RAB-5

Consolidated Construction Consortium Limited


Name of the Project : Extension of M.D.C at XIM University Bhubaneswar
Extension of MDC: STILT + ELEVENTH FLOORS
Statement No : XIM / ELECTRICAL/ RA BILL 07 (Consolidated RA Bill 26)

Subject : INTERNAL ELECTRICAL INSTALLATION WORKS FOR FACULTY QUARTERS Date

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
Remarks
A SCHEDULE - A- WIRING Qty. Rate Amount Qty. Amount Qty Amount Qty Amount
A-1 Wiring to light, ceiling fan, exhaust fan, call bell, & 6A On board with 1.5sqmm
FRLS PVC insulated 1100 volt grade multistranded copper conductor wire for
phase, neutral and earth continuity conductor run inside 2mm wall thick ISI
mark FRLS rigid PVC conduit pipe surface or recessed in wall/ column/
ceiling / above false ceiling / under the floor of the building including supply of
materials such as clip-in type modular switches, metallic concealed box, wire, ,
junction box etc as per the electrical layout drawing & technical specifications
complete with making good to the damages caused as required and as per
direction of Engineer-in-charge.

(a) Single Light Point (Group-C) Each 1,250.00 1,050.30 1,312,876 1,479.00 1,553,395.2 26.00 27,307.83 1,505.00 1,580,703.01
(b) Fan point (Group-C) 500.00 1,098.64 549,318.50 257.00 282,349.71 3.00 3,295.91 285,645.62
Each 260.00
(c) Exhaust Fan point (Group-C) 2.00 1,404.77 2,809.53
Each
(c) Call Bell Point (2Modular) (Group-C) Each 60.00 1,179.20 70,751.82 59.00 69,572.62 - - 59.00 69,572.62
(d) 2way Light Point (Group-C) Each 225.00 2,174.11 489,175.43 124.00 269,590.01 - - 124.00 269,590.01
(e) 6A Socket & switch on existing Switch board Each 700.00 268.87 188,208.30 867.00 233,109.42 4.00 1,075.48 871.00 234,184.90
A-2 Wiring for group controlled (looped) light point/exhaust fan point/ call bell point
(without independent switch etc.) with1.5sqmm FRLS PVC insulated 1100 volt
grade multistranded copper conductor wire for phase, neutral and earth
continuity conductor run inside 2mm wall thick ISI mark rigid Heavy Class PVC
conduit pipe surface or recessed in wall/ column/ ceiling / above false ceiling / -
under the floor of the buildinge etc. as required. as per drawing and as per
the direction of Engineer in charge

(a) Subsequent point of group control. 618.00 473,590.09 53.00 40,615.33 671 514,205.42
Each 550 766.327 421479.85
A-3 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess, including providing and
fixing 5 pin 6 A modular Universal socket outle and 6 A clip-in type modular
switches connections etc. as required. as per drawing and as per the
639.00 308,867.04 2.00 966.72 641 309,833.76
direction of Engineer in charge
Nos 1050 483.36 507528
A-4 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess, including providng and
fixing 2 nos. 5 pin 6 A modular Universal socket outle and 2nos 6 A clip-in type
modular switches, connections etc. as required. as per drawing and as per 178.00 158,632.71 - - 178 158,632.71
the direction of Engineer in charge
Nos 500 891.195 445597.5
A-5 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess including providing and
fixing 6/16A Modular Socket & 16 A modular switch, connections etc. . as
required. as per drawing and as per the direction of Engineer in charge 257.00 157,090.99 9.00 5,501.24 266 162,592.23

Nos 550 611.249 336186.95


A-6 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess, including providng and
fixing 1 no. 25 A 2modular socket, connections etc. as required. as per 153.00 105,538.64 - - 153 105,538.64
drawing and as per the direction of Engineer in charge
Nos 200 689.795 137959
A-7 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess, including providng and
fixing 1 no. 32A DP Switch with Indicator 2modue, connections etc. as 139.00 88,742.88 - - 139 88,742.88
required. as per drawing and as per the direction of Engineer in charge
Nos 200 638.438 127687.6

CCCL 1 of 51 ECS
RAB-5

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
A-8 Wiring for circuits and submain with following number & sizes of FRLS PVC Remarks
insulated 1100 volt grade multistranded copper conductor wire run inside
suitable dia,2mm wall thick ISI mark rigid Heavy Class PVC conduit pipe
surface or recessed in ceiling/ column/ walls of building including supply of all
materials such as wires, PVC. conduit, PVC. junction box & pull box etc
complete with making good to the damages caused as required and as per
direction of Engineer-in-charge.
0 0
(a) 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire( for point wiring beyond 5mtrs
long & 6A Switch Socket (Sep. board ) & 2nos 6A Switch Socket (Sep. 8369 1280992.616 125.60 19,224.84 8494.6 1,300,217.45
board ) ) Metre 6000 153.064 918384
(b) 2 X 2.5 sq. mm + 1 X 1.5 sq. mm earth wire(As per SLD)
14783 2649793.618 1,316.80 236,031.13 16099.8 2,885,824.75
Metre 8500 179.246 1523591
(c) 2X 4 sq. mm + 1X 2.5 sq. mm earth wire(BDB to AC & DB-C.S to BDB-
L(C.S) 1st Floor to 10th Floor As per SLD) 3177.1 719851.4325 843.40 191,093.36 4020.5 910,944.79
Metre 6500 226.575 1472737.5
(d) 2X 6 sq. mm + 1X 4 sq. mm earth wire(Meter board to BDB-L & DB C.S to
BDB-L As per SLD) 5,089.90 1,486,403.50 5089.9 1,486,403.50
Metre 7000 292.03 2044210
(e) 4X 6 sq. mm + 2X 4 sq. mm earth wire (Meter board to BDB-L(Stilt Floor) As
per SLD) 60.00 33,291.42 60 33,291.42
Metre 100 554.857 55485.7
(f) 4X 10 sq. mm + 2X 6 sq. mm earth wire( Meter board to BDB-P & FDB-L
(11th Floor)to BDB-L1/L2(11.F)) As per SLD ) 2,755.10 2,272,221.89 2755.1 2,272,221.89
Metre 3000 824.733 2474199
(g) 4X 16 sq. mm + 2X 10 sq. mm earth wire(FDB-P(11th floor) to
BDB-P1/P2(11.F)) As per SLD ) 100.00 125,170.10 100 125,170.10
Metre 150 1251.701 187755.15
A-9
Supply and fixing circular/ HEXAGONAL G.I. box for ceiling fan clamp, of
internal dia 140 mm, 73 mm height, top lid of 1.5 mm thick G.I. sheet with its
top surface hacked for proper bonding, top lid shall be screwed into the G.I.
378.00 123,709.95 31.00 10,145.53 409 133,855.48
box by means of 3.3 mm dia round headed screws, one lock at the corners.
Clamp shall be made of 12 mm dia M.S. bar bent to shape as per standard
drawing.
Nos 500 327.275 163637.5
A-10 Supplying and fixing PVC batten/ angle holder including
connections etc. as required, as per drawing and as per the direction of - -
Engineer in charge Nos 100 85.595 8559.5
A-11 Supplying and fixing 3 pin, 6 amp ceiling rose including
connections etc. as required, as per drawing and as per the direction of 493.00 32,269.32 493 32,269.32
Engineer in charge Nos 2000 65.455 130910
A-12 Supplying and fixing suitable size metallic concealed box with modular plate
and cover in front on surface or in recess, including providng and fixing 1 no.
Stepped type Modular Fan regulator (2 module), connections etc. as 378 253890.882 3.00 2,015.01 381 255,905.89
required. as per drawing and as per the direction of Engineer in charge
Nos 500 671.669 335834.5
Amount of SCHEDULE - A- WIRING (A) 13,904,883 8,728,717.8 4,486,628.58 13,215,346.37

B Data Point & TV POINT


Supply, delivery and laying of following sizes of 2mm wall thick ISI mark FRLS
rigid PVC conduit pipe with required accessories concealed under floor / in
wall / column / roof slab above the false ceiling of the building alongwith other
B1 accessories and 18 swg GI fish wire complete for Telephone / Data point wiring
etc as required and as per direction of Engineer-in-charge.

(i) 25mm dia (TV , DATA & Telephone) (Room to Data shaft) Metre 17000 80.75 1372750 6358.6 513456.95 - - 6358.6 513,456.95
B2 Supplying and fixing suitable size metallic concealed box with modular plate
and cover in front on surface or in recess, including providng and fixing of
following type of Modular Sockets, connections etc. as required.
0
(i) RJ 45 UTP information outlet. Nos 200 643.15 128630 6 3858.9 - - 6 3,858.90
(ii) TV outlet Socket Nos 300 371.45 111435 59 21915.55 - - 59 21,915.55
(iii) Telephone outlet Socket (RJ-11) Nos 450 402.8 181260 2 805.6 - - 2 805.60
Amount of Data Point & TV POINT (B) 1,794,075 540,037.00 - 540,037.00

CCCL 2 of 51 ECS
RAB-5

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
C SCHEDULE- C-CABLING WORK Remarks
C1 Supply, Laying & testing of following size of PVC insulated, PVC sheathed,
round/strip armoured aluminium conductor power cable of 1100 volt grade
clamped on surface of wall/ column/ existing RCC/ stone ware/ masonry cable
trench/ cable trey/ through G.I. pipe/ hume pipe as the case may be, including
cost of saddles/ clamps/ markers etc but excluding the cost of G. I. pipe/ hume
pipe compete with making good the damages caused and returning the balance
unused cables to stores as required and as per direction of Engineer-in-charge.

3 1/2 core x 95 sqmm A2XFY(Cable from MDB-P to METER BOARD


(a) P1/P2/P3/P4 / FDB-P and MDB-L to METER BOARD L1/L2/L3/L4 & MDB-P to 349.70 221,709.80 349.7 221709.8
FDB-P (11TH FLOOR) as per SLD Metre 350 634 221900
3 1/2 core x 70 sqmm A2XFY(Cable from MDB-L to DB-C.S & DB C.S to FDB-
(b)
L(11th Floor) and as per SLD
196.10 99,226.60 196.1 99226.6
Metre 120 506 60720
3 1/2 core x 25 sqmm A2XFY(Cable from DB C.S to DB-LIFT ) and as per
(c) 476.00 115,192.00 476 115192
SLD Metre 150 242 36300
C2 Supplying and making end termination with Double compression brass cable
glands and aluminum lugs for following size of PVC insulated and PVC
sheathed / XLPE aluminum cable of 1.1 KV as required.as per direction of
Engineer-in-charge
(a) 3 1/2 core x 95 sqmm A2XFY Metre 24 1420 34080 24.00 34,080.00 24 34080
(b) 3 1/2 core x 70 sqmm A2XFY Metre 6 1179 7074 8.00 9,432.00 8 9432
(c) 3 1/2 core x 25 sqmm A2XFY Metre 6 551 3306 6.00 3,306.00 6 3306
Amount of CABLE WORK (C ) 363,380 - 482,946 482,946

D SCHEDULE- D-DISTRIBUTION BOARDS


D1 Supply, delivery, installation, testing & commissioning of L.T. indoor floor/ wall
mounted type distribution boards made out of 2 mm thick CR sheet metal
(a) cubicle
MDB-P fixed on m.s. channel base, duly acid treated for derusting, primered
and painted with 2 coats of enamel paint of approved shade; dust, damp &
Complete duly factory wired as per SLD
vermin proof ; having hinged door and compartmental arrangement for each Set 1.0 384,209 384,208.50 1.00 384,209 - - 1.00 384,208.5
equipment & busbar chamber on the top of the panel running horizontally;
(b) MDB-L provision for cable/ conduit entry, earthing studs as per specification
having
mentioned below duly factory wired conforming to the relevant ISS and as per
Complete duly factory
special conditions wired as
of contract per SLD
making good the damages caused complete as Set 1.0 328,448 328,448.25 1.00 328,448 1.00 328,448.3
per the direction of Engineer-in-charge.
(c) Meter Board-P1
Complete duly factory wired as per SLD Set 1.0 206,863 206,862.50 1.00 206,863 1.00 206,862.5

(c) Meter Board-P2/P3


Complete duly factory wired as per SLD Set 2.0 206,863 413,725.00 2.00 413,725 2.00 413,725.0
(d) Meter Board-L1/L2/L3
Complete duly factory wired as per SLD Set 3.0 127,266.75 381,800.25 3.00 381,800 3.00 381,800.3

(e) DB-C.S
Complete duly factory wired as per SLD Set 1.0 190,912.95 190,912.95 1.00 190,913 1.00 190,913.0

