29
S-WH-40 S-FA-53
S-FA-53
S-FA-58 S-WH-41
S-WH-41 S-AC-04
CEILING
SPOUT
02.10.2020 00 JH APPROVED ISSUE
S-AC-04
25
S-AC-01 S-WH-10
S-AC-01
S-WH-10 S-AC-17 S-AC-17
S-FA-05 S-FA-05
PROJECT
S-FA-25 S-FA-25
Katara Hospitality
Katara Hospitality Building, Marina District,
Lusail City, PO Box 2977 Doha, Qatar
LEAD
S-WH-42 CONSULTANT
S-FA-53
SUB -
S-WH-12 CONSULTANTS
S-AC-17 S-FA-05
S-AC-22
S-AC-01
LUSAIL HOTEL
[ PK4b(i)-c & PK4b(ii)-c ]
SUBMISSION
STAMP ISSUED FOR CONSTRUCTION
OCTOBER 2020 PACKAGE PK4b(i)-c
PACKAGE TITLE
Lusail Katara Hotel Towers
SANITARY CODE PLAN
PK4b(i) Ground Floor Level
02
610-2 SCALE 1:20
-c- Katara Male Toilet Sanitary Code Plan
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)
Marina-hotel 001 /
A0 02.10.2020 EH CM LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.
5
180
L
15
8
T3
45
230
230
230
85
35
F-PT-01 F-PT-01 F-PT-01 F-PT-08
10
10
65
77 F-PT-08
90
50 55 90
50 55 90
50 90
F-PT-08 6
F-PT-08
50
A
F-PT-08
40
NOTE:
94
306
306
F-PT-01 F-PT-08 F-PT-08
20
FIXING TO F-PT-01
CEILING TO BE MIRROR MIRROR LEGENDS & PARTICULAR NOTES:
20
COORDINATED
F-PT-08
10
10
BY CONTRACTOR
F-PT-08
4
R4
KH.LF04 F-PT-08
F-MR-02 12
3 F-PT-08
3
S-FA-29 6
802
1
12 R2 METAL MESH IN
MIRROR MIRROR ACRYLIC RESIN
F-PT-08
1648
PANEL
R1
2
F-PT-08 20 130
1450
1450
13
5
02 02 22 60 70
50
1742
1750
710-1 710-1 710-1
2220
10
10
17 WALL DETAIL
5MM
MIRROR MIRROR S-WH-41 710-1
F-PT-08 SCALE 1:2 EQ 660 EQ CHANNEL
15
S-FA-53 15MM
180
SENSOR SQUARE
230 F-PT-08 FRAME
25 R12
460
460
F-PT-08 R8 F-PT-08
4MM GLASS
S-FA-53 37
F-MT-01
140
3
25 250
S-WH-41 F-PT-08
R5
225
50
ART WORK
04 45
65
375 F-PT-08 F-PT-08 F-PT-08 BY
40
60 105
710-1
945
945
150
40 OTHER
810
810
82
F-ST-02
422
F-PT-08 F-PT-08
575
575
20 15
4
F-MT-01 F-MT-01
40
40
300
180
572
572
3
2
12
50 94
LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)
50 50
17 F-PT-08
60
25
710-1 F-ST-03
45
GENERAL NOTES:
15 SKIRTING
150
150
150
150
F-ST-03 F-ST-03 F-ST-03 F-ST-03
30
125
F-ST-03 20 All written dimensions shall have precedence over drawing scale. The
50
50
SKIRTING SKIRTING SKIRTING SKIRTING SKIRTING
Engineer shall be notified of any errors or dimensions requiring correction. All
18 dimensions are to grid line or face of wall finish unless otherwise noted.
710-1
The Contractor shall provide all necessary blocking, framing, hangers or
01 MALE WC VANITY ELEVATION 03 SECTION 13 WALL PANELING ELEVATION 15 SECTION 16 SECTION 18 SKIRTING DETAIL 21 INDIRECT LIGHT WALL ELEVATION 23 SECTION other support fixing for fixtures, equipment, cabinetwork or similar requiring
710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:2 710-1 SCALE 1:10 710-1 SCALE 1:10 integrated stability. Similarly, all bonding methods for fixing are
03 the responsibility of the Contractor. All wall and ceiling linings (including
710-1 16 15 02
F-MT-05 F-ST-02 F-PT-08 710-1 710-1 710-1 surface finishes, applied coatings and treatments, substrates and framing)
F-PT-08 F-PT-08 20
05 are to be non-combustible to meet local authority regulations or to meet the
30
40
40
12
710-1
20
3 80
30
equivalent standards of non-combustibility of adopted regulations in force.
