RAB-7-ELE Final
RAB-7-ELE Final
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
Remarks
A SCHEDULE - A- WIRING Qty. Rate Amount Qty. Amount Qty Amount Qty Amount
A-1 Wiring to light, ceiling fan, exhaust fan, call bell, & 6A On board with 1.5sqmm
FRLS PVC insulated 1100 volt grade multistranded copper conductor wire for
phase, neutral and earth continuity conductor run inside 2mm wall thick ISI
mark FRLS rigid PVC conduit pipe surface or recessed in wall/ column/
ceiling / above false ceiling / under the floor of the building including supply of
materials such as clip-in type modular switches, metallic concealed box, wire, ,
junction box etc as per the electrical layout drawing & technical specifications
complete with making good to the damages caused as required and as per
direction of Engineer-in-charge.
(a) Single Light Point (Group-C) Each 1,250.00 1,050.30 1,312,876 1,479.00 1,553,395.2 26.00 27,307.83 1,505.00 1,580,703.01
(b) Fan point (Group-C) 500.00 1,098.64 549,318.50 257.00 282,349.71 3.00 3,295.91 285,645.62
Each 260.00
(c) Exhaust Fan point (Group-C) 2.00 1,404.77 2,809.53
Each
(c) Call Bell Point (2Modular) (Group-C) Each 60.00 1,179.20 70,751.82 59.00 69,572.62 - - 59.00 69,572.62
(d) 2way Light Point (Group-C) Each 225.00 2,174.11 489,175.43 124.00 269,590.01 - - 124.00 269,590.01
(e) 6A Socket & switch on existing Switch board Each 700.00 268.87 188,208.30 867.00 233,109.42 4.00 1,075.48 871.00 234,184.90
A-2 Wiring for group controlled (looped) light point/exhaust fan point/ call bell point
(without independent switch etc.) with1.5sqmm FRLS PVC insulated 1100 volt
grade multistranded copper conductor wire for phase, neutral and earth
continuity conductor run inside 2mm wall thick ISI mark rigid Heavy Class PVC
conduit pipe surface or recessed in wall/ column/ ceiling / above false ceiling / -
under the floor of the buildinge etc. as required. as per drawing and as per
the direction of Engineer in charge
(a) Subsequent point of group control. 618.00 473,590.09 53.00 40,615.33 671 514,205.42
Each 550 766.327 421479.85
A-3 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess, including providing and
fixing 5 pin 6 A modular Universal socket outle and 6 A clip-in type modular
switches connections etc. as required. as per drawing and as per the
639.00 308,867.04 2.00 966.72 641 309,833.76
direction of Engineer in charge
Nos 1050 483.36 507528
A-4 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess, including providng and
fixing 2 nos. 5 pin 6 A modular Universal socket outle and 2nos 6 A clip-in type
modular switches, connections etc. as required. as per drawing and as per 178.00 158,632.71 - - 178 158,632.71
the direction of Engineer in charge
Nos 500 891.195 445597.5
A-5 Supplying and fixing suitable size Separate metallic concealed box with
modular plate and cover in front on surface or in recess including providing and
fixing 6/16A Modular Socket & 16 A modular switch, connections etc. . as
required. as per drawing and as per the direction of Engineer in charge 257.00 157,090.99 9.00 5,501.24 266 162,592.23
CCCL 1 of 51 ECS
RAB-5
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
A-8 Wiring for circuits and submain with following number & sizes of FRLS PVC Remarks
insulated 1100 volt grade multistranded copper conductor wire run inside
suitable dia,2mm wall thick ISI mark rigid Heavy Class PVC conduit pipe
surface or recessed in ceiling/ column/ walls of building including supply of all
materials such as wires, PVC. conduit, PVC. junction box & pull box etc
complete with making good to the damages caused as required and as per
direction of Engineer-in-charge.
0 0
(a) 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire( for point wiring beyond 5mtrs
long & 6A Switch Socket (Sep. board ) & 2nos 6A Switch Socket (Sep. 8369 1280992.616 125.60 19,224.84 8494.6 1,300,217.45
board ) ) Metre 6000 153.064 918384
(b) 2 X 2.5 sq. mm + 1 X 1.5 sq. mm earth wire(As per SLD)
14783 2649793.618 1,316.80 236,031.13 16099.8 2,885,824.75
Metre 8500 179.246 1523591
(c) 2X 4 sq. mm + 1X 2.5 sq. mm earth wire(BDB to AC & DB-C.S to BDB-
L(C.S) 1st Floor to 10th Floor As per SLD) 3177.1 719851.4325 843.40 191,093.36 4020.5 910,944.79
Metre 6500 226.575 1472737.5
(d) 2X 6 sq. mm + 1X 4 sq. mm earth wire(Meter board to BDB-L & DB C.S to
BDB-L As per SLD) 5,089.90 1,486,403.50 5089.9 1,486,403.50
Metre 7000 292.03 2044210
(e) 4X 6 sq. mm + 2X 4 sq. mm earth wire (Meter board to BDB-L(Stilt Floor) As
per SLD) 60.00 33,291.42 60 33,291.42
Metre 100 554.857 55485.7
(f) 4X 10 sq. mm + 2X 6 sq. mm earth wire( Meter board to BDB-P & FDB-L
(11th Floor)to BDB-L1/L2(11.F)) As per SLD ) 2,755.10 2,272,221.89 2755.1 2,272,221.89
Metre 3000 824.733 2474199
(g) 4X 16 sq. mm + 2X 10 sq. mm earth wire(FDB-P(11th floor) to
BDB-P1/P2(11.F)) As per SLD ) 100.00 125,170.10 100 125,170.10
Metre 150 1251.701 187755.15
A-9
Supply and fixing circular/ HEXAGONAL G.I. box for ceiling fan clamp, of
internal dia 140 mm, 73 mm height, top lid of 1.5 mm thick G.I. sheet with its
top surface hacked for proper bonding, top lid shall be screwed into the G.I.