(f) FDB-P(11th Floor)


Incomer:- 125A 3P MCCB(25kA) +NL .with adjustable thermal setting
Busbar : 4 nos. 25x5mm E.C strips
Instruments:-1 set of LED type phase indicating lamps with control fuses

ON' 'OFF' TRIP indication lamp with backup fuse in Incomer


Outgoing:
3Nos 63A 3PN MCB.'C' (1okA)
1NO 25A 3PN MCB.'C' (1okA)
Complete duly factory wired as per SLD Set 1.0 43,521.40 43,521.40 1.00 43,521.40 - - 1.00 43,521.40

(g) FDB-L(11th Floor)


Incomer:- 100A 3P MCCB(25kA) +NL .with adjustable thermal setting
Busbar : 4 nos. 25x4mm E.C strips

CCCL 3 of 51 ECS
RAB-5

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
Instruments:-1 set of LED type phase indicating lamps with control fuses Remarks

ON' 'OFF' TRIP indication lamp with backup fuse in Incomer


Outgoing:
3Nos 40A 3PN MCB.'C' (1okA)
1NO 25A 3PN MCB.'C' (1okA)
3Nos 6-32 Amp 2P MCB.'C' (1okA)
Complete duly factory wired as per SLD Set 1.0 43,780.75 43,780.75 1.00 43,780.75 - - 1.00 43,780.75

(e) DB-LIFT
Incomer: 63A 4P MCI
Bus bar: 4 nos. 20x3mm E.C strips
Outgoing: 1no 25A 4P RCCB(100mA)
1NO 32A 3PN MCB.'C' (1okA)
2 Nos 25A 2P RCCB (100mA) each followed 3 Nos 6-32 Amp 1P MCB 'C' as
per SLD'
1no 25A 2P RCCB(100mA)
Instruments: 1 set.LED type phase indicating lamps with control fuses
1 no.60/5A CT operated Digital ammeter
1 nos.0-500V Digital voltmeter
Complete duly factory wired as per SLD Set 2.0 39,242.60 78,485.20 2.00 78,485.20 - - 2.00 78,485.20

D2 Supply, delivery, installation, testing & commissioning of L.T. indoor floor wall
mounted type distribution boards of original factory made enclosures of the
same brand as per MCB conforming to the relevant ISS and as per special
conditions of contract, making good the damages caused complete as per the
direction of Engineer-in-charge

(a) BDB-P(3BHK Room)


( (4way 7 segment TPN DB))
Incoming: 1 No 40A 4P MCI
Outgoing : 3 Nos 40A 2P RCCB (100mA) each followed 4 Nos 6-32 Amp 1P
MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 40.0 21,481.97 859,278.80

(b) BDB-L(3BHK Room)


( 12way SPN DB)
Incoming: 25A 2P RCCB (100mA)
Outgoing : 7Nos 6-32 Amp 1P MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 40.0 5,772.20 230,888.00 40.00 230,888 - - 40.00 230,888

(c) BDB-L & P (1BHK Room)


( 12way SPN DB)
Incoming: 25A 2P RCCB (100mA)
Outgoing : 6Nos 6-32 Amp 1P MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 40.0 5,614.50 224,580.00 38.00 213,351 - - 38.00 213,351

(d) BDB-L1(Stilt Floor)


( (4way 7 segment TPN DB))
Incoming: 1 No 32A 4P MCI
Outgoing : 3 Nos 25A 2P RCCB (100mA) each followed 4 Nos 6-32 Amp 1P
MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 1.0 19,069.35 19,069.35 2.00 38,139 2.00 38,138.70

(e) BDB-L 1(Stilt Floor)


( 12way SPN DB)
Incoming: 25A 2P RCCB (100mA)
Outgoing : 6Nos 6-32 Amp 1P MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 1.0 5,614.50 5,614.50 - -

(f) BDB-L1 /L2 (1F to 10th Floor)


( 8way SPN DB)

CCCL 4 of 51 ECS
RAB-5

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
Incoming: 25A 2P RCCB (100mA) Remarks
Outgoing : 4Nos 6-32 Amp 1P MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 20.0 5,029.30 100,586.00 21.00 105,615 1.00 5,029 22.00 110,645

(g) BDB-P1 / P2(11th Floor)


( (4way 7 segment TPN DB))
Incoming: 1 No 63A 4P MCI
Outgoing : 3 Nos 63A 2P RCCB (100mA) each followed 4 Nos 6-32 Amp 1P
MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 2.0 21,648.60 43,297.20 2.00 43,297.20 - - 2.00 43,297.20

(h) BDB-L1 / L2(11th Floor)


( (6way 7 segment TPN DB))
Incoming: 1 No 40A 4P MCI
Outgoing : 3 Nos 40A 2P RCCB (100mA) each followed 6 Nos 6-32 Amp 1P
MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 2.0 22,769.60 45,539.20 2.00 45,539.20 - - 2.00 45,539.20
Amount of SCHEDULE- D-DISTRIBUTION BOARDS (D) 3,600,598 1,188,686.6 1,564,916.95 2,753,603.50

E SCHEDULE -E-CABLE TRAY


1 Supply & Fixing of following size hot dip galvanised wire mesh cable tray
complete with coupling kit, support etc. Complete to be suspended from the
ceiling / along with wall /ducts as required.
600mm (W) x 54mm (H) Mtr 120 2,510.10 301,212.00 59 148095.9 156.50 392,831 215.5 540926.55
450mm (W) x 54mm (H) Mtr 500 2,304.00 1,152,000.00 16.4 37785.6 50.40 116,122 66.8 153907.2
300mm (W) x 54mm (H) Mtr 100 1,539.00 153,900.00 24 36936 42.00 64,638 66 101574
Amount of SCHEDULE- CABLE TRAY (E) 1,607,112.0 222,817.5 573,590.3 796,407.8

F SCHEDULE -F-EARTHING
1 Supply of all materials, installation & testing of Maintenance free Safe Earthing
electode ( chemical earthing) with earthing electode of 3 metre long 50mm
diameter hot dip galvanised pipe confirming IS:3043 including cost of 50kg
chemical filling compound, masonary enclosure, C I cover, labour charges for 10.0 18,298.00 170,000.00 20 365960 - - 20 365960
excavation of pit in all kinds of soil complete as required. As per direction of
Engineer-in-charge
Nos
2 Supply of material & laying under ground / floor / wall including making end
termination and testing of following sizes of G.I. / Cu earthing conductor for loop
earthing of equipments, switch boards & panels as required complete as per
direction of Engineer-in-charge.
(a) 40 x 5 mm G.I flat Metre 400.0 303.00 130,000.00 369.3 111897.9 210.00 63,630 579.3 175527.9
(b) 25 x 5 mm G.I flat Metre 300.0 186.00 54,000.00 360 66960 - - 360 66960
(c) 25 x 5 mm Cu. flat Metre 200.0 1,413.00 240,000.00 15.6 22042.8 94.00 132,822 109.6 154864.8
3 Supply of material & laying under ground/ floor/ wall including making end
termination and testing of following size of Cu/G.I. wire for loop earthing of
equipments, switch boards & panels as required comlete as per direction of
Engineer-in-charge.
(a) 8 swg G.I wire Metre 200.0 26.00 5,000.00 0 65.20 1,695 65.2 1695.2
(b) 8SWG HDBC wire Metre 300.0 147.00 37,500.00 0 - - 0

F1 LIGHTNING PROTECTION
1 Supply, delivery, installation, testing and commissioning of Early Streamer
Emission (ESE) system of Lightning protection Airterminal compling with NFC -
17-102 standards ( RP= 45mtrs.Level I @ 5mtr Height) including air terminal, - - 1 110100
complete with G.I mounting mast & foundation etc as required and as per
direction of Engineer-in-charge
No 1.0 110,100.00 150,000.00 1 110100
i Lighting Strike Counter set 1.0 25,870.00 30,000.00 1 25870 - - 1 25870
ii Supply of 70sq.mm cross section downconductor of single core flexible Copper
cable made of min.990Nos copper strands of 3mm dia and having PVC
insulation of min. 3mm thickness and overall dia of 16mm. It should be fixed
using SS/GI saddles & fixtures every 0.5mtr.
a Single core flexible Cu. Cable 70Sq.mm with SS saddles. mtr 100.0 1,232.00 65,000.00 80 98560 - - 80 98560

CCCL 5 of 51 ECS
RAB-5

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
2 Supplying and fixing of lightning conductor finial, made of 25 mm dia 1000 mm Remarks
long, G.I. tube, having single prong at top, with 85 mm dia 6 mm thick G.I. base
plate including holes etc. complete as required and as per the direction of - - 10 26910
Engineer in charge.
Each 10.0 2,691.00 15,000.00 10 26910
3 Supplying and fixing 25 mm X 5 mm G.I. strip on surface for roof conductor &
down Conductor etc. as required and as per the direction of Engineer in charge. - - 730 168630
Metre 770.0 231.00 138,600.00 730 168630
4 Supplying and laying G.I. Strip 40 mm X 5 mm from earth electrode directly in
ground for ground conductor as required and as per the direction of Engineer - - 258.1 98336.1
in charge Metre 200.0 381.00 65,000.00 258.1 98336.1
5 EARTHING
Supply of all materials, installation & testing of Maintenance free Safe Earthing
electode ( chemical earthing) with earthing electode of 3 metre long 50mm
diameter hot dip galvanised pipe confirming IS:3043 including cost of 50kg
chemical filling compound, masonary enclosure, C I cover, labour charges for - - 11 201278
excavation of pit in all kinds of soil complete as required. As per direction of
Engineer-in-charge
Set 11.0 18,298.00 187,000.00 11 201278

Amount of SCHEDULE- EARTING & LIGHTNING PROTECTION (F) 1,287,100 1,296,545 198,147 1,494,692.0

G SAFETY EQUIPMENTS FOR ELECTRICAL ROOM

CCCL 6 of 51 ECS
RAB-5

SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
(a) Supply and hanging of shock treatment chart duly bound/laminated. Nos. 2.0 709.00 1,418.00 2.00 1,418 2.00 1,418
Remarks
Supply and installation of 3 Nos. fire buskets on a mild steel stand complete as Set
(c) per specification and requirement of fire safety provisions. 1.00 4,336 4,336
1.0 4,336.00 4,336.00 1.00
Supply & installation of 5-Kg capacity dry CO2 type fire extinguisher complete Set
(d) as required 2.00 15,392 15,392
2.0 7,696.00 15,392.00 2.00
Supply & installation of 5-Kg capacity ABC powder type fire extinguisher Set
(e) complete as required 2.00 9,672 9,672
2.0 4,836.00 9,672.00 2.00
Supply & installation of 1100volt grade ISI marked insulating rubber mat sqmtr
(f) complete as required 60.00 89,340 60.00 89,340
60.0 1,489.00 89,340.00
First aid box With first aid kits such as( Gauze pads (at least 4 by 4 inches, Two Set
large gauze pads (at least 8 by 10 inches), A box of adhesive bandages, One
(g) gauze roller bandage, Two triangular bandages., Wound cleaning agent., 1.00 3,920 3,920
Scissors At least one blanket., and Anti-Septic Cream Complete as required
1.0 3,920.00 3,920.00 1.00
(h) Supply and installation of 440-volt danger notice plate Nos. 3.0 488.00 1,464.00 3.00 1,464 3.00 1,464
Amount of SCHEDULE- SAFETY EQUIPMENT (G) 125,542.0 - 125,542.0 125,542.0

Total Amount of (A+B+C+D+E+F+G) 22,682,689.4 11,976,804 7,431,771.4 19,408,575.0

NT EXTRA ITEM OF WORK (NT) ITEM NT item (Bill of Quantity)


1 Supply & installation 16Way SPN Double Door DB
Set 42 12,776 536,592 40 511,040 2 25,552 42 536,592
2 Supply & installation of Separate 6A Socket & 6A Switch
Set 118 865 102,070 118 102,070 - - 118 102,070
3 Supplying and fixing suitable size Separate metallic concealed box in recess
(For DATA & Telephone) Nos 241 121 29,161 241 29,161 - 241 29,161
4 Supply & installation of DB- C.S-1
Nos 1 77,198 77,198 1 77,198 1 77,198
5 Supply & installation of Fire Emergency Panel
Nos 1 277,776 277,776 1 277,776 1 277,776
6 Supply & installation of MDB- Lift
Nos 1 58,452 58,452 1 58,452 1 58,452
7 Supply & installation of AVIATION LAMP
Nos 1 7,496 7,496 1 7,496 1 7,496
8 Installation/ Fixing, on floor/ Ceiling / wall / Staircase including making end
termination and testing of following Light fixtures/ fittings as required complete
as per direction of Engineer-in-charge. (Location Typical Floors 1 to 11th Floor
and Stilt Floor)
Each
a Tube Light
Each 275 195 53,625 275 53,625 275 53,625
b Ceiling Fan
Each
323 325 104,975 323 104,975 323 104,975
c Surfacemounted circular/ square Light
Each 1,630 195 317,850 1,630 317,850 1,630 317,850
9 Installation/ Fixing, on Ceiling/ wall including making end termination and testing
of following Light fixtures/ fittings as required complete as per direction of
Engineer-in-charge. (Location: Lift Shaft) Each
a
Bulkhead Light 60 200 12,000 28 5,600 28 5,600
Each
EXTRA ITEM OF WORK (NT ITEM) 1,577,195.0 642,271.0 928,524.0 1,570,795.0

GRAND TOTAL - (A+B+C+D+E+F+G)+ NT Item 24,259,884 12,619,075 8,360,295.38 20,979,370.02


90% of the Certified Value (a ) 11,357,167 7,524,265.85 18,881,433.02

Advance Paid (b) - -

Balance Due (a-b) 7,524,265.85


BALANCE 10% of the Value 2,097,937.00
Total Bill Amount 9,622,202.85

CCCL 7 of 51 ECS
RAB-7

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Floorwise detail measurement sheet RAB- 7 Date:
SCHEDULE - A- WIRING (Summary- Quantity)

6A Socket 2 nos. 5 6/16A 32A DP circular/ 1 no.


