Commissioning Inspection
1 T/R CPS07 Zb-082 FL-water South complex satellite Well ZB82 10" 273 0.273 15.9 189 199 170.58678 0.22 0.03753 1/3/2018
completed. done
2 T/R CPS07 Zb-376 FL-water South complex satellite Well ZB376 8" 219 0.219 12.7 4000 4200 2888.172 0.22 0.6354 Commissioning 5/3/2019 Inspection
completed. done
3 T/R CPS08 Zb-67 FL-water ZB-67 F/L TIE IN ZB-376 Well ZB67 8" 219 0.219 12.7 258 271 186.35586 0.22 0.041 Commissioning 3/7/2019 Inspection ZB-67 F/L TIE IN ZB-
F/L completed. done 376 F/L
4 T/R CPS08 Zb-074 FL-water Lower medial complex Well ZB74 10" 273 0.273 15.9 3056 3208.8 2750.64754 0.22 0.60514 Commissioning 12/3/2018 Inspection
satellite completed. done
5 T/R CPS08 Zb-221 FL-water Lower medial complex Well ZB221 10" 273 0.273 15.9 5913 6208.65 5322.17895 0.22 1.17088 Commissioning 16/5/2018 Inspection
satellite completed. done
Zb043 Flow line tie in Zb043 Flow line tie in
6 T/R CPS08 Zb-043 FL-water to Zb 221Existing flow Well ZB043 8" 219 0.219 12.7 1975 2074 1426.20684 0.22 0.31377 HOLD to Zb 221Existing flow
line line
Flow line dirct connect to Commissioning Inspection Flow line dirct connect
12 T/R CPS10 ZB-272 FL-water existingZB-272 F/L flow Well ZB272 10" 273 0.273 15.9 145 152.25 130.511745 0.39 0.0509 3/7/2019 to existingZB-272 F/L
line. completed. done flow line.
15 T/R CPS09 Zb-094 FL-water Upper medial complex Well ZB094 10" 273 0.273 15.9 4680 4914 4212.37908 0.39 1.64283 Commissioning 16/4/2019 Inspection
satellite completed. done
16 T/R CPS09 Zb-234 FL-water Upper medial complex Well ZB234 10" 273 0.273 15.9 6667 7000 6000.54 0.39 2.34021 Commissioning 6/3/2018 Inspection
satellite completed. done
19 T/R CPS09 IPF-2 -T/L Upper medial complex IPF Water 10 273 0.273 19.1 3962 4160.1 3566.12092 0.39 1.39079 Commissioning 7/3/2018 Inspection
IC –FL-Water satellite Manifold area completed. done
26 T/R CPS09 ZB-102 FL-water Zb102Flow line tie in to Well ZB102 8" 219 0.219 12.7 921 967.05 665.001603 0.39 0.25935 Commissioning 16/4/2019 Inspection
Zb 370 well head. completed. done
29 T/R CPS14 18" Water out let Water out let Hammer mishrif New north 18 457.2 0.457 22.2 3429 3600.45 5166.57374 0.39 2.01496 Commissioning 27/5/2018 Inspection
T/L T/L existing DGS DGS completed. done BOND TO 16" UMCS F/L
HM Manifold area
24" Water out let Interface water New PWT WI Commissioning Inspection
30 T/R CPS14 New north DGS HM 24 609.3 0.609 31.75 363 381 728.57106 0.39 0.28414 20/2/2019
T/L out manifold area completed. done
35 T/R CPS14 ZB-278 FL-water 18” WI T/L NE - Well ZB278 8" 219 0.219 12.7 2209 2319.45 1594.99299 0.39 0.62205 Commissioning 3/7/2019 Inspection
CLUSTER - 3 Header completed. done
8" River ZM
43 FL-water New ZM trap area ZM existing 8" 219 0.219 12.7 2967 3115 2142.0609 0.22 0.47125 Commissioning 24/12/2019
T/R CPS PPG Existing DGS to DGS completed.
new trap area.
8" Condensate
47 T/R CPS PPG PPG Trap to ZM FL-water New PPG trap area New ZM trap 8" 219 0.219 12.7 2490 2614 1797.54324 0.22 0.39546 Construction
area work in progress.
Existing DGS .
Actual T/R Measure Balance capacity DSI Project already DSI Project More required Spare capacity in
Existing T/R NO Total Capacity Amp load Amp on 19/06/2019 Amp connected T/R Load Amp T/R Load Amp %