378.00 123,709.95 31.00 10,145.53 409 133,855.48
box by means of 3.3 mm dia round headed screws, one lock at the corners.
Clamp shall be made of 12 mm dia M.S. bar bent to shape as per standard
drawing.
Nos 500 327.275 163637.5
A-10 Supplying and fixing PVC batten/ angle holder including
connections etc. as required, as per drawing and as per the direction of - -
Engineer in charge Nos 100 85.595 8559.5
A-11 Supplying and fixing 3 pin, 6 amp ceiling rose including
connections etc. as required, as per drawing and as per the direction of 493.00 32,269.32 493 32,269.32
Engineer in charge Nos 2000 65.455 130910
A-12 Supplying and fixing suitable size metallic concealed box with modular plate
and cover in front on surface or in recess, including providng and fixing 1 no.
Stepped type Modular Fan regulator (2 module), connections etc. as 378 253890.882 3.00 2,015.01 381 255,905.89
required. as per drawing and as per the direction of Engineer in charge
Nos 500 671.669 335834.5
Amount of SCHEDULE - A- WIRING (A) 13,904,883 8,728,717.8 4,486,628.58 13,215,346.37
(i) 25mm dia (TV , DATA & Telephone) (Room to Data shaft) Metre 17000 80.75 1372750 6358.6 513456.95 - - 6358.6 513,456.95
B2 Supplying and fixing suitable size metallic concealed box with modular plate
and cover in front on surface or in recess, including providng and fixing of
following type of Modular Sockets, connections etc. as required.
0
(i) RJ 45 UTP information outlet. Nos 200 643.15 128630 6 3858.9 - - 6 3,858.90
(ii) TV outlet Socket Nos 300 371.45 111435 59 21915.55 - - 59 21,915.55
(iii) Telephone outlet Socket (RJ-11) Nos 450 402.8 181260 2 805.6 - - 2 805.60
Amount of Data Point & TV POINT (B) 1,794,075 540,037.00 - 540,037.00
CCCL 2 of 51 ECS
RAB-5
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
C SCHEDULE- C-CABLING WORK Remarks
C1 Supply, Laying & testing of following size of PVC insulated, PVC sheathed,
round/strip armoured aluminium conductor power cable of 1100 volt grade
clamped on surface of wall/ column/ existing RCC/ stone ware/ masonry cable
trench/ cable trey/ through G.I. pipe/ hume pipe as the case may be, including
cost of saddles/ clamps/ markers etc but excluding the cost of G. I. pipe/ hume
pipe compete with making good the damages caused and returning the balance
unused cables to stores as required and as per direction of Engineer-in-charge.
(e) DB-C.S
Complete duly factory wired as per SLD Set 1.0 190,912.95 190,912.95 1.00 190,913 1.00 190,913.0
CCCL 3 of 51 ECS
RAB-5
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
Instruments:-1 set of LED type phase indicating lamps with control fuses Remarks
(e) DB-LIFT
Incomer: 63A 4P MCI
Bus bar: 4 nos. 20x3mm E.C strips
Outgoing: 1no 25A 4P RCCB(100mA)
1NO 32A 3PN MCB.'C' (1okA)
2 Nos 25A 2P RCCB (100mA) each followed 3 Nos 6-32 Amp 1P MCB 'C' as
per SLD'
1no 25A 2P RCCB(100mA)
Instruments: 1 set.LED type phase indicating lamps with control fuses
1 no.60/5A CT operated Digital ammeter
1 nos.0-500V Digital voltmeter
Complete duly factory wired as per SLD Set 2.0 39,242.60 78,485.20 2.00 78,485.20 - - 2.00 78,485.20
D2 Supply, delivery, installation, testing & commissioning of L.T. indoor floor wall
mounted type distribution boards of original factory made enclosures of the
same brand as per MCB conforming to the relevant ISS and as per special
conditions of contract, making good the damages caused complete as per the
direction of Engineer-in-charge
CCCL 4 of 51 ECS
RAB-5
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
Incoming: 25A 2P RCCB (100mA) Remarks
Outgoing : 4Nos 6-32 Amp 1P MCB 'C' as per SLD
Complete duly factory wired as per SLD Set 20.0 5,029.30 100,586.00 21.00 105,615 1.00 5,029 22.00 110,645
F SCHEDULE -F-EARTHING
1 Supply of all materials, installation & testing of Maintenance free Safe Earthing
electode ( chemical earthing) with earthing electode of 3 metre long 50mm
diameter hot dip galvanised pipe confirming IS:3043 including cost of 50kg
chemical filling compound, masonary enclosure, C I cover, labour charges for 10.0 18,298.00 170,000.00 20 365960 - - 20 365960
excavation of pit in all kinds of soil complete as required. As per direction of
Engineer-in-charge
Nos
2 Supply of material & laying under ground / floor / wall including making end
termination and testing of following sizes of G.I. / Cu earthing conductor for loop
earthing of equipments, switch boards & panels as required complete as per
direction of Engineer-in-charge.