Single Exhaust 2way & switch Subsequen 5 pin 6 A pin 6 A Modular 25 A Switch HEXAGON PVC 3 pin, 6 Stepped
Sl.No Floor Light Fan Fan Call Bell Light on existing t point of modular modular Socket & 2modular with AL G.I. box batten/ amp type
Point point point Point Point Switch group Universal Universal 16 A socket, Indicator for ceiling angle ceiling Modular
board control. socket socket modular 2modue fan clamp holder rose Fan
switch regulator

Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-6 A-7 A-9 A-10 A-11 A-12
South Block

1 1st Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

2 2nd Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

3 3rd Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

4 4th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

5 5th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

6 6th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

7 7th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

8 8th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

9 9th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

10 10th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18

11 11th Floor 32 9 7 22 27 8 7 9 14 9

Stilt Floor
12 (I&II) 26 3 4 53 2 9 31 15 3

Part- 1 Sub Total (a)


728 132 0 30 60 411 355 329 90 137 77 70 220 0 229 192

CCCL 8of 51 ECS


RAB-7

6/16A 1 no.
6A Socket Subsequen 5 pin 6 A 2 nos. 5 Modular 32A DP circular/ PVC 3 pin, 6 Stepped
Single Fan Exhaust Call Bell 2way & switch t point of modular pin 6 A Socket & 25 A Switch HEXAGON batten/ amp type
Sl.No Floor Light point Fan Point Light on existing group Universal modular 16 A 2modular with AL G.I. box angle ceiling Modular
Point point Point Switch control. socket Universal modular socket, Indicator for ceiling holder rose Fan
board socket switch 2modue fan clamp regulator

Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-6 A-7 A-9 A-10 A-11 A-12
North Block

1 1st Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

2 2nd Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

3 3rd Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

4 4th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

5 5th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

6 6th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

7 7th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

8 8th Floor 67 11 2 6 37 29 16 7 12 6 6 18 25 18

9 9th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

10 10th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18

11 11th Floor 33 9 7 26 26 9 7 9 14 9

12 Lift (1,2,3 & 4) 56 4 56

Part- 2 Sub Total (b)


777 128 0 29 64 460 316 312 88 129 76 69 189 0 264 189

Total Floor Qty


(a+b) 1505 260 0 59 124 871 671 641 178 266 153 139 409 0 493 381

CCCL 9of 51 ECS


RAB-6

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Location: First to 11th Floorwise detail measurement RAB-7
Floors sheet
SCHEDULE - A- WIRING (A1 & A2)

2 X 1.5 sq. 2 X 2.5 sq. 2X 4 sq. 2X 6 sq. 4X 6 sq. 4X 10 sq. 4X 16 sq.


Sl.No Floor mm + 1 X mm + 1 X mm + 1X mm + 1X 4 mm + 2X 4 mm + 2X 6 mm + 2X Remark
1.5 sq. mm 1.5 sq. mm 2.5 sq. mm sq. mm sq. mm sq. mm 10 sq. mm
earth wire earth wire earth wire earth wire earth wire earth wire earth wire

Sl.No (As per BOQ) A-8(a) A-8(b) A-8(c) A-8(d) A-8(e) A-8(f) A-8(g)
South Block

1 1st Floor 401.6 721.1 127.3

2 2nd Floor 401.6 721.1 127.3


3 3rd Floor 401.6 721.1 127.3
4 4th Floor 401.6 721.1 127.3
5 5th Floor 401.6 721.1 127.3
6 6th Floor 401.6 721.1 127.3
7 7th Floor 401.6 721.1 127.3
8 8th Floor 401.6 721.1 127.3
9 9th Floor 401.6 721.1 127.3
10 10th Floor 427.6 761.1 127.3
11 11th Floor 138 167.6 109 50
12 Stilt Floor 125.6 102.4 60
13 Shaft-1 1640.6 559
14 Shaft-2 684.2 372.7 719.4 719.4
Part- 1 Sub Total (a) 4305.6 8205.2 1754.7 2360 60 1278.4 50
North Block

1 1st Floor 401.6 721.1 127.3

2 2nd Floor 401.6 721.1 127.3


3 3rd Floor 401.6 721.1 127.3
4 4th Floor 401.6 721.1 127.3
5 5th Floor 401.6 721.1 127.3
6 6th Floor 401.6 721.1 127.3
7 7th Floor 401.6 721.1 127.3
8 8th Floor 401.6 630.9 111.4

9 9th Floor 401.6 721.1 127.3


10 10th Floor 427.6 761.1 127.3
11 11th Floor 147 203.6 98 50
12 Shaft-3 530.2 470.7 721.8 719.7
13 Shaft-4 2008.1 757
14 Lift (1,2,3 & 4) 440
Part- 2 Sub Total (B) 4189 7894.6 2265.8 2729.9 0 1476.7 50
Floor Qty (a+b) 8494.6 16099.8 4020.5 5089.9 60 2755.1 100

CCCL 10of 51 ECS


RAB-6

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Location: First to 11th Floorwise detail
Floors measurement sheet RAB-6

SCHEDULE- D-DISTRIBUTION BOARDS

BDB- BDB- BDB-L & P BDB-L1


P(3BHK L(3BHK (1BHK /L2 (1F to
Sl.No Floor Room) Room) Room) 10th Floor) Remark
( 16way ( 12way ( 12way ( 8way
SPN DB) SPN DB) SPN DB) SPN DB)

Sl.No (As per BOQ) A-8(a) A-8(b) A-8(c) A-8(c)


South Block

1 1st Floor 2 2 2 1

2 2nd Floor 2 2 2 1

3 3rd Floor 2 2 2 1
4 4th Floor 2 2 2 1
5 5th Floor 2 2 2 1
6 6th Floor 2 2 2 1
7 7th Floor 2 2 2 1
8 8th Floor 2 2 2 1
9 9th Floor 2 2 2 1
10 10th Floor 2 2 2 1
11 Stilt Floor 1 ELDB - 16Way
Part- 1 Sub Total (a) 21 20 20 10 1 1
North Block

1 1st Floor 2 2 2 1

2 2nd Floor 2 2 2 1

3 3rd Floor 2 2 2 1
4 4th Floor 2 2 2 1
5 5th Floor 2 2 2 1
6 6th Floor 2 2 2 1
7 7th Floor 2 2 2 1
8 8th Floor 2 2 0 2 DATA DB- 8Way
9 9th Floor 2 2 2 1
10 10th Floor 2 2 2 1

11 Stilt Floor
ELDB- 16Way
1 1 DATA DB- 8Way
Part- 2 Sub Total (B) 21 20 18 12
Floor Qty (a+b) 42 40 38 22 2

CCCL 11of 51 ECS


RAB-7

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Location: First to 11th Floors Floorwise detail measurement sheet RAB- 7 Date:
SCHEDULE - A- WIRING (A1 & A2)

6A circula
2 nos. r/ 1 no.
Socket Subse 5 pin 5 pin 6 HEXA Stepp
Circui Circuit SB.No Single & quent 6 A PVC
Exhau Call 2way switch point modul A GONA batten 3 pin, ed
Loca t Descri / PP Light Fan st Fan Bell Light on of ar modul L G.I. / 6 amp type
tion phas point ar box ceiling Modul
e/ No ption No Point point Point Point existin group Univer Univer for angle rose ar Fan
g contro sal holder
Switch l. socket sal ceiling regula
board socket fan tor
clamp

Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-9 A-10 A-11 A-12
South Block
SB-1 1 1
SB-2 2 1 1 1 2 1
Y Drawin SB-3 1 1
phase-
Ckt. 1 g room PP-1 1
TV
Point 1 1
SB-16 2 1 2
Bed SB-17 2 1 1 1 2 1
Y Room
phase- 1 & SB-18 1 1 1
Ckt. 2 SB-19 1 1 1
Toilet
PP-20 1
SB-10 2 1 2
Bed SB-11 1
Y Room
phase- SB-12 1 1 1 1
Ckt. 3 2 & SB-13 1 1 1
Toilet
PP-14 1 1 1
SB-6 1 1 1
3BHK- Bed
1 Y SB-7 1 1 1 1
phase- Room SB-8 1 1 1
3&
Ckt. 4 Toilet SB-9 2 1 2
PP-12 1 1 1
SB-14 2 1 1 2 1 4 1
SB-15 2 1 1 2 1 4 1
Y Dinnin PP-17 1
phase- g
Ckt. 5 Room Fridge
point
(PP-18)
1
SB-4 1 1 1
SB-5 2 2 2
PP-3 1
Y PP-4
phase- Kitchen PP-8 1
Ckt. 6 PP-9
PP-10
1
SB-1 1 1
SB-2 2 1 1 1 2 1
B
Drawin SB-3 1 1
phase- g room
Ckt. 1 PP-1 1
TV
Point 1 1
SB-16 2 1 2
Bed SB-17 2 1 1 1 2 1
B
phase- Room SB-18 1
Ckt. 2 1 & SB-19 1 1 1
Toilet
PP-20 1

CCCL 12of 51 ECS

3BHK-
RAB-7

circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
board
clamp

SB-10 2 1 2
Bed SB-11 1 1 1
B
phase- Room SB-12 1 1 1 1
Ckt. 3 2 & SB-13 1 1 1
Toilet
SB-14 1 1 1
3BHK- SB-6 1 1 1
2 Bed SB-7 1 1 1 1
B
Room
phase- 3 & SB-8 1 1 1
Ckt. 4 Toilet SB-9 2 1 2
PP-12 1 1 1
SB-14 2 1 1 2 1 4 1
B Dinnin SB-15 2 1 1 3 1 4 1
phase- g PP-17 1
Ckt. 5 Room
Fridge
point 1
SB-4 1 1 1
SB-5 2 2 2
PP-3 1
B PP-4
phase- Kitchen
Ckt. 6 PP-8 1
PP-9

PP-10
1
SB-1 1 1
SB-2 2 2 1 1 2 3 2
SB-3 1 1 2 2
R Drawin PP- 1&
phase- g room 2
Ckt. 1 2

TV
POINT
2 1
R Dinnin SB-4 2 2 1 1 2 3 2
phase- g PP-3 1
Ckt. 2 Room PP-4 1
SB-5 2 1 1 2 1 4 1
R PP-7 1
1BHK phase- Kitchen
lobby Fridge
Ckt. 3 point
pp-5 1
Bed SB-6 2 1 1 1 1 3 1
R 1 1 1
Room SB-7 1 1 1
phase- & SB-8
Ckt. 4 Toilet PP- 15 1
PP-16 1
PP-8 1
PP-10
R PP-12 1
phase- Kitchen PP-13
Ckt. 5 PP-14 1
Fridge
point 1

CCCL 13of 51 ECS


RAB-7

circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
board
clamp

R
phase- CorridorSB-1
Ckt. 1 4 9

COR R
RIDO phase- CorridorPP-1
R Ckt. 2
Floor ceiling
Emrge
ncy CorridorESB
Circuit 2 3 Stilt Floor
Part- 1 Sub Total (a) 67 12 0 3 6 40 28 30 9 18 0 79 18

