HVAC Fix Classification

High-rise buildings

sameersnetwork MEP Learnings support@meplearnings.com


What is HVAC fix classification?

HVAC works are distributed as per site progress.

In other words, what should be done first, what second and


what third inline with other civil/architect activities.

Based on this classifications, HVAC activities to be planned


for manpower, procurement and progress of the project.

sameersnetwork MEP Learnings support@meplearnings.com 2


HVAC Fix classification

Third / Final
First Fix Second Fix
Fix

sameersnetwork MEP Learnings support@meplearnings.com 3


HVAC Fix classification - Stages

First Fix Second Fix Final Fix


Starts at foundation Comprises all the Comprises of
stage to putting work after the installation of
plaster on the internal plastering to a sensitive electronic
walls finished house equipment to be
installed only when a
construction site is
dust-controlled
(dust-free condition)

sameersnetwork MEP Learnings support@meplearnings.com 4


First Fix

Typical Floor

● Duct Hangers and Supports


● Chilled Water Pipe Hangers and Supports

sameersnetwork MEP Learnings support@meplearnings.com 5


Second Fix

Typical Floor

● Ducting Installation - Supply, Return, Fresh and Extract ● Pipe Connections to FCU
● Dampers Installation - Volume Control, Fire and Smoke ● Bends, Droppers, and Mouthpiece
● Duct Risers
● Duct Insulation
● Chilled Water Piping
● Chilled Water Pipe Riser
● Chilled Water Pipe Test
● Chilled Water Pipe Insulation
● FCU Installation

sameersnetwork MEP Learnings support@meplearnings.com 6


Second Fix

Basement Floor/Mechanical Floor

● Chillers Installation
● Staircase Pressure Fan Installation
● Garbage Exhaust Fan Installation
● Chilled Water Pump Installation
● Expansion Tank & Pressure Unit Installation
● Chemical Dosing Plant Installation
● FAHU Installation
● Duct Connection to FAHU
● Pipe Connection to FAHU

sameersnetwork MEP Learnings support@meplearnings.com 7


Final Fix

Typical Floor

● Kitchen Exhaust Fan Fixing


● Ceiling Diffuser Fixing
● Grille & Linear Fixing
● Thermostat Fixing

sameersnetwork MEP Learnings support@meplearnings.com 8


Testing & Pre-Commissioning

Building

● Pre-commissioning of chilled water pumps


● Water circulation in system and drain
● Pre-commissioning FAHU’s
● Cleaning of all filters and strainers
● Pre-commissioning of pressurization fans
● Prelim. Adjusting and balancing of valves
● Refilling of water - witness by Engineer

sameersnetwork MEP Learnings support@meplearnings.com 9


Commissioning & Handover

Building

● Testing and commissioning of chilled water pumps


● Testing and commissioning of FAHU’s
● Testing and commissioning of FCU’s
● Air balancing of FAHU
● Air balancing - supply and return grills
● Water balancing - FCU
● Balancing air from pressurization fans
● Water balancing - FAHU
● Valves adjustment

sameersnetwork MEP Learnings support@meplearnings.com 10


Click here to join our telegram group

Premium Material Learn New Concepts Meet the industry Meet and network
with case studies Every Month leaders with other MEP
professionals

sameersnetwork MEP Learnings support@meplearnings.com 11

You might also like