(a) 40 x 5 mm G.I flat Metre 400.0 303.00 130,000.00 369.3 111897.9 210.00 63,630 579.3 175527.9
(b) 25 x 5 mm G.I flat Metre 300.0 186.00 54,000.00 360 66960 - - 360 66960
(c) 25 x 5 mm Cu. flat Metre 200.0 1,413.00 240,000.00 15.6 22042.8 94.00 132,822 109.6 154864.8
3 Supply of material & laying under ground/ floor/ wall including making end
termination and testing of following size of Cu/G.I. wire for loop earthing of
equipments, switch boards & panels as required comlete as per direction of
Engineer-in-charge.
(a) 8 swg G.I wire Metre 200.0 26.00 5,000.00 0 65.20 1,695 65.2 1695.2
(b) 8SWG HDBC wire Metre 300.0 147.00 37,500.00 0 - - 0
F1 LIGHTNING PROTECTION
1 Supply, delivery, installation, testing and commissioning of Early Streamer
Emission (ESE) system of Lightning protection Airterminal compling with NFC -
17-102 standards ( RP= 45mtrs.Level I @ 5mtr Height) including air terminal, - - 1 110100
complete with G.I mounting mast & foundation etc as required and as per
direction of Engineer-in-charge
No 1.0 110,100.00 150,000.00 1 110100
i Lighting Strike Counter set 1.0 25,870.00 30,000.00 1 25870 - - 1 25870
ii Supply of 70sq.mm cross section downconductor of single core flexible Copper
cable made of min.990Nos copper strands of 3mm dia and having PVC
insulation of min. 3mm thickness and overall dia of 16mm. It should be fixed
using SS/GI saddles & fixtures every 0.5mtr.
a Single core flexible Cu. Cable 70Sq.mm with SS saddles. mtr 100.0 1,232.00 65,000.00 80 98560 - - 80 98560
CCCL 5 of 51 ECS
RAB-5
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
2 Supplying and fixing of lightning conductor finial, made of 25 mm dia 1000 mm Remarks
long, G.I. tube, having single prong at top, with 85 mm dia 6 mm thick G.I. base
plate including holes etc. complete as required and as per the direction of - - 10 26910
Engineer in charge.
Each 10.0 2,691.00 15,000.00 10 26910
3 Supplying and fixing 25 mm X 5 mm G.I. strip on surface for roof conductor &
down Conductor etc. as required and as per the direction of Engineer in charge. - - 730 168630
Metre 770.0 231.00 138,600.00 730 168630
4 Supplying and laying G.I. Strip 40 mm X 5 mm from earth electrode directly in
ground for ground conductor as required and as per the direction of Engineer - - 258.1 98336.1
in charge Metre 200.0 381.00 65,000.00 258.1 98336.1
5 EARTHING
Supply of all materials, installation & testing of Maintenance free Safe Earthing
electode ( chemical earthing) with earthing electode of 3 metre long 50mm
diameter hot dip galvanised pipe confirming IS:3043 including cost of 50kg
chemical filling compound, masonary enclosure, C I cover, labour charges for - - 11 201278
excavation of pit in all kinds of soil complete as required. As per direction of
Engineer-in-charge
Set 11.0 18,298.00 187,000.00 11 201278
Amount of SCHEDULE- EARTING & LIGHTNING PROTECTION (F) 1,287,100 1,296,545 198,147 1,494,692.0
CCCL 6 of 51 ECS
RAB-5
SL NO DESCRIPTION UNIT Bill of Quantity last Bill Statement This Bill Statement Up to this Statement
(a) Supply and hanging of shock treatment chart duly bound/laminated. Nos. 2.0 709.00 1,418.00 2.00 1,418 2.00 1,418
Remarks
Supply and installation of 3 Nos. fire buskets on a mild steel stand complete as Set
(c) per specification and requirement of fire safety provisions. 1.00 4,336 4,336
1.0 4,336.00 4,336.00 1.00
Supply & installation of 5-Kg capacity dry CO2 type fire extinguisher complete Set
(d) as required 2.00 15,392 15,392
2.0 7,696.00 15,392.00 2.00
Supply & installation of 5-Kg capacity ABC powder type fire extinguisher Set
(e) complete as required 2.00 9,672 9,672
2.0 4,836.00 9,672.00 2.00
Supply & installation of 1100volt grade ISI marked insulating rubber mat sqmtr
(f) complete as required 60.00 89,340 60.00 89,340
60.0 1,489.00 89,340.00
First aid box With first aid kits such as( Gauze pads (at least 4 by 4 inches, Two Set
large gauze pads (at least 8 by 10 inches), A box of adhesive bandages, One
(g) gauze roller bandage, Two triangular bandages., Wound cleaning agent., 1.00 3,920 3,920
Scissors At least one blanket., and Anti-Septic Cream Complete as required
1.0 3,920.00 3,920.00 1.00
(h) Supply and installation of 440-volt danger notice plate Nos. 3.0 488.00 1,464.00 3.00 1,464 3.00 1,464
Amount of SCHEDULE- SAFETY EQUIPMENT (G) 125,542.0 - 125,542.0 125,542.0
CCCL 7 of 51 ECS
RAB-7
Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-6 A-7 A-9 A-10 A-11 A-12
South Block
1 1st Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
2 2nd Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
3 3rd Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
4 4th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
5 5th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
6 6th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
7 7th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
8 8th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
9 9th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
10 10th Floor 67 12 3 6 40 28 30 9 12 7 7 18 20 18
11 11th Floor 32 9 7 22 27 8 7 9 14 9
Stilt Floor
12 (I&II) 26 3 4 53 2 9 31 15 3
6/16A 1 no.