CCCL 14of 51 ECS


RAB-7

circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
board
clamp

North Block
SB-1 1 1 ###
B 1 2 1
Drawin SB-2 2 1 1
1
phase- g room SB-3 1 ###
Ckt. 1 PP-1
TV 1 ###
1 1 ###
Point
SB-16 2 1 2 ###
B Bed SB-17 2 1 1 1 2 1
Room SB-18 1 ###
phase- 1 &
Ckt. 2 Toilet SB-19 1 1 1 ###
PP-20 1
SB-10 2 1 2
Bed SB-11 1 1 1
B Room SB-12
phase- 1 1 1 1
Ckt. 3 2 & SB-13 1 1 1
Toilet
SB-14 1 1 1
SB-6 1 1 1
3BHK- B Bed SB-7 1 1 1 1
2 phase- Room SB-8 1 1 1
3&
Ckt. 4 Toilet SB-9 2 1 2
PP-12 1 1 1
SB-14 2 1 1 2 1 4 1
B Dinnin SB-15 2 1 1 3 1 4 1
phase- g PP-17 1
Ckt. 5 Room Fridge
pp 1
SB-4 1 1 1
SB-5 2 2 2
PP-3 1
B PP-4
phase- Kitchen PP-8 1
Ckt. 6 PP-9
PP-10
1
Y SB-1 1 1
Drawi SB-2 2 1 1 1 2 1
phas ng SB-3 1 1
e- 1
Ckt. 1 room PP-1
TV 1 1
Point
SB-16 2 1 2
1 2 1
Y Bed SB-17
SB-18
2
1
1 1
1 1
phas Room SB-19 1 1
e- 1& 1
Ckt. 2 Toilet PP-20
1
SB-10 2 1 2
Y Bed SB-11 1 1 1
phas Room SB-12 1 1 1 1
e- 2&
Ckt. 3 Toilet SB-13 1 1 1
SB-14 1 1 1
SB-6 1 1 1
SB-7 1 1 1 1
3BHK Y Bed
-1 phas Room SB-8 1 1
e- 3 & SB-9 2 1 2
Ckt. 4 Toilet

CCCL 15of 51 ECS


RAB-7

circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
3BHK Y Bed board
clamp
-1 phas Room
e- 3&
Ckt. 4 Toilet
PP-12 1 1
1
SB-14 2 1 1 2 1 4 1
SB-15 2 1 1 2 1 4 1
Y
phas Dinnin PP-17
g
e- Room 1
Ckt. 5 Fridge
pp 1
SB-4 1 1 1
SB-5 2 2 2
Y PP-3 1
phas Kitche PP-4
PP-8 1
e- n PP-9
Ckt. 6
PP-10
1
SB-1 1 1
SB-2 2 2 1 1 2 3 2
R Drawi SB-3 1 1 1 2
phas PP-
e- ng 1& 2
room 2
Ckt. 1
TV
POINT
2 1
R SB-4 2 2 1 1 2 3 2
phas Dinnin
g
e- Room PP-3 1
Ckt. 2 PP-4 1
R Kitche SB-5 2 1 1 2 1 4 1
phas n PP-7 1
e- Fridge
Ckt. 3 lobby pp
1
SB-6 2 1 1 1 1 3 1
1BHK SB-7 1 1 1
R Bed SB-8 1 1 1
phas Room
e- & PP- 15
Ckt. 4 Toilet 1
PP-16
1
PP-8 1
PP-10

R PP-12
1
phas Kitche
e- n PP-13
Ckt. 5
PP-14
1

CCCL 16of 51 ECS


1BHK

RAB-7

circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
R Descri / PP Light point st Fan Bell Light on
tion phas of ar /
phas ption No Point point Point Point existin group Univer ar box angle ceiling Modul
e/ No Kitche g contro sal Univer for rose ar Fan
e- n sal ceiling holder regula
Ckt. 5 Switch l. socket socket fan tor
board
clamp

Fridge
pp 1

R
phas
e- CorridoSB-1
Ckt. 1
5 11
COR
RID
OR R
phas
e- CorridoPP-1
Ckt. 2
Emrg
ency
Circui CorridoESB-1 3 3
Part-t 2 Sub Total (B) 69 12 0 3 6 40 29 30 9 18 0 80 18
Each Floor Qty (a+b) 136 24 0 6 12 80 57 60 18 36 0 159 36

R North Block (8th Floor)


DAT phas DATA
ROO
SB-1 2 2 1 1 2 2
A e- SB-2 2 1
R1 M
Ckt.
R. phas Dinnin
g
SB-3 2 2 1 1 2 2
HALL e- Room SB-4 3 1 1 3 2 2
DATA &Ckt. 2
RESCUE HALL (a) 9 5 0 0 0 3 6 0 0 6 0 0 6
North Block (3BHK -1,
3BHK-2 & corridor) 58 6 0 2 6 34 23 16 7 12 0 62 12
North Block (8th Floor) 67 11 0 2 6 37 29 16 7 18 0 62 18

CCCL 17of 51 ECS


RAB-6

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Floorwise detail
Location: First to 11th Floors RAB-7
measurement sheet
SCHEDULE - A- WIRING (A1 & A2)
6/16A 1 no. 32A
Modular
Circuit Circuit SB.No/ PP Socket & 1 no. 25 A DP Switch
Location phase/ Description No 16 A 2modular with Remark
No socket Indicator
modular 2modue
switch

Sl.No (As per BOQ) A-5 A-6 A-7


South Block

Bed Room 1 AC Point 1 1


R phase-
Dinning Room PP-19 1

Bed Room 2 AC Point 1 1


3BHK-2 Y phase-
PP-6
Kitchen W/M 1
PP-7 1
Bed Room 3 AC Point 1 1
B phase-
Kitchen M/O PP-5
1
Bed Room 1 AC Point 1 1
R phase-
Dinning Room PP-19 1

Bed Room 2 AC Point 1 1


3BHK-1 Y phase-
PP-6 1
Kitchen W/M
PP-7 1
Bed Room 3 AC Point 1 1
B phase-
Kitchen M/O PP-5
1
R phase Bed Room AC Point 1 1

R phase- Dinning Room PP-5 1


1BHK
R phase- Kitchen M/O PP-9 1

R phase- Balcony PP-11 1

Corridor Ele. Shaft PP-1 1

Part- 1 Sub Total (a) 12 7 7 0 0

CCCL 18of 51 ECS


RAB-6

6/16A
1 no. 32A
Modular 1 no. 25 A DP
Circuit Switch
Location phase/ Circuit SB.No/ PP Socket & 2modular with Remark
No Description No 16 A socket Indicator
modular
switch 2modue

North Block

Bed Room 1 AC Point 1 1


R phase-
Dinning Room PP-19 1

Bed Room 2 AC Point 1 1


3BHK-2 Y phase- PP-6
Kitchen W/M 1
PP-7 1
Bed Room 3 AC Point 1 1
B phase-
Kitchen M/O PP-5 1
Bed Room 1 AC Point 1 1
R phase-
Dinning Room PP-19 1

Bed Room 2 AC Point 1 1


3BHK-1 Y phase-
PP-6 1
Kitchen W/M
PP-7 1
Bed Room 3 AC Point 1 1
B phase-
Kitchen M/O PP-5 1
R phase Bed Room AC Point 1 1

R phase- Dinning Room PP-5 1


1BHK
R phase- Kitchen M/O PP-9 1

R phase- Balcony PP-11 1

Corridor Ele. Shaft PP-1 1

Part- 2 Sub Total (B) 12 7 7

Each Floor Qty (a+b) 24 14 14

North Block (8TH FLOOR )


Bed Room PP-1
1

Dinning Room PP-2 1


DATA R phase
Kitchen M/O PP-3 1

Balcony PP-4 1

North Block (DATA) 4 0 0


North Block (8TH FLOOR )3BHK -2 NOS 8 6 6
Total North Block (8TH FLOOR ) 12 6 6

CCCL 19of 51 ECS


Consolidated Construction Consortium Limited
Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Location: Stilt Floor Floor Quantity
SCHEDULE - A- WIRING (A1 & A2)

6A Socket 2 nos. 5 pin 6/16A circular/


& switch Subsequen 5 pin 6 A 6A Modular HEXAGONA PVC 3 pin, 6
Location Circuit SB.No/ PP Single Light Fan point Exhaust Call Bell 2way Light on existing t point of modular Socket & batten/
Description No Point Fan point Point Point group Universal modular 16 A L G.I. box angle amp ceiling
Switch control. socket Universal modular for ceiling holder rose
board socket switch fan clamp

Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-9 A-10 A-11
STILT FLOOR
Parking SB-2 1 1 3 2
SB-3 2 1 1 2
Electrical PP-19 1
Room-2 PP-20 1
PP-21 1
SB-7 2 1 1 2
PP-16 1
Stilt
floor DATA ROOM PP-18 1
Part-I & PP 24 1
II
PP-6 1
SB-11 3 10
PARKING- 2
SB-5 3 7
Staircase - SB-6 1 1
Part-2

PARKING-II ESB-1 3 3

Staircase - SB-12 6 19
Part-1
PARKING- I ESB-2 3 4
Stilt
floor SB-13 2 1 1 2
Part-I PP-13 1
Electrical
Room- 1 PP-14 1
PP-15 1
PP-22 1
Stilt floor- Part- I 15
Stilt floor- Part- II 14
Stilt Floor Qty. 26 3 0 0 0 4 53 2 0 9 31 0 0
1 no.
Stepped
type
Modular
Fan
regulator

A-12

3
Page 22 RAB-7

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Location: 11TH Floor Floor Quantity RAB-7 Date:
SCHEDULE - A- WIRING (A1 & A2)
6/16A 1 no.
6A Socket Subsequen 5 pin 6 A 2 nos. 5 Modular circular/ PVC 3 pin, 6 Stepped
Circuit Circuit Single Exhaust Call Bell 2way Light & switch t point of modular pin 6 A Socket & HEXAGON batten/ amp type
Location phase/ Description SB.No/ PP No Light Point Fan point Fan point Point Point on existing group Universal modular 16 A AL G.I. box angle ceiling Modular
No Switch control. socket Universal modular for ceiling holder rose Fan
board socket switch fan clamp regulator

Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-9 A-10 A-11 A-12
SOUTH BLOCK
Staircas SB-1 3 2 5
Circuit-1
e& SB-2 9 8 13
parapet Circuit-2 SB-3 2 3 1 3 3 5 3
Circuit-3 PP-1 & PP-2 2
Circuit-4 PP-3 & PP-4 1 1
R- Phase
Indoor PP-5, PP-6 &
Activity Circuit-5 PP-7 2 1
Room
PP-8, PP-9 PP-
Circuit-6 10 & PP-11
3 1
SB-4 2 2 1 2 2 4 2
Indoor Circuit-7
Activity SB-5 2 2 1 2 2 4 2
Room
SB-6 2 1 2 4
SB-6A 2
Circuit-8
Room & SB-7 2 2
Toilet SB-8 2 2
Y- Phase
Circuit-9 PP-12 & PP-13
2

Indoor Circuit-10 PP-14 & PP-15


2
Activity
Room PP-16, PP-17 &
Circuit-11 PP-18 3
Circuit-12 PP-19,
PP-21
PP-20 &
2 1
SB-9 1 1 1 1 1 2 1
Circuit-13
GYM SB-10 1 1 1 2
SB-11 1 1 1 1 1 2 1
GYM Circuit-14 SB-12 2 2
&TOILET SB-13 1 1
PP-22, PP-23 &
Circuit-15 PP-24
B- Phase 2 1
GYM
PP-25, PP-26 &
Circuit-16 PP-27 2 1
PP-28, PP-29 &
Circuit-17 PP-30 3
GYM PP-31, PP-32,
Circuit-18 PP-33, PP-34 &
PP-35 3 2
SOUTH Floor Qty. 32 9 0 0 0 7 22 27 0 8 9 0 48 9

CCCL 22of 51 ECS


Page 23 RAB-7

NORTH BLOCK
Staircas SB-1 4 2 6
e& Circuit-1 SB-2 1 1 2
parapet SB-3 8 11 15
Circuit-2 SB-4 2 3 1 3 3 5 3
Circuit-3 PP-1 & PP-2 2
R- Phase
Indoor Circuit-4 PP-3 & PP-4 2
Activity PP-5, PP-6 &
Room Circuit-5 PP-7 1 2
PP-8, PP-9 PP-
Circuit-6 10 & PP-11 3 1
Indoor SB-5 2 2 1 2 2 4 2
Activity Circuit-7
Room SB-6 2 2 1 2 2 4 2
SB-7 2 1 2 4
Room & SB-7A 2
Toilet Circuit-8
SB-8 2 2
SB-9 2 2
Y- Phase
Circuit-9 PP-12 & PP-13
2

