This work permit document provides details for work to be conducted by Shiseido Philippines Corp. at unit 8101 from January 25 to January 31, 2023 from 9pm to 10am daily. The work includes visual installation, merchandising, and installation of platforms and canopies. It lists 13 workers who will handle merchandising, POS setup, stocks, and branding. Materials needed include carpets, stickers, fixtures, and tools like carpentry tools, electrical tools, ladders, and laptops. The work was prepared by Mark Anthony Samonte and approved by the Mitsukoshi Administration Office.
This work permit document provides details for work to be conducted by Shiseido Philippines Corp. at unit 8101 from January 25 to January 31, 2023 from 9pm to 10am daily. The work includes visual installation, merchandising, and installation of platforms and canopies. It lists 13 workers who will handle merchandising, POS setup, stocks, and branding. Materials needed include carpets, stickers, fixtures, and tools like carpentry tools, electrical tools, ladders, and laptops. The work was prepared by Mark Anthony Samonte and approved by the Mitsukoshi Administration Office.
This work permit document provides details for work to be conducted by Shiseido Philippines Corp. at unit 8101 from January 25 to January 31, 2023 from 9pm to 10am daily. The work includes visual installation, merchandising, and installation of platforms and canopies. It lists 13 workers who will handle merchandising, POS setup, stocks, and branding. Materials needed include carpets, stickers, fixtures, and tools like carpentry tools, electrical tools, ladders, and laptops. The work was prepared by Mark Anthony Samonte and approved by the Mitsukoshi Administration Office.
This work permit document provides details for work to be conducted by Shiseido Philippines Corp. at unit 8101 from January 25 to January 31, 2023 from 9pm to 10am daily. The work includes visual installation, merchandising, and installation of platforms and canopies. It lists 13 workers who will handle merchandising, POS setup, stocks, and branding. Materials needed include carpets, stickers, fixtures, and tools like carpentry tools, electrical tools, ladders, and laptops. The work was prepared by Mark Anthony Samonte and approved by the Mitsukoshi Administration Office.
Nature of Work Name of Occupant/Tenant Shiseido Philippines Corp. Airconditioning Unit No. 8101 Plumbing Floor Ground floor X Civil / Carpentry / Painting Name of Contractor Red Dot Design, Dot&Pix, Shiseido X Electrical Philippines Name of Person in Charge Mechanical Mark Anthony Samonte Telephone no. X Others, pls specify 09164722725 Visual Installation Work Schedule Merchandising Start End Installation of platform, Date: January 25, 2023 Date: January 31, 2023 canopy Time: 9:00pm Time: 10:00 am
LIST OF WORKERS / PERSONNEL
NAMES WORK DESCRIPTION Mark Anthony Samonte VMD Merchandising, Ingress Jenalyn King VMD Merchandising, Ingress Ley Sillote VMD Merchandising, Ingress Jovelyn Rivera Merchandising and stocks Karen Cruz Merchandising and stocks Froilan Ongkeco POS setup Jessica Villapando Merchandising and stocks Prezia Gemzon Head Office Nerilyn Sulayao Merchandising and stocks Jean Carla Pastor Brand Team Aloysia Grey Brand Team Barbara Cue Brand Team Red Dot Design Team (see separate list) contractor