6A Socket Subsequen 5 pin 6 A 2 nos. 5 Modular 32A DP circular/ PVC 3 pin, 6 Stepped
Single Fan Exhaust Call Bell 2way & switch t point of modular pin 6 A Socket & 25 A Switch HEXAGON batten/ amp type
Sl.No Floor Light point Fan Point Light on existing group Universal modular 16 A 2modular with AL G.I. box angle ceiling Modular
Point point Point Switch control. socket Universal modular socket, Indicator for ceiling holder rose Fan
board socket switch 2modue fan clamp regulator
Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-6 A-7 A-9 A-10 A-11 A-12
North Block
1 1st Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
2 2nd Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
3 3rd Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
4 4th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
5 5th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
6 6th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
7 7th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
8 8th Floor 67 11 2 6 37 29 16 7 12 6 6 18 25 18
9 9th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
10 10th Floor 69 12 3 6 40 29 30 9 12 7 7 18 25 18
11 11th Floor 33 9 7 26 26 9 7 9 14 9
Sl.No (As per BOQ) A-8(a) A-8(b) A-8(c) A-8(d) A-8(e) A-8(f) A-8(g)
South Block
1 1st Floor 2 2 2 1
2 2nd Floor 2 2 2 1
3 3rd Floor 2 2 2 1
4 4th Floor 2 2 2 1
5 5th Floor 2 2 2 1
6 6th Floor 2 2 2 1
7 7th Floor 2 2 2 1
8 8th Floor 2 2 2 1
9 9th Floor 2 2 2 1
10 10th Floor 2 2 2 1
11 Stilt Floor 1 ELDB - 16Way
Part- 1 Sub Total (a) 21 20 20 10 1 1
North Block
1 1st Floor 2 2 2 1
2 2nd Floor 2 2 2 1
3 3rd Floor 2 2 2 1
4 4th Floor 2 2 2 1
5 5th Floor 2 2 2 1
6 6th Floor 2 2 2 1
7 7th Floor 2 2 2 1
8 8th Floor 2 2 0 2 DATA DB- 8Way
9 9th Floor 2 2 2 1
10 10th Floor 2 2 2 1
11 Stilt Floor
ELDB- 16Way
1 1 DATA DB- 8Way
Part- 2 Sub Total (B) 21 20 18 12
Floor Qty (a+b) 42 40 38 22 2
6A circula
2 nos. r/ 1 no.
Socket Subse 5 pin 5 pin 6 HEXA Stepp
Circui Circuit SB.No Single & quent 6 A PVC
Exhau Call 2way switch point modul A GONA batten 3 pin, ed
Loca t Descri / PP Light Fan st Fan Bell Light on of ar modul L G.I. / 6 amp type
tion phas point ar box ceiling Modul
e/ No ption No Point point Point Point existin group Univer Univer for angle rose ar Fan
g contro sal holder
Switch l. socket sal ceiling regula
board socket fan tor
clamp
Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-9 A-10 A-11 A-12
South Block
SB-1 1 1
SB-2 2 1 1 1 2 1
Y Drawin SB-3 1 1
phase-
Ckt. 1 g room PP-1 1
TV
Point 1 1
SB-16 2 1 2
Bed SB-17 2 1 1 1 2 1
Y Room
phase- 1 & SB-18 1 1 1
Ckt. 2 SB-19 1 1 1
Toilet
PP-20 1
SB-10 2 1 2
Bed SB-11 1
Y Room
phase- SB-12 1 1 1 1
Ckt. 3 2 & SB-13 1 1 1
Toilet
PP-14 1 1 1
SB-6 1 1 1
3BHK- Bed
1 Y SB-7 1 1 1 1
phase- Room SB-8 1 1 1
3&
Ckt. 4 Toilet SB-9 2 1 2
PP-12 1 1 1
SB-14 2 1 1 2 1 4 1
SB-15 2 1 1 2 1 4 1
Y Dinnin PP-17 1
phase- g
Ckt. 5 Room Fridge
point
(PP-18)
1
SB-4 1 1 1
SB-5 2 2 2
PP-3 1
Y PP-4
phase- Kitchen PP-8 1
Ckt. 6 PP-9
PP-10
1
SB-1 1 1
SB-2 2 1 1 1 2 1
B
Drawin SB-3 1 1
phase- g room
Ckt. 1 PP-1 1
TV
Point 1 1
SB-16 2 1 2
Bed SB-17 2 1 1 1 2 1
B
phase- Room SB-18 1
Ckt. 2 1 & SB-19 1 1 1