Indoor Circuit-10 PP-14 & PP-15


2
Activity
Room PP-16, PP-17 &
Circuit-11 PP-18 2 1
Circuit-12 PP-19,
PP-21
PP-20 &
2 1
SB-10 1 1 1 1 1 2 1
GYM Circuit-13
SB-11 1 1 1 2
SB-12 1 1 1 1 1 2 1
GYM
&TOILET Circuit-14 SB-13 2 2
SB-14 1 1
PP-22, PP-23 &
Circuit-15 PP-24 2 1
GYM B- Phase
PP-25, PP-26 &
Circuit-16 PP-27 2 1

PP-28, PP-29 &


Circuit-17 PP-30
3
GYM
PP-31, PP-32,
Circuit-18 PP-33, PP-34 &
PP-35 3 2
SOUTH Floor Qty. 33 9 0 0 0 7 26 26 0 9 9 0 53 9

SOUTH & NORTH Qty. 65 18 0 0 0 14 48 53 0 17 18 0 101 18

CCCL 23of 51 ECS


Page 24 RAB-7

Consolidated Construction Consortium Limited

Name of the Project: Extension of M.D.C at XIM University Bhubaneswar

Location: 11th Floor


SCHEDULE - A- WIRING (A1 & A2)
Circuit Circuit 1 no. 25 A 2modular 1 no. 32A DP Switch with
Location phase/ No Description SB.No/ PP No socket Indicator 2modue

Sl.No (As per BOQ) A-6 A-7


SOUTH BLOCK

AC Point-1 1 1

Indoor
R phase- Activity
Room AC Point-2 1 1

AC Point-3 1 1

Indoor AC Point-4 1 1
Y phase- Activity
Room
AC Point-5
1 1
AC Point-6 1 1
B phase- GYM
AC Point-7
1 1
South Total 7 7
NORTH BLOCK
AC Point-1 1 1
Indoor
R phase- Activity AC Point-2 1 1
Room
AC Point-3 1 1
Indoor AC Point-4 1 1
Y phase- Activity
Room AC Point-5 1 1
AC Point-6 1 1
B phase- GYM
AC Point-7 1 1
South Total 7 7

South & NORTH Total 14 14

CCCL 24of 51 ECS


RAB-07

SUB MAIN WIRING- Shaft (South & North Block)


Lighting Power
1BHK 2 (1x6) + 1 (1x4) Sqmm 1BHK 2 (1x6) + 1 (1x4) Sqmm
Shaft- 1 Red x6 yellow x6 Blue x6 Black x6 Green x4 Shaft- 1 Red x6 yellow x6 Blue x6 Black x6 Green x4
1 Floor 42.5 42.5 42.5 1 Floor 36.8 36.8 36.8
2 Floor 45.3 45.3 45.3 2 Floor 39.5 39.5 39.5
3 Floor 48.2 48.2 48.2 3 Floor 42.6 42.6 42.6
4 Floor 50.8 50.8 50.8 4 Floor 45.3 45.3 45.3
5 Floor 54.1 54.1 54.1 5 Floor 48.7 48.7 48.7
6 Floor 57.3 57.3 57.3 6 Floor 51.2 51.2 51.2
7 Floor 60.2 60.2 60.2 7 Floor 54.2 54.2 54.2
8 Floor 63.4 63.4 63.4 8 Floor 57.6 57.6 57.6
9 Floor 67.8 67.8 67.8 9 Floor 60.1 60.1 60.1
10 Floor 70.2 70.2 70.2 10 Floor 64.8 64.8 64.8
Total 261.6 0 298.2 559.8 559.8 Total 196.4 145.8 158.6 500.8 500.8

3BHK-1 2 (1x6) + 1 (1x4) Sqmm 3BHK-1 4 (1x10) + 2 (1x6) Sqmm


Shaft- 1 Red x6 yellow x6 Blue x6 Black x6 Green x4 Shaft- 1 Red x10 yellow x10 Blue x10 Black x10 Green 2x6
1 Floor 44.3 44.3 44.3 1 Floor 41.9 41.9 41.9 41.9 83.8
2 Floor 47.5 47.5 47.5 2 Floor 44.2 44.2 44.2 44.2 88.4
3 Floor 50.2 50.2 50.2 3 Floor 46.8 46.8 46.8 46.8 93.6
4 Floor 53.5 53.5 53.5 4 Floor 49.9 49.9 49.9 49.9 99.8
5 Floor 56.8 56.8 56.8 5 Floor 54.2 54.2 54.2 54.2 108.4
6 Floor 59.2 59.2 59.2 6 Floor 57.9 57.9 57.9 57.9 115.8
7 Floor 62.5 62.5 62.5 7 Floor 60.5 60.5 60.5 60.5 121
8 Floor 65.9 65.9 65.9 8 Floor 63.5 63.5 63.5 63.5 127
9 Floor 68.6 68.6 68.6 9 Floor 68.9 68.9 68.9 68.9 137.8
10 Floor 71.5 71.5 71.5 10 Floor 71.2 71.2 71.2 71.2 142.4
Total 374 0 206 580 580 Total 559 559 559 559 1118
Lighting Power

CCCL 25of 51 ECS


RAB-07

SUB MAIN WIRING- Shaft (South & North Block)


3BHK-2 2 (1x6) + 1 (1x4) Sqmm 3BHK-2 4 (1x10) + 2 (1x6) Sqmm
Shaft- 2 Red x6 yellow x6 Blue x6 Black x6 Green x4 Shaft- 2 Red x10 yellow x10 Blue x10 Black x10 Green 2x6
1 Floor 56.4 56.4 56.4 1 Floor 56.4 56.4 56.4 56.4 112.8
2 Floor 59.3 59.3 59.3 2 Floor 59.3 59.3 59.3 59.3 118.6
3 Floor 63.5 63.5 63.5 3 Floor 63.5 63.5 63.5 63.5 127
4 Floor 66.5 66.5 66.5 4 Floor 66.5 66.5 66.5 66.5 133
5 Floor 70.1 70.1 70.1 5 Floor 70.1 70.1 70.1 70.1 140.2
6 Floor 73.8 73.8 73.8 6 Floor 73.8 73.8 73.8 73.8 147.6
7 Floor 77.8 77.8 77.8 7 Floor 77.8 77.8 77.8 77.8 155.6
8 Floor 80.2 80.2 80.2 8 Floor 80.2 80.2 80.2 80.2 160.4
9 Floor 83.6 83.6 83.6 9 Floor 83.6 83.6 83.6 83.6 167.2
10 Floor 88.2 88.2 88.2 10 Floor 88.2 88.2 88.2 88.2 176.4
Total 252 467.4 0 719.4 719.4 Total 719.4 719.4 719.4 719.4 1438.8

Emerg. (Corridor) 2 (1x2.5) + 1 (1x1.5) Sqmm Power


Shaft- 2 Red x2.5 yellow x2.5Blue x2.5 Black x2.5 Green x1.5 3BHK-2 4 (1x10) + 2 (1x6) Sqmm
1 Floor 46.2 46.2 46.2 Shaft- 3 Red x10 yellow x10 Blue x10 Black x10 Green 2x6
2 Floor 49.4 49.4 49.4 1 Floor 92.6 92.6 92.6 92.6 185.2
3 Floor 52.6 52.6 52.6 2 Floor 94.8 94.8 94.8 94.8 189.6
4 Floor 55.8 55.8 55.8 3 Floor 99.5 99.5 99.5 99.5 199
5 Floor 59 59 59 4 Floor 51.9 51.9 51.9 51.9 103.8
6 Floor 62.2 62.2 62.2 5 Floor 55.1 55.1 55.1 55.1 110.2
7 Floor 65.4 65.4 65.4 6 Floor 58.2 58.2 58.2 58.2 116.4
8 Floor 68.6 68.6 68.6 7 Floor 62.1 62.1 62.1 62.1 124.2
9 Floor 71.8 71.8 71.8 8 Floor 64.5 64.5 64.5 64.5 129
10 Floor 75 75 75 9 Floor 68.4 68.4 68.4 68.4 136.8
11 Floors 78.2 78.2 78.2 10 Floor 72.6 72.6 72.6 72.6 145.2
Total 684.2 0 0 684.2 684.2 Total 719.7 719.7 719.7 719.7 1439.4

CCCL 26of 51 ECS


RAB-07

SUB MAIN WIRING- Shaft (South & North Block)


Normal (Corridor) 2 (1x4) + 1 (1x2.5) Sqmm 1BHK 2 (1x6) + 1 (1x4) Sqmm
Shaft- 2 Red x4 yellow x4 Blue x4 Black x4 Green x2.5 Shaft- 4 Red x6 yellow x6 Blue x6 Black x6 Green x4
1 Floor 24.6 24.6 24.6 1 Floor 83.6 83.6 83.6
2 Floor 26.8 26.8 26.8 2 Floor 86.2 86.2 86.2
3 Floor 29.6 29.6 29.6 3 Floor 88.6 88.6 88.6
4 Floor 31.5 31.5 31.5 4 Floor 42.5 42.5 42.5
5 Floor 35.2 35.2 35.2 5 Floor 46.2 46.2 46.2
6 Floor 38.4 38.4 38.4 6 Floor 48.9 48.9 48.9
7 Floor 42.1 42.1 42.1 7 Floor 52.4 52.4 52.4
8 Floor 44.1 44.1 44.1 8 Floor 55.3 55.3 55.3
9 Floor 48.3 48.3 48.3 9 Floor 59.6 59.6 59.6
10 Floor 52.1 52.1 52.1 10 Floor 63.5 63.5 63.5
Total 150.3 106.1 116.3 372.7 372.7 Total 242 192 192.8 626.8 626.8
Lighting
Emerg. (Corridor) 2 (1x2.5) + 1 (1x1.5) Sqmm 3BHK-1 4 (1x10) + 2 (1x6) Sqmm
Shaft- 3 Red x2.5 yellow x2.5Blue x2.5 Black x2.5 Green x1.5 Shaft- 4 Red x10 yellow x10 Blue x10 Black x10 Green 2x6
1 Floor 32.2 32.2 32.2 1 Floor 92.6 92.6 92.6 92.6 185.2
2 Floor 35.4 35.4 35.4 2 Floor 94.5 94.5 94.5 94.5 189
3 Floor 38.6 38.6 38.6 3 Floor 96.9 96.9 96.9 96.9 193.8
4 Floor 41.8 41.8 41.8 4 Floor 100.1 100.1 100.1 100.1 200.2
5 Floor 45 45 45 5 Floor 54.6 54.6 54.6 54.6 109.2
6 Floor 48.2 48.2 48.2 6 Floor 55.1 55.1 55.1 55.1 110.2
7 Floor 51.4 51.4 51.4 7 Floor 60.1 60.1 60.1 60.1 120.2
8 Floor 54.6 54.6 54.6 8 Floor 64.3 64.3 64.3 64.3 128.6
9 Floor 57.8 57.8 57.8 9 Floor 68.3 68.3 68.3 68.3 136.6
10 Floor 61 61 61 10 Floor 70.5 70.5 70.5 70.5 141
11 Floors 64.2 64.2 64.2 Total 757 757 757 757 1514
Total 0 530.2 0 530.2 530.2
Lighting Lighting

CCCL 27of 51 ECS


RAB-07

SUB MAIN WIRING- Shaft (South & North Block)


Normal (Corridor) 2 (1x4) + 1 (1x2.5) Sqmm 1BHK 2 (1x6) + 1 (1x4) Sqmm
Shaft- 3 Red x4 yellow x4 Blue x4 Black x4 Green x2.5 Shaft- 4 Red x6 yellow x6 Blue x6 Black x6 Green x4
1 Floor 40.5 40.5 40.5 1 Floor 84.6 84.6 84.6
2 Floor 39.6 39.6 39.6 2 Floor 86.5 86.5 86.5
3 Floor 38.5 38.5 38.5 3 Floor 88.6 88.6 88.6
4 Floor 40.1 40.1 40.1 4 Floor 91.9 91.9 91.9
5 Floor 46.8 46.8 46.8 5 Floor 46.5 46.5 46.5
6 Floor 45.2 45.2 45.2 6 Floor 48.9 48.9 48.9
7 Floor 49.9 49.9 49.9 7 Floor 52.3 52.3 52.3
8 Floor 53.2 53.2 53.2 8 Floor 55.2 55.2 55.2
9 Floor 56.4 56.4 56.4 9 Floor 57.9 57.9 57.9
10 Floor 60.5 60.5 60.5 10 Floor 62.3 62.3 62.3
Total 191 139.6 140.1 470.7 470.7 Total 0 351.6 323.1 674.7 674.7

