FR-043 19.03.2023
FR-043 19.03.2023
number:
Date of Inspection Visit: Vendor/Sub Vendor:
Inspection Notification No: Location:
Result of inspection: Satisfactory Partial Unsatisfactory
Inspection Details:
Description / Notes …
As per the Notification received from. Inspection Visit carried out.
Inspection for offered materials was performed at AASIA Steel in accordance to the Specification &
Requirements. Results found satisfactory. details are given below.
12.3 Marking and Stenciling Inspection for the Cladded As mentioned Above W
Spools Verified Satisfactory
R
Satisfactory
12.3 Marking and Stenciling Inspection for the Cladded As mentioned Above W
Spools Verified Satisfactory
12.4 Prepared and issued Final Inspection Release As mentioned Above H
Note. Satisfactory
Punch Points: NA