Toilet
PP-20 1
3BHK-
RAB-7
circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
board
clamp
SB-10 2 1 2
Bed SB-11 1 1 1
B
phase- Room SB-12 1 1 1 1
Ckt. 3 2 & SB-13 1 1 1
Toilet
SB-14 1 1 1
3BHK- SB-6 1 1 1
2 Bed SB-7 1 1 1 1
B
Room
phase- 3 & SB-8 1 1 1
Ckt. 4 Toilet SB-9 2 1 2
PP-12 1 1 1
SB-14 2 1 1 2 1 4 1
B Dinnin SB-15 2 1 1 3 1 4 1
phase- g PP-17 1
Ckt. 5 Room
Fridge
point 1
SB-4 1 1 1
SB-5 2 2 2
PP-3 1
B PP-4
phase- Kitchen
Ckt. 6 PP-8 1
PP-9
PP-10
1
SB-1 1 1
SB-2 2 2 1 1 2 3 2
SB-3 1 1 2 2
R Drawin PP- 1&
phase- g room 2
Ckt. 1 2
TV
POINT
2 1
R Dinnin SB-4 2 2 1 1 2 3 2
phase- g PP-3 1
Ckt. 2 Room PP-4 1
SB-5 2 1 1 2 1 4 1
R PP-7 1
1BHK phase- Kitchen
lobby Fridge
Ckt. 3 point
pp-5 1
Bed SB-6 2 1 1 1 1 3 1
R 1 1 1
Room SB-7 1 1 1
phase- & SB-8
Ckt. 4 Toilet PP- 15 1
PP-16 1
PP-8 1
PP-10
R PP-12 1
phase- Kitchen PP-13
Ckt. 5 PP-14 1
Fridge
point 1
circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
board
clamp
R
phase- CorridorSB-1
Ckt. 1 4 9
COR R
RIDO phase- CorridorPP-1
R Ckt. 2
Floor ceiling
Emrge
ncy CorridorESB
Circuit 2 3 Stilt Floor
Part- 1 Sub Total (a) 67 12 0 3 6 40 28 30 9 18 0 79 18
circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
board
clamp
North Block
SB-1 1 1 ###
B 1 2 1
Drawin SB-2 2 1 1
1
phase- g room SB-3 1 ###
Ckt. 1 PP-1
TV 1 ###
1 1 ###
Point
SB-16 2 1 2 ###
B Bed SB-17 2 1 1 1 2 1
Room SB-18 1 ###
phase- 1 &
Ckt. 2 Toilet SB-19 1 1 1 ###
PP-20 1
SB-10 2 1 2
Bed SB-11 1 1 1
B Room SB-12
phase- 1 1 1 1
Ckt. 3 2 & SB-13 1 1 1
Toilet
SB-14 1 1 1
SB-6 1 1 1
3BHK- B Bed SB-7 1 1 1 1
2 phase- Room SB-8 1 1 1
3&
Ckt. 4 Toilet SB-9 2 1 2
PP-12 1 1 1
SB-14 2 1 1 2 1 4 1
B Dinnin SB-15 2 1 1 3 1 4 1
phase- g PP-17 1
Ckt. 5 Room Fridge
pp 1
SB-4 1 1 1
SB-5 2 2 2
PP-3 1
B PP-4
phase- Kitchen PP-8 1
Ckt. 6 PP-9
PP-10
1
Y SB-1 1 1
Drawi SB-2 2 1 1 1 2 1
phas ng SB-3 1 1
e- 1
Ckt. 1 room PP-1
TV 1 1
Point
SB-16 2 1 2
1 2 1
Y Bed SB-17
SB-18
2
1
1 1
1 1
phas Room SB-19 1 1
e- 1& 1
Ckt. 2 Toilet PP-20
1
SB-10 2 1 2
Y Bed SB-11 1 1 1
phas Room SB-12 1 1 1 1
e- 2&
Ckt. 3 Toilet SB-13 1 1 1
SB-14 1 1 1
SB-6 1 1 1
SB-7 1 1 1 1
3BHK Y Bed
-1 phas Room SB-8 1 1
e- 3 & SB-9 2 1 2
Ckt. 4 Toilet
circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
tion phas Descri / PP Light st Fan Bell Light on of ar
ption No Point point point Point Point existin group Univer ar
/
box angle ceiling Modul
e/ No g contro sal Univer for rose ar Fan
sal ceiling holder regula
Switch l. socket socket fan tor
3BHK Y Bed board
clamp
-1 phas Room
e- 3&
Ckt. 4 Toilet
PP-12 1 1
1
SB-14 2 1 1 2 1 4 1
SB-15 2 1 1 2 1 4 1
Y
phas Dinnin PP-17
g
e- Room 1
Ckt. 5 Fridge
pp 1
SB-4 1 1 1
SB-5 2 2 2
Y PP-3 1
phas Kitche PP-4
PP-8 1
e- n PP-9
Ckt. 6
PP-10
1
SB-1 1 1
SB-2 2 2 1 1 2 3 2
R Drawi SB-3 1 1 1 2
phas PP-
e- ng 1& 2
room 2
Ckt. 1
TV
POINT
2 1
R SB-4 2 2 1 1 2 3 2
phas Dinnin
g
e- Room PP-3 1
Ckt. 2 PP-4 1
R Kitche SB-5 2 1 1 2 1 4 1
phas n PP-7 1
e- Fridge
Ckt. 3 lobby pp
1
SB-6 2 1 1 1 1 3 1
1BHK SB-7 1 1 1
R Bed SB-8 1 1 1
phas Room
e- & PP- 15
Ckt. 4 Toilet 1
PP-16
1
PP-8 1
PP-10
R PP-12
1
phas Kitche
e- n PP-13
Ckt. 5
PP-14
1
RAB-7
circula
6A 2 nos. r/ 1 no.