3BHK-2 2 (1x6) + 1 (1x4) Sqmm 3BHK-1 2 (1x6) + 1 (1x4) Sqmm


Shaft- 3 Red x6 yellow x6 Blue x6 Black x6 Green x4 Shaft- 4 Red x6 yellow x6 Blue x6 Black x6 Green x4
1 Floor 94.2 94.2 94.2 1 Floor 92.4 92.4 92.4
2 Floor 96.3 96.3 96.3 2 Floor 94.6 94.6 94.6
3 Floor 98.1 98.1 98.1 3 Floor 97.6 97.6 97.6
4 Floor 52.3 52.3 52.3 4 Floor 51.3 51.3 51.3
5 Floor 54.8 54.8 54.8 5 Floor 54.2 54.2 54.2
6 Floor 58.6 58.6 58.6 6 Floor 56.8 56.8 56.8
7 Floor 61.2 61.2 61.2 7 Floor 59.9 59.9 59.9
8 Floor 65.3 65.3 65.3 8 Floor 63.2 63.2 63.2
9 Floor 68.2 68.2 68.2 9 Floor 66.5 66.5 66.5
10 Floor 72.8 72.8 72.8 10 Floor 70.1 70.1 70.1
Total 0 721.8 0 721.8 721.8 Total 422 0 284.6 706.6 706.6

CCCL 28of 51 ECS


Page 29 RAB-7

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Floorwise detail measurement sheet RAB- 6 Date:
SCHEDULE - B- Data Point & TV POINT
Telephone
25mm dia 25mm dia 25mm dia RJ 45 UTP TV outlet outlet
Floor Slab wall Shaft informatio Socket Socket (RJ-
n outlet. 11)
Sl.No (As per BOQ) B1 (I) B2 (i) B2 (ii) B2 (iii)
South Block
1St Floor 172 31.9 6 3 2
2nd Floor 168 31.9 3
3rd Floor 216 39.5 3
4th Floor 213 37.6 3
5th Floor 213 37.6 3
6th Floor 215 37.6 3
7th Floor 213 37.6 3
8th Floor 214 37.6 3
9th Floor 216 37.6 3
10th Floor 222 38.4 3
11th Floor 24 4.2
Part- 1 Sub Total (a) 2086 371.5 0 6 30 2 0
North Block
1St Floor 266 31.9 3
2nd Floor 294 39.5 3
3rd Floor 343 39.5 3
4th Floor 354 37.6 3
5th Floor 360 37.6 3
6th Floor 355 37.6 3
7th Floor 356 37.6 3
8th Floor 355 37.6 2
9th Floor 367 37.6 3
10th Floor 369 38.4 3
11th Floor 103 4.2
Part- 2 Sub Total (B)
3522 379.1 0 0 29 0

Each Floor Qty (a+b) 5608 750.6 0 6 59 2

CCCL 29of 51 ECS


Page 30 RAB-7

Point_ Wire Measurment Flat & corridor


2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
3 BHK - 1 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth
Singlewire 3BHK - 2 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
Single
point point. point. point. point. point Above 5 point. point. point. point. point. point Above 5
DWG. Rm (CKT 1) .1 2 3 4 5 total (Qty) Mtr. DWG. Rm (CKT 1) 1 2 3 4 5 total (Qty) Mtr.
SB1 3 3 1 SB1 3 3 1
SB2 6.5 4.9 6.5 17.9 3 3 SB2 6.5 4.9 6.5 17.9 3 3
SB3 5.3 5.3 1 SB3 5.3 5.3 1
Bed Rm 1 (Ckt. 2) Bed Rm 1 (Ckt. 2)
SB 16 4 7 11 2 2 SB 16 4 7 11 2 2
SB 16 21 21 1 16 21 21 1 16
SB 17 4 5 5.2 14.2 3 0.2 SB 17 4 5 5.2 14.2 3 0.2
SB 18 3 3 1 SB 18 0
SB 19 3 3 1 SB 19 3 3 1
Bed Rm 2 (Ckt. 3) Bed Rm 2 (Ckt. 3)
SB 10 5.8 9 14.8 2 4.8 SB 10 5.8 9 14.8 2 4.8
SB 10 12.9 12.9 1 7.9 SB 10 12.9 12.9 1 7.9
SB12 5.7 5.7 1 0.7 SB 11 5.7 5.7 1 0.7
PP 14 6 6 1 1 SB12 6 6 1 1
SB 13 2.6 2.6 1 SB 13 2.6 2.6 1
Bed Rm 3 (Ckt. 4) Bed Rm 3 (Ckt. 4)
SB 9 4.3 8 12.3 2 3 SB 9 4.3 8 12.3 2 3
SB 9 11.5 11.5 1 6.5 11.5 11.5 1 6.5
SB 7 5.9 5.9 1 0.9 SB 6 5.9 5.9 1 0.9
SB 8 3 3 1 SB 7 3 3 1
SB 6 3 3 1 SB 8 3 3 1
Dinning Rm (ckt 5) Dinning Rm (ckt 5)
SB 14 4.8 3.5 3.5 5.6 3.4 20.8 5 0.6 SB 14 4.8 3.5 3.5 5.6 3.4 20.8 5 0.6
SB 15 4.8 3.4 3.5 3.4 3.5 18.6 5 SB 15 4.8 3.4 3.5 3.4 3.5 18.6 5
Kitchen (Ckt. 6) Kitchen (Ckt. 6)
SB 4 3.6 3.6 1 SB 4 3.6 3.6 1
SB5 3.6 4.6 8.2 2 SB5 3.6 4.6 8.2 2
Total 3 BHK - 1 46.6 Total 3BHK - 2 46.6

CCCL 30 OF 51 ECS
Page 31 RAB-7

Point_ Wire Measurment Flat & corridor


Point wiring 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire Stilt I&II
Single Single
point point. point. point. point. point point. Sub-1 sub-2 Sub-3 Sub-4 point
.1 2 3 4 5 Above 5 1 Above 5
1BHK total (Qty) Mtr. Stilt Floor total (Qty) Mtr.
DWG. Rm (CKT 1) SB-2 3.5 3.5 1 100
SB1 3 3 1 SB-3 6.9 7.5 5.2 4.8 3.5 27.9 4
SB2 5.3 8.5 4.1 5.7 7.2 30.8 5 6.7 SB-7 0
SB3 4.3 4.7 4.4 13.4 3 SB-11 8.9 4.3 5.2 4.3 3.4 26.1 4
Dinning (Ckt. 2) SB-5 0
SB4 5.7 8.6 7.4 6 4.3 32 5 7.7 SB-6 0
Kitchen LOBBY (Ckt. 3) SB-6 0
SB5 6.2 9.7 6.1 9.4 7.4 38.8 5 13.8 ESB-1 18.8 7.6 5.2 7.8 6.3 45.7 4
Bed Rm 1 (Ckt. 4) SB-12 0
SB6 3.8 3.7 5.2 5.5 18.2 3 0.7 ESB-2 12.3 6.8 6.2 7.6 6.5 39.4 4
SB7 2.8 2.8 1 SB-13 0
SB8 3.2 3.2 1 Total 100
Total 28.9

Corridor- South_Normal

point Single
SB1 - South Sub-1 sub-2 Sub-3 Sub-4 point Above 5
.1
(Normal) total (Qty) Mtr.

Point-1 11.9 11.9 1 6.9

Point-2 17.8 4.1 7.1 29 3 14.9

Point-3 4 13.8 4.8 3.7 26.3 4 8.8

Point-4 6.9 8.4 5.9 4 5.8 31 5 7


Total 37.6
Corridor- South_Emergency

point. Single
ESB- 1- South 1 Sub-1 sub-2 Sub-3 Sub-4 point Above 5
Corridor- North_Normal (Emerg.) total (Qty) Mtr.

point Single
SB1- North Sub-1 sub-2 Sub-3 Sub-4 point Above 5
.1
(Normal) total (Qty) Mtr. Point-1 4.2 5.8 10 2 0.8
Point-1 7.4 3.7 6.7 3.3 21.1 4 4.1 Point-2 3.8 8.6 7.7 20.1 3 6.3
Point-2 5.1 7 12.1 2 2.1 Point-3
Point-3 8.3 6.3 14.6 2 4.6 Point-4
Point-4 10 7.3 2.9 6.9 27.1 4 9.2 Total 7.1
Point-5 3.8 3.2 4.4 6.8 18.2 4 1.8
Total 21.8 Corridor- North_Emergency

point. Single
ESB- 1- North Sub-1 sub-2 Sub-3 Sub-4 point Above 5
1
(Emerg.) total (Qty) Mtr.
Point-1 2.3 7 9.3 2 2
Point-2 3.5 6.7 10.2 2 1.7
Point-3 10.1 6.7 16.8 2 6.8

Point-4
Point-5
Total 10.5

CCCL 31 OF 51 ECS
Page 32 RAB-7

Power _Wire Measurment


2X 4 sq. mm + 1X 2.5 sq. mm earth wire &
2 X 2.5 sq. mm + 1 X 1.5 sq. mm earth wire
power circuit
3 BHK 1 UOM total 2x4 1x2.5 2x2.5 1x1.5
A/C Point (Red) 20.5 20.5
(PP 15) RMT
Dinn. Point no. 10.3 10.3
19 RMT

A/C Point 21.5 21.5


(yellow) (PP 13) RMT

Oven PP5 RMT 19.5 19.5

A/C Point (Blue) 13.1 13.1


(PP 21) RMT
18 18
W.M/C (PP6 RMT
23.5 23.5
DW (PP7) RMT
Total 3BHK-1 55.1 71.3
3 BHK 2
A/C Point (Red)
(PP 15) RMT 21 21

10.1 10.1
Dinn. Point no. 19 RMT

A/C Point 21.8 21.8


(yellow) (PP 13) RMT
19.3 19.3
Oven PP5 RMT

A/C Point (Blue) 13.5 13.5


(PP 21) RMT

W.M/C (PP6 RMT 18.4 18.4

DW (PP7) RMT 24.3 24.3

Total 3BHK-2 56.3 72.1


1 BHK
15.9 15.9
A/C Point PP17 RMT

16.5 16.5
oven PP 9 RMT
23 23
W.M/C PP 8 RMT
4 4
Dinn. Poi pp5 RMT
Total 1BHK 15.9 43.5
2X 4 sq. mm + 1X 2.5 sq. mm earth wire
LIFT Lighting circuit
From UOM to Circuit 2x4 1x2.5 switch on
Single Light 2way Point existing
Lift-1 Point Switch
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Lift-2
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Lift-3
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Lift-4
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Total RMT 440 56 4 56

CCCL 32of 51 ECS


RAB-6

Lighting_Main_ Wire Measurment


Lighting main circuit 2x2.5sqmm & 2x1.5sqmm Lighting main circuit 2x2.5sqmm & 2x1.5sqmm
3 BHK -1 Total 1x1.5 earth 1x1.5 earth 3 BHK -2 Total 1x1.5 earth 1x1.5 earth
DWG. Rm (CKT 1) DWG. Rm (CKT 1)
Db to SB1 18.1 18.1 Db to SB1 18.1 18.1
SB2 - SB3 10.9 10.9 SB2 - SB3 10.9 10.9
SB3- PP2 (SB) 2.8 2.8 SB3- PP2 (SB) 2.8 2.8
PP1 - SB 2 3.8 3.8 PP1 - SB 2 3.8 3.8
TV - PP2 1.5 1.5 TV - PP2 1.5 1.5
Bed Rm 1 (Ckt. 2) Bed Rm 1 (Ckt. 2)
DB- SB 16 8.9 8.9 DB- SB 16 9.2 9.2
SB 17 - SB 16 10.6 10.6 SB 17 - SB 16 11 11
SB 18 - SB 16 15.2 15.2 SB 18 - SB 16
SB 19 - SB 17 7.8 7.8 SB 19 - SB 17 8.2 8.2
PP 20 - SB17 3 3 PP 20 - SB17 3.8 3.8
Bed Rm 2 (Ckt. 3) Bed Rm 2 (Ckt. 3)
Db - SB 10 14.1 14.1 Db - SB 10 14.9 14.9
SB 11 - SB 10 5.8 5.8 SB 11 - SB 10 6 6
SB12 - SB 10 12.9 12.9 SB12 - SB 10 12.5 12.5
SB 13 - SB 10 6.2 6.2 SB 13 - SB 10 6.4 6.4
PP 14 - SB 12 3.1 3.1 PP 14 - SB 12 3.1 3.1
Bed Rm 3 (Ckt. 4) Bed Rm 3 (Ckt. 4)
DB - SB 9 17.6 17.6 DB - SB 9 18.8 18.8
SB 6 - SB 9 8.9 8.9 SB 6 - SB 9 8.5 8.5
SB 7 - SB 9 11.1 11.1 SB 7 - SB 9 10.9 10.9
SB 8 - SB 7 11.3 11.3 SB 8 - SB 7 11.2 11.2
PP 12 - SB 7 3.2 3.2 PP 12 - SB 7 3.1 3.1
Dinning Rm (ckt 5) Dinning Rm (ckt 5)
DB- SB 14 6.6 6.6 DB- SB 14 6.6 6.6
SB 15- SB-14 12.7 12.7 SB 15- SB-14 12.6 12.6
PP 17 - SB 14 4 4 PP 17 - SB 14 4 4
PP 18 - SB 14 24.1 24.1 PP 18 - SB 14 23.5 23.5
Kitchen (Ckt. 6) Kitchen (Ckt. 6)
DB- SB 4 17.2 17.2 DB- SB 4 16.9 16.9
SB5 - SB 4 10.5 10.5 SB5 - SB 4 10.3 10.3
PP 3 & PP 4 - SB 4 6.3 6.3 PP 3 & PP 4 - SB 4 6.1 6.1
PP 10 - SB 4 7.6 7.6 PP 10 - SB 4 7.7 7.7
PP 8 & PP 9 4.2 4.2 PP 8 & PP 9 4.8 4.8
Total 3BHK 1 209.2 60.8 Total 3BHK 1 195.8 61.4