24
6 6 12
12
20
60
20
110
80
130
170 170 2
5
60 65
The Contractor shall provide all necessary shop fabrication drawings to the
8
50
70
30
45
105
F-PT-08
170
170
19 5 620 20
6
R2
S-FA-52
45
50 388 50 100 230 100 50 710-1 100 178 660 178 100 maintained. The Contractor is to provide finished samples of all exposed
1
F-ST-02
R12
40 40 40
20
100 50 materials to the Engineer for approval prior to ordering or manufacturing. All
R1
13 construction shall comply with all current local building codes and regulations.
710-1
S-WH-41 F-ST-03 F-PT-08 F-ST-03 F-PT-08 F-PT-08 F-PT-08 01
All Drawings shall be read in conjunction with the project specifications and
50
01 F-MT-05 SKIRTING SKIRTING 710-1 drawings related to all other disciplines.
710-1 KH.LF04
10
24
14 WALL PANELING PLAN 19 PLAN DETAIL 22 INDIRECT LIGHT WALL PLAN F-SP-52 F-PT-08
24
F-ST-02
10
30
50
F-MT-05
30
220 02 02
25
25
18
24
170 40 REVISION
6
20 6
50
710-1 710-1
20
20
20
25
24
50
10
710-2
10 F-MT-05 500 DATE REV. APP. BY REVISION DETAILS
71
F-PT-08 10
6
F-ST-02 20
24
50
30
F-ST-02
25
220
50 F-MT-05
10
60 F-PT-08
195
45
45
10
10
F-ST-02 F-ST-02 13 17
05 MIRROR PLAN DETAIL 04 MIRROR SECTION DETAIL
10
F-ST-02 5 F-PT-08
95
95
50
20
20
5 F-PT-08
710-1 SCALE 1:5 F-ST-02 710-1 SCALE 1:5 10
50
20
F-MR-02
10
20
16
10
45
F-MT-05
225
S-FA-58 S-FA-58 50 205 50
850
PROJECT
09
2550
2550
710-1
1285
1153
KATARA TOWERS AT LUSAIL
655
F-ST-02 F-ST-02
Lusail District, Doha
SENSOR S-FA-53
F-PT-08 CLIENT
S-WH-42 S-WH-42
200
200
08 30-1
710-1 710-1
Katara Hospitality
110
500
40
F-ST-02 F-ST-02
200 500 F-ST-02 Katara Hospitality Building, Marina District,
10
195
195
200
710-1 F-ST-02
F-PT-08 LEAD
16
F-ST-02
10
30 30 CONSULTANT
70 50
S-FA-29
20
400 10 5 10
F-PT-08
70
5 F-PT-08
55
860
860
10
5
5
S-WH-40 S-WH-40 15
750
750
400
550
550
635
655
SECTION - 30-1
335
335
F-PT-08 SUB -
30-2 CONSULTANTS
F-PT-08
20
710-1 25
20
100
150
150
150
SKIRTING SKIRTING
110
20
20
F-ST-03 F-ST-03
SKIRTING SKIRTING
50
R2
07 MALE DDA WC VANITY ELEVATION 09 SECTION 25 LOBBY VANITY FRONT ELEVATION 26 LOBBY VANITY SIDE ELEVATION 31 PILASTER FRONT ELEVATION 32 PILASTER SIDE ELEVATION
710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10 710-1 SCALE 1:10
02
710-1 F-MR-02 F-ST-02
28 570 R230
710-1 F-MT-05 F-MT-05
S-FA-29 F-ST-02
750
00
60
F-MR-02 F-ST-02 R210
LUSAIL HOTEL
Ø5
30
F-ST-02
23
65
F-ST-03
[ PK4b(i)-c & PK4b(ii)-c ]
95
3
5
20
24
41
50
S-FA-53
6
66
40
R19
0
5
F-ST-02
6
20
6 10 14 14 10
32
500
20 50 20 SUBMISSION
710-1 ISSUED FOR CONSTRUCTION
20
DOWNSTAND S-WH-42 20 50 20
365
173
R1 STAMP
60
99 20
10
6
OCTOBER 2020 PACKAGE PK4b(i)-c
16
20
50
50
0
6
600 26
710-1 90 90 403 30 Lusail Katara Hotel Towers
PK4b(i)
4
MALE DDA WC VANITY ELEVATION SECTION DETAIL LOBBY VANITY PLAN MIRROR PLAN DETAIL MARBLE PLAN DETAIL PILASTER PLAN
-c- Katara Male Toilet details
08 10 27 28 29 30 VANITY DETAIL 33 FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
710-1 SCALE 1:10 710-1 SCALE 1:2 710-1 SCALE 1:10 29 710-1 SCALE 1:2 710-1 SCALE 1:2 710-1 SCALE 1:10 710-1 SCALE 1:10 (ISSUE OF REV00)
Marina-hotel 001 /
710-1 A0 02.10.2020 EH CM VARIES LUSAIL
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.
S-WH-40
Q17017-0100D FC T3 AI 710 1 OF 2 00