Socket Subse 5 pin
& quent 6 A 5 pin 6 HEXA PVC Stepp
Circui A GONA 3 pin, ed
Loca t Circuit SB.No Single Fan Exhau Call 2way switch point modul modul L G.I. batten 6 amp type
R Descri / PP Light point st Fan Bell Light on
tion phas of ar /
phas ption No Point point Point Point existin group Univer ar box angle ceiling Modul
e/ No Kitche g contro sal Univer for rose ar Fan
e- n sal ceiling holder regula
Ckt. 5 Switch l. socket socket fan tor
board
clamp
Fridge
pp 1
R
phas
e- CorridoSB-1
Ckt. 1
5 11
COR
RID
OR R
phas
e- CorridoPP-1
Ckt. 2
Emrg
ency
Circui CorridoESB-1 3 3
Part-t 2 Sub Total (B) 69 12 0 3 6 40 29 30 9 18 0 80 18
Each Floor Qty (a+b) 136 24 0 6 12 80 57 60 18 36 0 159 36
6/16A
1 no. 32A
Modular 1 no. 25 A DP
Circuit Switch
Location phase/ Circuit SB.No/ PP Socket & 2modular with Remark
No Description No 16 A socket Indicator
modular
switch 2modue
North Block
Balcony PP-4 1
Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-9 A-10 A-11
STILT FLOOR
Parking SB-2 1 1 3 2
SB-3 2 1 1 2
Electrical PP-19 1
Room-2 PP-20 1
PP-21 1
SB-7 2 1 1 2
PP-16 1
Stilt
floor DATA ROOM PP-18 1
Part-I & PP 24 1
II
PP-6 1
SB-11 3 10
PARKING- 2
SB-5 3 7
Staircase - SB-6 1 1
Part-2
PARKING-II ESB-1 3 3
Staircase - SB-12 6 19
Part-1
PARKING- I ESB-2 3 4
Stilt
floor SB-13 2 1 1 2
Part-I PP-13 1
Electrical
Room- 1 PP-14 1
PP-15 1
PP-22 1
Stilt floor- Part- I 15
Stilt floor- Part- II 14
Stilt Floor Qty. 26 3 0 0 0 4 53 2 0 9 31 0 0
1 no.
Stepped
type
Modular
Fan
regulator
A-12
3
Page 22 RAB-7
Sl.No (As per BOQ) A-1 (a) A-1 (b) A-1 (c) A-1 (d) A-1 (e) A-1 (f) A-2 (a) A-3 A-4 A-5 A-9 A-10 A-11 A-12
SOUTH BLOCK
Staircas SB-1 3 2 5
Circuit-1
e& SB-2 9 8 13
parapet Circuit-2 SB-3 2 3 1 3 3 5 3
Circuit-3 PP-1 & PP-2 2
Circuit-4 PP-3 & PP-4 1 1
R- Phase
Indoor PP-5, PP-6 &
Activity Circuit-5 PP-7 2 1
Room
PP-8, PP-9 PP-
Circuit-6 10 & PP-11
3 1
SB-4 2 2 1 2 2 4 2
Indoor Circuit-7
Activity SB-5 2 2 1 2 2 4 2
Room
SB-6 2 1 2 4
SB-6A 2
Circuit-8
Room & SB-7 2 2
Toilet SB-8 2 2
Y- Phase
Circuit-9 PP-12 & PP-13
2
NORTH BLOCK
Staircas SB-1 4 2 6
e& Circuit-1 SB-2 1 1 2
parapet SB-3 8 11 15
Circuit-2 SB-4 2 3 1 3 3 5 3
Circuit-3 PP-1 & PP-2 2
R- Phase
Indoor Circuit-4 PP-3 & PP-4 2
Activity PP-5, PP-6 &
Room Circuit-5 PP-7 1 2
PP-8, PP-9 PP-
Circuit-6 10 & PP-11 3 1
Indoor SB-5 2 2 1 2 2 4 2
Activity Circuit-7
Room SB-6 2 2 1 2 2 4 2
SB-7 2 1 2 4
Room & SB-7A 2
Toilet Circuit-8
SB-8 2 2
SB-9 2 2
Y- Phase
Circuit-9 PP-12 & PP-13
2
AC Point-1 1 1
Indoor
R phase- Activity
Room AC Point-2 1 1
AC Point-3 1 1
Indoor AC Point-4 1 1
Y phase- Activity
Room
AC Point-5
1 1
AC Point-6 1 1
B phase- GYM
AC Point-7
1 1
South Total 7 7
NORTH BLOCK
AC Point-1 1 1
Indoor
R phase- Activity AC Point-2 1 1
Room
AC Point-3 1 1
Indoor AC Point-4 1 1
Y phase- Activity
Room AC Point-5 1 1
AC Point-6 1 1
B phase- GYM
AC Point-7 1 1
South Total 7 7
CCCL 30 OF 51 ECS
Page 31 RAB-7
Corridor- South_Normal
point Single
SB1 - South Sub-1 sub-2 Sub-3 Sub-4 point Above 5
.1
(Normal) total (Qty) Mtr.
point. Single
ESB- 1- South 1 Sub-1 sub-2 Sub-3 Sub-4 point Above 5
Corridor- North_Normal (Emerg.) total (Qty) Mtr.
point Single
SB1- North Sub-1 sub-2 Sub-3 Sub-4 point Above 5
.1
(Normal) total (Qty) Mtr. Point-1 4.2 5.8 10 2 0.8
Point-1 7.4 3.7 6.7 3.3 21.1 4 4.1 Point-2 3.8 8.6 7.7 20.1 3 6.3
Point-2 5.1 7 12.1 2 2.1 Point-3
Point-3 8.3 6.3 14.6 2 4.6 Point-4
Point-4 10 7.3 2.9 6.9 27.1 4 9.2 Total 7.1
Point-5 3.8 3.2 4.4 6.8 18.2 4 1.8
Total 21.8 Corridor- North_Emergency
point. Single
ESB- 1- North Sub-1 sub-2 Sub-3 Sub-4 point Above 5
1
(Emerg.) total (Qty) Mtr.