1BHK Total 2x2.5sqmm & 2x1.5sqmm


DWG. Rm (CKT 1) 1x1.5 earth 1x1.5 earth Corridor 2x2.5sqmm &
DB- SB1 19.5 19.5 Normal 1x1.5 earth
SB2- SB1 1.3 1.3 SB1- South 18.2
SB-3- SB2 12.5 12.5 Socket poi. 1
PP-1- SB-2 10.6 10.6 SB1- North 18
PP-2 - SB-2 3.9 3.9 Socket poi. 1
TV POINT- PP1 8.3 8.3 Corridor 38.2
Dinning Rm (ckt 2)
SB-4- DB 8.1 8.1
PP-3-SB 4 3.2 3.2
PP-4- SB4 11.6 11.6
2 X 2.5 sq. mm + 1 X 1.5 sq. mm earth wire &
Kitchen LOBBY (Ckt. 3) 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
SB-5- DB 10.6 10.6
PP-7- DB 11.5 11.5
Stilt Floor 2x2.5sqmm & 1x1.5 earth
PP 6- DB 3.9 3.9
Bed Rm 1 (Ckt. 4) PP-19 10.2
SB-6 -DB 12.3 12.3 PP-20 12.6
SB-7- SB 6 10.9 10.9 PP-21 19.6
SB-8 - SB 6 8.8 8.8 PP-16 8.6
PP-15 - SB 6 1.7 1.7 PP-18 9.5
PP-16 - SB 6 11.1 11.1 PP 24 8.7
Kitchen (Ckt. 5) PP-6 8.5
PP-10, pp11 & PP12 24.2 24.2 PP-13 7.4
PP-13 13.8 13.8 PP-14 9.6
Kitchen (Ckt. 6) PP-15 12.4
PP 14 (Fridge) 15.8 15.8 PP-22 15.4
Total 1BHK 91 112.6 Total 122.5

CCCL 33of 51 ECS


RAB-06

11th Floor_ Wire Measurment


Point wiring power circuit
11th South Point 11th Floor (South) total 2 x4
A/C Point ( Hall)
DWG. Rm (CKTPO.1 2 3 4 5 2x1.5+1.5Sqmm 5 15.6 15.6
A/C Point ( Hall)
SB 1 3 2 25 20 8 20.3 20.3
A/C Point ( Hall)
SB 2 10 6 15 6 15 27 15 14.2 14.2
A/C Point ( Hall)
DWG. Rm (CKT 2) 19 16.2 16.2
A/C Point ( Hall)
SB 3 16 10 5 7 10 23 24 10.8 10.8
DWG. Rm (CKT 7) A/C Point (Gym) 15 20 20
SB 4 9 10 5 9 13 A/C Point (Gym) 23 27 27
SB 5 10 11 6 10 17 Sub Total 124.1 109
DWG. Rm (CKT 8)
SB 6 11 12 22 30 11th Floor (North) total 2 x4
A/C Point ( Hall)
SB 7 1.5 4.5 14 15 15
A/C Point ( Hall)
SB 8 1 4 19 21 21
A/C Point ( Hall)
DWG. Rm (CKT 13) 0 13 13.7 13.7
A/C Point ( Hall)
SB 9 10 5 5 12 16.7 16.7
A/C Point ( Hall)
SB 10 6 1 8 11 11
DWG. Rm (CKT 14) 0 A/C Point (Gym) 13 20.5 20.5
SB 11 7 5 2 A/C Point (Gym) 19 26.4 26.4
SB 12 4 5 Sub Total 124.3 98
SB 13 1 0
0
138 0 0

Point wiring
11th North Point
DWG. Rm (CKTPO.1 2 3 4 5 2x1.5+1.5Sqmm
SB 1 5 2 7 10 7
SB 2 3 0
SB 3 12 2 18 30 45
DWG. Rm (CKT 2)
SB 4 16 10 5 7 10 23
DWG. Rm (CKT 7)
SB 5 9 10 5 9 13
SB 6 10 11 6 10 17
DWG. Rm (CKT 8)
SB 7 11 12 22 30
SB 8 1.5 4.5
SB 9 1 4
DWG. Rm (CKT 13)
SB 10 10 5 5
SB 11 10 5
DWG. Rm (CKT 14)
SB 12 7 5 2
SB 13 4 5
SB 14 1
147 0 0
Lighting main circuit
Lighting main circuit 11th (North) 2x2.5 2x1.5
11th (South) 2x2.5 2x1.5 DWG. Rm (CKT 1)
DWG. Rm (CKT 1) Db to SB1 15
Db to SB1 15 SB2 17.5
SB2 17.5 SB3 17
DWG. Rm (CKT 2) DWG. Rm (CKT 2)
SB3 9 SB4 20
DWG. Rm (CKT 3) DWG. Rm (CKT 3)
PP 1 15 PP 1 19

CCCL 34of 51 ECS


RAB-06

PP 2 3.6 PP 2 7.6
DWG. Rm (CKT 4) DWG. Rm (CKT 4)
PP 3 18 PP 3 22
PP 4 8.6 PP 4 12.6
DWG. Rm (CKT 5) DWG. Rm (CKT 5)
PP 5 22 PP 5 26
PP 6 3.1 PP 6 7.2
PP 7 5 PP 7 9.1
PP 8 6.8 PP 8 10.8
DWG. Rm (CKT 6) DWG. Rm (CKT 6)
PP 9 25 PP 9 29
PP 10 1 PP 10 5
PP 11 1 PP 11 5
DWG. Rm (CKT 7) DWG. Rm (CKT 7)
SB 4 15.4 SB 5 19.4
SB 5 3.3 SB 6 7.3
DWG. Rm (CKT 8) DWG. Rm (CKT 8)
SB 6 11.7 SB 7 11.7
SB 7 17.9 SB 8 17.9
SB 8 10.8 SB 9 10.8
DWG. Rm (CKT 9) DWG. Rm (CKT 9)
PP 12 27.6 PP 12 27.6
PP 13 9.3 PP 13 9.3
DWG. Rm (CKT 10) DWG. Rm (CKT 10)
PP 14 20.3 PP 15 20.3
PP 15 5 PP 14 5
DWG. Rm (CKT 11) DWG. Rm (CKT 11)
PP 16 6.2 PP 16 6.2
PP 17 13.4 PP 17 13.4
PP 21 4.8 PP 20 4.8
DWG. Rm (CKT 12) DWG. Rm (CKT 12)
PP 19 19.7 PP 19 19.7
PP 20 3.9 PP 21 3.9
PP 18 2 PP 18 2
DWG. Rm (CKT 13) DWG. Rm (CKT 13)
SB 9 11.3 SB 10 11.3
SB 10 21.9 SB 11 21.9
DWG. Rm (CKT 14) DWG. Rm (CKT 14)
SB 11 12.8 SB 12 12.8
SB 12 12 SB 13 12
SB 13 9 SB 14 9
DWG. Rm (CKT 15) DWG. Rm (CKT 15)
PP 22 8 PP 22 8
PP 23 4.3 PP 23 4.3
PP 24 8.4 PP 24 8.4
DWG. Rm (CKT 16) DWG. Rm (CKT 16)
PP 25 13.7 PP 25 13.7
PP 26 2 PP 26 2
PP 27 3.5 PP 27 3.5
DWG. Rm (CKT 17) DWG. Rm (CKT 17)
PP 28 16.5 PP 28 16.5
PP 29 19.4 PP 29 19.4
PP 30 6.5 PP 30 6.5
PP 31 3 PP 31 3
PP 32 5 PP 32 5
DWG. Rm (CKT 18) DWG. Rm (CKT 18)
PP 33 19 PP 33 19
PP 34 5.4 PP 34 5.4
PP 35 3.1 PP 35 3.1
Total 0 167.6 339.1 Total 3BHK -2 0 203.6 383.3

CCCL 35of 51 ECS


RAB-6

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Location: First to 11th Floorwise detail
RAB-6
Floors measurement sheet

6A Switch & 6A Socket 3BHK &1BHK Kitchen (Chimney & Aquaguard Points)
NT Item-2
Supply & installation of
Sl.No Floor Separate 6A Socket & 6A Remark
Switch
Sl.No (As per BOQ) A-8(a) A-8(b) A-8(c)
South Block
1 1st Floor 6
2 2nd Floor 6
3 3rd Floor 6
4 4th Floor 6
5 5th Floor 6
6 6th Floor 6
7 7th Floor 6
8 8th Floor 6
9 9th Floor 6
10 10th Floor 6
Part- 1 Sub Total (a) 60 0 0
North Block

1 1st Floor 6

2 2nd Floor 6

3 3rd Floor 6

4 4th Floor 6

5 5th Floor 6

6 6th Floor 6

7 7th Floor 4

8 8th Floor 6

9 9th Floor 6

10 10th Floor 6

Part- 2 Sub Total (B) 58

Floor Qty (a+b) 118

CCCL 36of 51 ECS


RAB-06

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Floorwise detail measurement sheet RAB- 6 Date:
SCHEDULE - F - Earthing & Lightning Protection
No of
SL NO DESCRIPTION UNIT QTY Each Total Qty Remark
Run #
F SCHEDULE -F-EARTHING
1 Supply of all materials, installation & testing of Maintenance free Safe Earthing
electode ( chemical earthing) with earthing electode of 3 metre long 50mm
diameter hot dip galvanised pipe confirming IS:3043 including cost of 50kg
chemical filling compound, masonary enclosure, C I cover, labour charges for 20.0 20.00
excavation of pit in all kinds of soil complete as required. As per direction of
Engineer-in-charge
Nos
2 Supply of material & laying under ground / floor / wall including making end
termination and testing of following sizes of G.I. / Cu earthing conductor for
loop earthing of equipments, switch boards & panels as required complete as
per direction of Engineer-in-charge.
(a) 40 x 5 mm G.I flat Metre 579.30 Total Qty
East Side (19 pits- GBE 1 to GBE19) Looping 70.1 1 70.10
Electrical Room -1 (GBE 1 TO 4) 14.2 4 56.80
Lift-1 (GBE-5 to GBE-6) 15.8 2 31.60
Lift-2 (GBE-7 to GBE-8) 8.0 2 16.00
Lift-3 (GBE-9 to GBE-10) 7.0 2 14.00
Lift-4 (GBE-11 to GBE-12) 4.3 2 8.60
Earth pit (GBE 13 to GBE-16) to ELectrical Room -2 (External) 9.2 4 36.80
Earth pit to DATA Room (GBE 17 to GBE-18) (External) 6.5 2 13.00
Electrical Room-1 Cable trench (South Block) 18.9 4 75.60
Electrical Room-2 Cable trench (North Block) 11.7 4 46.80
Shaft-2 - South Block Earthing 54 2 108.00
Shaft-3 - North Block Earthing 51.0 2 102.00
(b) 25 x 5 mm G.I flat Metre 360
Lift-1 45.0 2.00 90.00
Lift-2 45.0 2.00 90.00
Lift-3 45.0 2.00 90.00
Lift-4 45.0 2.00 90.00
(c) 25 x 5 mm Cu. flat Metre 109.60
Earth pit to DATA Room (GBE 17 to GBE-18) (External) 7.8 2 15.60
Stilt DATA room to 8th Floor DATA Room 47.0 2 94.00

