Dsi - Call Off Distribution CTR Sheet Co 03
Dsi - Call Off Distribution CTR Sheet Co 03
OFF 03 CALL OFF 03
A1.1 - Water Injection Wellhead area hook up - WI-WEL-002 - 10" pipe 11 OPT. SoW WI 11 OPT. SoW WI
PRICE BREAKDOWN SCHEDULE -LUMP SUM PRICE (LS) WELL HEAD WELL HEAD
ITEM L0 ITEM L1 ITEM L2 ITEM L3 Description
PREFAB INST. w/o ELE/INS
0.0 PROJECT MANAGEMENT AND SUPPORT ACTIVITIES
0.0a Project Management $8,591.40 $13,364.40
0.0b Support Activity $5,727.60 $8,909.60
1.0 ENGINEERING
1.0a Survey $7,955.00
1.0b Civil Plot‐Plan/Layouts and Details $7,955.00
3.0a.06 Installation of cellar grating
3.0a.07.02 Earthing system for LER
3.0b Piping, Equipment and Painting Works
3.0c.01 Laying LV Electrical cable from end of flowline to LER (in cable trench 3.0a.02)
3.0c.02 Laying FOC from end of flowstation to LER (in cable trench 3.0a.02)
3.0c.03 Laying LV cable from LER to WHCP (in cable trench 3.0a.03)
3.0c.04 Laying LV cable from LER to Field Instruments PT and TT, Ultrasonic Flowmeter and remote
Junction box (in cable trench 3.0a.03)
3.0c.05 Laying I/O cables from Field Instruments PT, TT, Ultrasonic flowmeter and remote Junction
box to LER (in cable trench 3.0a.03)
3.0c.06 Laying I/O cables from WHCP to LER (in cable trench 3.0a.03)
3.0c.07 Installation of Containeraized E&I Substation (LER)
3.0c.08 Cabling hook‐up LV cable to LV Switchgear (inside LER)
3.0c.09 lay FOC cable inside LER and left it, coiled. under the pavement of TC room
3.0c.10 Cabling, hook‐up of El. Cable from LER LV switchgear to Field Instr (i.e. PT, TT & Ultrasonic
Flowmeter, and remote Junction box)
3.0c.11 Cabling, hook‐up of El. and instr. Cables from LER LV switchgear to WHCP
3.0c.12 Cabling, hook‐up of CP
3.0d Mechanical Completion dossier
3.0d.01 Mechanical/Civil/Field Instr. And cables $70,163.12
3.0d.02 LER
3.0e Final Mechanical Hook‐up and tie‐ins $74,246.68
4.0 PRE‐COMMISSIONING, COMMISSIONING AND START UP
4.0a Mechanical Pre‐commissioning $21,213.34
4.0b Instrument calibration $10,606.67
4.0c Electrical Pre commissioning
4.0c.01 $4,242.67
Earthing ‐ testing of earth electrodes, earthing groundbeds,
system earthing, including bonding of all electrical equipment, skids and structure`
4.0c.02 Pre commissioning for Field Instruments (PT, TT, FM, FOC etc..)‐ Megger test and OTDR
4.0c.03 Electrical Pre commissioning for LER and its equipments (HVAC, F&G, LV Switchgears, UPS
and batteries)
4.0c.04 Electrical Pre commissioning for external equipment installed by Contractor or by Other and
fed by LER (WHCP)
4.0c.05 Cathodic Protection pre‐commissioning $2,121.33
4.0d COMMISSIONING & START‐UP
4.0d.01 Mechanical $26,516.67
4.0d.02 LER