Point-1 2.3 7 9.3 2 2
Point-2 3.5 6.7 10.2 2 1.7
Point-3 10.1 6.7 16.8 2 6.8
Point-4
Point-5
Total 10.5
CCCL 31 OF 51 ECS
Page 32 RAB-7
10.1 10.1
Dinn. Point no. 19 RMT
16.5 16.5
oven PP 9 RMT
23 23
W.M/C PP 8 RMT
4 4
Dinn. Poi pp5 RMT
Total 1BHK 15.9 43.5
2X 4 sq. mm + 1X 2.5 sq. mm earth wire
LIFT Lighting circuit
From UOM to Circuit 2x4 1x2.5 switch on
Single Light 2way Point existing
Lift-1 Point Switch
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Lift-2
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Lift-3
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Lift-4
DB- Lift RMT stilt floor 2way 50 1
DB- Lift RMT stilt floor circuit for load 60 14 14
Total RMT 440 56 4 56
Point wiring
11th North Point
DWG. Rm (CKTPO.1 2 3 4 5 2x1.5+1.5Sqmm
SB 1 5 2 7 10 7
SB 2 3 0
SB 3 12 2 18 30 45
DWG. Rm (CKT 2)
SB 4 16 10 5 7 10 23
DWG. Rm (CKT 7)
SB 5 9 10 5 9 13
SB 6 10 11 6 10 17
DWG. Rm (CKT 8)
SB 7 11 12 22 30
SB 8 1.5 4.5
SB 9 1 4
DWG. Rm (CKT 13)
SB 10 10 5 5
SB 11 10 5
DWG. Rm (CKT 14)
SB 12 7 5 2
SB 13 4 5
SB 14 1
147 0 0
Lighting main circuit
Lighting main circuit 11th (North) 2x2.5 2x1.5
11th (South) 2x2.5 2x1.5 DWG. Rm (CKT 1)
DWG. Rm (CKT 1) Db to SB1 15
Db to SB1 15 SB2 17.5
SB2 17.5 SB3 17
DWG. Rm (CKT 2) DWG. Rm (CKT 2)
SB3 9 SB4 20
DWG. Rm (CKT 3) DWG. Rm (CKT 3)
PP 1 15 PP 1 19
PP 2 3.6 PP 2 7.6
DWG. Rm (CKT 4) DWG. Rm (CKT 4)
PP 3 18 PP 3 22
PP 4 8.6 PP 4 12.6
DWG. Rm (CKT 5) DWG. Rm (CKT 5)
PP 5 22 PP 5 26
PP 6 3.1 PP 6 7.2
PP 7 5 PP 7 9.1
PP 8 6.8 PP 8 10.8
DWG. Rm (CKT 6) DWG. Rm (CKT 6)
PP 9 25 PP 9 29
PP 10 1 PP 10 5
PP 11 1 PP 11 5
DWG. Rm (CKT 7) DWG. Rm (CKT 7)
SB 4 15.4 SB 5 19.4
SB 5 3.3 SB 6 7.3
DWG. Rm (CKT 8) DWG. Rm (CKT 8)
SB 6 11.7 SB 7 11.7
SB 7 17.9 SB 8 17.9
SB 8 10.8 SB 9 10.8
DWG. Rm (CKT 9) DWG. Rm (CKT 9)
PP 12 27.6 PP 12 27.6
PP 13 9.3 PP 13 9.3
DWG. Rm (CKT 10) DWG. Rm (CKT 10)
PP 14 20.3 PP 15 20.3
PP 15 5 PP 14 5
DWG. Rm (CKT 11) DWG. Rm (CKT 11)
PP 16 6.2 PP 16 6.2
PP 17 13.4 PP 17 13.4
PP 21 4.8 PP 20 4.8
DWG. Rm (CKT 12) DWG. Rm (CKT 12)
PP 19 19.7 PP 19 19.7
PP 20 3.9 PP 21 3.9
PP 18 2 PP 18 2
DWG. Rm (CKT 13) DWG. Rm (CKT 13)
SB 9 11.3 SB 10 11.3
SB 10 21.9 SB 11 21.9
DWG. Rm (CKT 14) DWG. Rm (CKT 14)
SB 11 12.8 SB 12 12.8
SB 12 12 SB 13 12
SB 13 9 SB 14 9
DWG. Rm (CKT 15) DWG. Rm (CKT 15)
PP 22 8 PP 22 8
PP 23 4.3 PP 23 4.3
PP 24 8.4 PP 24 8.4
DWG. Rm (CKT 16) DWG. Rm (CKT 16)
PP 25 13.7 PP 25 13.7
PP 26 2 PP 26 2
PP 27 3.5 PP 27 3.5
DWG. Rm (CKT 17) DWG. Rm (CKT 17)
PP 28 16.5 PP 28 16.5
PP 29 19.4 PP 29 19.4
PP 30 6.5 PP 30 6.5
PP 31 3 PP 31 3
PP 32 5 PP 32 5
DWG. Rm (CKT 18) DWG. Rm (CKT 18)
PP 33 19 PP 33 19
PP 34 5.4 PP 34 5.4
PP 35 3.1 PP 35 3.1
Total 0 167.6 339.1 Total 3BHK -2 0 203.6 383.3
6A Switch & 6A Socket 3BHK &1BHK Kitchen (Chimney & Aquaguard Points)
NT Item-2
Supply & installation of
Sl.No Floor Separate 6A Socket & 6A Remark
Switch
Sl.No (As per BOQ) A-8(a) A-8(b) A-8(c)
South Block
1 1st Floor 6
2 2nd Floor 6
3 3rd Floor 6
4 4th Floor 6
5 5th Floor 6
6 6th Floor 6
7 7th Floor 6
8 8th Floor 6
9 9th Floor 6
10 10th Floor 6
Part- 1 Sub Total (a) 60 0 0
North Block
1 1st Floor 6
2 2nd Floor 6
3 3rd Floor 6
4 4th Floor 6
5 5th Floor 6
6 6th Floor 6
7 7th Floor 4
8 8th Floor 6
9 9th Floor 6
10 10th Floor 6
3 Supply of material & laying under ground/ floor/ wall including making end
termination and testing of following size of Cu/G.I. wire for loop earthing of
equipments, switch boards & panels as required comlete as per direction of
Engineer-in-charge.