3 Supply of material & laying under ground/ floor/ wall including making end
termination and testing of following size of Cu/G.I. wire for loop earthing of
equipments, switch boards & panels as required comlete as per direction of
Engineer-in-charge.
(a) 8 swg G.I wire Metre 65.20
ELDB & BDB (South- Stilt Floor) 9.80 2.00 19.60
ELDB & BDB (North- Stilt Floor) 8.70 2.00 17.40
LDB& PDB- 11th Floor - South 6.70 2.00 13.40
LDB& PDB- 11th Floor - North 7.40 2.00 14.80
(b) 8SWG HDBC wire Metre

F1 LIGHTNING PROTECTION
1 Supply, delivery, installation, testing and commissioning of Early Streamer
Emission (ESE) system of Lightning protection Airterminal compling with NFC
- 17-102 standards ( RP= 45mtrs.Level I @ 5mtr Height) including air terminal,
complete with G.I mounting mast & foundation etc as required and as per
direction of Engineer-in-charge
No 1.0 1.00
i Lighting Strike Counter set 1.0 1.00
ii Supply of 70sq.mm cross section downconductor of single core flexible
Copper cable made of min.990Nos copper strands of 3mm dia and having
PVC insulation of min. 3mm thickness and overall dia of 16mm. It should be
fixed using SS/GI saddles & fixtures every 0.5mtr.

a Single core flexible Cu. Cable 70Sq.mm with SS saddles. mtr 80.0 1.00 80.00

CCCL 37of 51 ECS


RAB-06

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
Floorwise detail measurement sheet RAB- 6 Date:
SCHEDULE - F - Earthing & Lightning Protection
No of
SL NO DESCRIPTION UNIT QTY Each Total Qty Remark
Run #
2 Supplying and fixing of lightning conductor finial, made of 25 mm dia 1000
mm long, G.I. tube, having single prong at top, with 85 mm dia 6 mm thick G.I.
base plate including holes etc. complete as required and as per the direction of
Engineer in charge.
Each 10.0 10.00
3 Supplying and fixing 25 mm X 5 mm G.I. strip on surface for roof conductor &
down Conductor etc. as required and as per the direction of Engineer in Metre 730 Total Qty
charge. Down Conductor 45.0 9.00 405.00
Roof Conductor- South Block 175.0 1.00 175.00
Roof Conductor- North Block 150.0 1.00 150.00
4 Supplying and laying G.I. Strip 40 mm X 5 mm from earth electrode directly in
ground for ground conductor as required and as per the direction of Engineer
in charge Metre 258.10 Total Qty
East Side (4 pits) Looping (LP-1 to LP-4) Looping
60.1 1.00 60.10
LPE-1 to Earth Link
8.8 1.00 8.80
LPE-2 to Earth Link
11.3 1.00 11.30
LPE-3 to Earth Link
4.3 1.00 4.30
LPE-4 to Earth Link
5.4 1.00 5.40
North Side LP-4 to LP- 5 to LP- 6
46.0 1.00 46.00
LPE-5 to Earth Link
6.5 1.00 6.50
West Side LP -6 to LP-10
38.3 1.00 38.30
LPE-6 to Earth Link
4.6 1.00 4.60
LPE-7 to Earth Link
4.4 1.00 4.40
LPE-8 to Earth Link
6.5 1.00 6.50
LPE-9 to Earth Link
- -
LPE-10 to Earth Link
5.1 1.00 5.10
South Side LP -10 to LP- 11 to LP-1
49.2 1.00 49.20
LPE-11 to Earth Link
7.6 1.00 7.60
5 EARTHING
Supply of all materials, installation & testing of Maintenance free Safe Earthing
electode ( chemical earthing) with earthing electode of 3 metre long 50mm
diameter hot dip galvanised pipe confirming IS:3043 including cost of 50kg
chemical filling compound, masonary enclosure, C I cover, labour charges for Set 11.0 11.00
excavation of pit in all kinds of soil complete as required. As per direction of
Engineer-in-charge

CCCL 38of 51 ECS


RAB-6

Consolidated Construction Consortium Limited


Electrical Rate Analysis for Non tendered Item
M/s Elctrical Consultancy Services, Bhubaneswar
2 Modul Box (DATA & TELEPHONE) Quantity Details Floor vise
S.No Description Unit 3BHK -1 3BHK -2 3BHK -3 3BHK -4 1BHK -1 1BHK -2
Total
Qty.
BR-1 BR-2 BR-3 DWg BR-1 BR-2 BR-3 DWg BR-1 BR-2 BR-3 DWg BR-1 BR-2 BR-3 DWg BR Dwg BR Dwg
Rm Rm Rm Rm rm rm
1 1st Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
2 2nd Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
3 3rd Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
4 4th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
5 5th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
6 6th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
7 7th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24
8 8th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 21
9 9th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24

10 10th Floor Nos 1 1 1 2 1 1 2 1 1 2 1 1 1 2 1 2 1 2 24


Gym (part-1) Gym (part-2)

11 11th Floor Nos 2 2 4


Total 241
RAB-06

Consolidated Construction Consortium Limited


Name of the Project: Extension of M.D.C at XIM University Bhubaneswar
RAB-7
Hot dip galvanised wire mesh cable tray
E SCHEDULE -E-CABLE TRAY
last Bill
SL NO DESCRIPTION UNIT This Bill Qty Up to this Qty.
Qty

1 Supply & Fixing of following size hot dip


galvanised wire mesh cable tray complete with
coupling kit, support etc. Complete to be
suspended from the ceiling / along with wall /ducts
as required.
a 600mm (W) x 54mm (H) Mtr 59 156.5 215.5
Electrical Room to Shaft Entrance at Stilt Floor
Level (South) 26.5
Electrical Room to Shafts Entrance at Stilt Floor
Level (North) 76.5
Electrical Room1 to Electrical room 2 53.5

b 450mm (W) x 54mm (H) Mtr 16.4 50.4 66.8


8th to 1st Floor (Shaft 1,2,3 & 4) 50.4

c 300mm (W) x 54mm (H) Mtr 24 42 66


5th to 4th Floor (Shaft 1,2,3 & 4) 6
Electrical Room1 to Electrical room 2 18
DATA Room to Shaft 18

CCCL ECS
Cable Schedule
Cond
Cable Size From To cable Qty. (RMT) Gland
Sl.No uctor # Runs
Panel Location Panel Location 95 70 25 95 mm 70mm 25mm
1 3.5C 70Sqmm A2XYF alumin 2 DB-CS-2 North (part-2) 127.6 4
2 3.5C 95Sqmm A2XYF alumin 1 MB-L1 South (part-1) 8 2
3 3.5C 95Sqmm A2XYF alumin 1 MB-L2 North (part-2) 64 2
4 3.5C 95Sqmm A2XYF alumin 1 MB-L3 South (part-1) 12.9 2
MDB-L South (part-1)
(FEP) Fire
3.5C 70Sqmm A2XYF alumin 2 Emergency 10 2
5 Panel South (part-1) 10 2
6 3.5C 25Sqmm A2XYF alumin 1 DB-CS-1 South (part-1) 15 2
7 3.5C 95Sqmm A2XYF alumin 2 MB-P1 South (part-1) 21 4
8 3.5C 95Sqmm A2XYF alumin 2 MB-P2 North (part-2) 137 4
9 3.5C 95Sqmm A2XYF alumin 2 MB-P3 South (part-1) 22 4
MDB-P South (part-1)
11TH FLOOR Ele.
FDB-P 11TH
3.5C 95Sqmm A2XYF alumin 1 Shaft- South 63.3 2
FLOOR
10 (part-1)
11TH FLOOR
11 3.5C 25Sqmm A2XYF alumin 1 DB- LIFT-1 Corridor 80.5 2
MDB- Lift North (part-2)
12 3.5C 25Sqmm A2XYF alumin 1 DB- LIFT-2 80.5 2
11TH FLOOR Ele.
3.5C 70Sqmm A2XYF alumin 1 North (part-2) FDB-L 11TH Shaft North 58.5
DB-CS-2 (part-2)
13 FLOOR 2
14 3.5C 95Sqmm A2XYF alumin 1 MDB- Lift North (part-2) 11.5 2
15 95
North (part-2)
alu 2 DB-CS-2 solar panel Terrace 95
3.5C 25Sqmm A2XYF
16 3.5C 25Sqmm A2XYF alu 1 South (part-1) Terrace 110
Total 349.7 196.1 476 24 8 6
Refer Dwg. No

ECS/XIM/EM/WD/ ELECT. SLD 02 2021-22, Dt. 15.09.21

ECS/XIM/EM/WD/ ELECT. SLD 01 2021-22, Dt. 15.09.21

Nil

ECS/XIM/EM/WD/ ELECT. SLD 09 2021-22, Dt. 15.09.21

190
SL NO DESCRIPTION UNIT QTY NT Item Remark

NT Item - FIXING OF LIGHT FITTING RATE AMOUNT


1 Installation/ Fixing, on floor/ Ceiling / wall / Staircase including making end
termination and testing of following Light fixtures/ fittings as required complete
as per direction of Engineer-in-charge. (Location Typical Floors 1 to 11th Floor
and Stilt Floor)
(a) Tube Light Nos 275 195.00 53,625
(b) Ceiling Fan Nos 323 325.00 104,975
(c) Surfacemounted circular/ square Light Nos 1630 195.00 317,850
2 Installation/ Fixing, on Ceiling/ wall including making end termination and testing
of following Light fixtures/ fittings as required complete as per direction of
Engineer-in-charge. (Location: Lift Shaft)
(a) Bulkhead Light Nos 60 200.00 12,000
Total 488450.0
CONSOLIDATED CONSTRUCTION CONSORTIUM LTD

ELECTRICAL NON TENDER ITEM RATE ANALYSIS

Project Extension of M.D.C at XIM University Bhubaneswar

Architect: M/s. Designers Forum

Electrical: M/s. Electrical Consultancy Services

Sl. No.

1 Installation & Fixing of Tube Light fixture

Unit CCCL Submitted


CCCL
Description
Co-eff
Rate

1 Basic Rate For Labour charges

No 167.50
Tube Light & Surfacemounted circular/ square Light

Sub Total

Tools &Tackles @ 2%

Sub Total (A)

Contractor profit & overheads @ 15%

Total For Installation

Installation Say in Rupees

Reason for Extra Item

Submitted by :
M/s CCCL
Approved by :

M/s .Electrical Consultancy Services

CONSOLIDATED CONSTRUCTION CONSORTIUM LTD

ELECTRICAL NON TENDER ITEM RATE ANALYSIS


Project Extension of M.D.C at XIM University Bhubaneswar

Architect: M/s. Designers Forum

Electrical: M/s. Electrical Consultancy Services

Sl. No.

1 Installation & Fixing of Ceiling Fan fixture

Unit CCCL Submitted


CCCL
Description
Co-eff
Rate

1 Basic Rate For Labour charges


No 278.05
Ceiling Fan

Sub Total

Tools &Tackles @ 2%

Sub Total (A)

Contractor profit & overheads @ 15%

Total For Installation


Installation Say in Rupees
Reason for Extra Item

Submitted by :

M/s CCCL
Approved by :

M/s .Electrical Consultancy Services

CONSOLIDATED CONSTRUCTION CONSORTIUM LTD

ELECTRICAL NON TENDER ITEM RATE ANALYSIS


Project Extension of M.D.C at XIM University Bhubaneswar

Architect: M/s. Designers Forum

Electrical: M/s. Electrical Consultancy Services

Sl. No.

1 Installation & Fixing of Bulkhead Light fixture

Unit CCCL Submitted


CCCL
Description
Co-eff
Rate

1 Basic Rate For Labour charges


No 171.69
Bulkhead Light

Sub Total

Tools &Tackles @ 2%

Sub Total (A)


Contractor profit & overheads @ 15%

Total For Installation


Installation Say in Rupees

Reason for Extra Item

Submitted by :

M/s CCCL
Approved by :

M/s .Electrical Consultancy Services


CCCL Submitted
Remarks
Amount

167.50

167.50

3.35

170.85

25.13

195.98

195.98
CCCL Submitted
Remarks
Amount

278.05

278.05

5.56

283.61

41.71

325.32

325.32
CCCL Submitted
Remarks
Amount

171.69

171.69

3.43

175.12
25.75

200.87

200.87