(a) 8 swg G.I wire Metre 65.20
ELDB & BDB (South- Stilt Floor) 9.80 2.00 19.60
ELDB & BDB (North- Stilt Floor) 8.70 2.00 17.40
LDB& PDB- 11th Floor - South 6.70 2.00 13.40
LDB& PDB- 11th Floor - North 7.40 2.00 14.80
(b) 8SWG HDBC wire Metre
F1 LIGHTNING PROTECTION
1 Supply, delivery, installation, testing and commissioning of Early Streamer
Emission (ESE) system of Lightning protection Airterminal compling with NFC
- 17-102 standards ( RP= 45mtrs.Level I @ 5mtr Height) including air terminal,
complete with G.I mounting mast & foundation etc as required and as per
direction of Engineer-in-charge
No 1.0 1.00
i Lighting Strike Counter set 1.0 1.00
ii Supply of 70sq.mm cross section downconductor of single core flexible
Copper cable made of min.990Nos copper strands of 3mm dia and having
PVC insulation of min. 3mm thickness and overall dia of 16mm. It should be
fixed using SS/GI saddles & fixtures every 0.5mtr.
a Single core flexible Cu. Cable 70Sq.mm with SS saddles. mtr 80.0 1.00 80.00
CCCL ECS
Cable Schedule
Cond
Cable Size From To cable Qty. (RMT) Gland
Sl.No uctor # Runs
Panel Location Panel Location 95 70 25 95 mm 70mm 25mm
1 3.5C 70Sqmm A2XYF alumin 2 DB-CS-2 North (part-2) 127.6 4
2 3.5C 95Sqmm A2XYF alumin 1 MB-L1 South (part-1) 8 2
3 3.5C 95Sqmm A2XYF alumin 1 MB-L2 North (part-2) 64 2
4 3.5C 95Sqmm A2XYF alumin 1 MB-L3 South (part-1) 12.9 2
MDB-L South (part-1)
(FEP) Fire
3.5C 70Sqmm A2XYF alumin 2 Emergency 10 2
5 Panel South (part-1) 10 2
6 3.5C 25Sqmm A2XYF alumin 1 DB-CS-1 South (part-1) 15 2
7 3.5C 95Sqmm A2XYF alumin 2 MB-P1 South (part-1) 21 4
8 3.5C 95Sqmm A2XYF alumin 2 MB-P2 North (part-2) 137 4
9 3.5C 95Sqmm A2XYF alumin 2 MB-P3 South (part-1) 22 4
MDB-P South (part-1)
11TH FLOOR Ele.
FDB-P 11TH
3.5C 95Sqmm A2XYF alumin 1 Shaft- South 63.3 2
FLOOR
10 (part-1)
11TH FLOOR
11 3.5C 25Sqmm A2XYF alumin 1 DB- LIFT-1 Corridor 80.5 2
MDB- Lift North (part-2)
12 3.5C 25Sqmm A2XYF alumin 1 DB- LIFT-2 80.5 2
11TH FLOOR Ele.
3.5C 70Sqmm A2XYF alumin 1 North (part-2) FDB-L 11TH Shaft North 58.5
DB-CS-2 (part-2)
13 FLOOR 2
14 3.5C 95Sqmm A2XYF alumin 1 MDB- Lift North (part-2) 11.5 2
15 95
North (part-2)
alu 2 DB-CS-2 solar panel Terrace 95
3.5C 25Sqmm A2XYF
16 3.5C 25Sqmm A2XYF alu 1 South (part-1) Terrace 110
Total 349.7 196.1 476 24 8 6
Refer Dwg. No
Nil
190
SL NO DESCRIPTION UNIT QTY NT Item Remark
Sl. No.
No 167.50
Tube Light & Surfacemounted circular/ square Light
Sub Total
Tools &Tackles @ 2%
Submitted by :
M/s CCCL
Approved by :
Sl. No.
Sub Total
Tools &Tackles @ 2%
Submitted by :
M/s CCCL
Approved by :
Sl. No.
Sub Total
Tools &Tackles @ 2%
Submitted by :
M/s CCCL
Approved by :
167.50
167.50
3.35
170.85
25.13
195.98
195.98
CCCL Submitted
Remarks
Amount
278.05
278.05
5.56
283.61
41.71
325.32
325.32
CCCL Submitted
Remarks
Amount
171.69
171.69
3.43
175.12
25.75
200.87
200.87