Pre-Occupancy FELS Checklist - MMC
Pre-Occupancy FELS Checklist - MMC
Pre-Occupancy FELS Checklist - MMC
136 135 1
1 Statutory Compliance 8 7 1
2 Construction 20 20 0
6 Egress Management 23 23 0
7 Infrastructure 21 21 0
90%
80%
70%
60%
50%
% Compliance
40%
30%
20%
10%
% Complianc
40%
30%
20%
10%
0%
e on m m s
i a nc cti ste ste Ga
pl u y y g
m ns
tr
n
S
n
S
okin
Co C o tio tio Co
ry ec te
c
to r ot D e n
&
u P he
at e e c
St Fir Fir Ki
t E
ARY
Compliance
% of
Non- % of Overall Summary
Compliance Non-
Compliance Compliance
Compliance
Compliance Non-Compliance
90 45 67% 33%
dit Compliance
% of
Non- % of
Compliance Non-
Compliance Compliance
Compliance
33
6 1 86% 14% %
12 8 60% 40%
67
33 12 73% 27% %
6 4 60% 40%
5 4 56% 44%
15 8 65% 35%
13 8 62% 38%
Audit Compliance
m s t re
Ga en tu
g em c
kin ag tru
o an as
Co In
fr
& sM
he
n r es
tc Eg
Ki
Overall Summary
pliance Non-Compliance
67
%
Sr. No. Check Items Compliance
Statutory Compliance
1 Is a Fire NOC available from fire department of the state? Yes
2 Is a structural stability certificate available for the facility? Is stability testing
carried out on a periodical basis? Yes
3 Are the electrical installations periodically inspected and tested at intervals
not exceeding five years by the Electrical Inspector? Yes
4 If the building height is 30 m or greater and is located in 20 km of the
aerodrome reference point, is a No Objection Certificate has been obtained No
from the Directorate General of Civil Aviation?
5 Does the site has a license from authorities (PESO) to store flammable/toxic
gases if the storage quantities exceed below limits (if applicable) :
1. Liquefied petroleum gas (LPG) when the total quantity of gas exceeding
100 kg at a time
2. Any other flammable but non-toxic gas when the total number of
cylinders containing such gas exceeding 25 or the total weight of gas
exceeds 200 kg.
6 Is license as per PESO rules available for storage as per any of the following
conditions applicable:
Not
Applicable
Sr. No. Check Items Compliance
General Construction Requirements
1 Is the width of main entrance greater than 6 m?
Yes
2 If an arch or covered gate is constructed (main entrance to plot), is a clear
head-room of more than 5 m available? Yes
3 Are the internal roads available on all sides of the building with a width of
minimum 6 m? Is the road kept free of obstruction? Yes
4 Is a turning radius of 9 m provided for fire tender movement?
No
5 Is the building complex provided with compound wall of height 1.5 m?
No
6 Are load bearing elements, stairways and corridors constructed from non-
combustible materials? No
7 Whether the glass facade for the buildings, etc. is of minimum 1 h fire
resistance rating? No
8 Whether the building has avoided the use of ACP sheet on the exterior
surfaces? If no, whether the ACP sheet is compliant with ASTM E-84 (rated Yes
as Class A) and ASTM E-119 (rated for 2 hours) standards?
9 Are sprinklers provided for areas with combustible construction (like façade
sprinklers or water curtain on the glass facade)? Yes
Refuge Area
10 For buildings higher than 24 m, is a refuge area of 15 sq. m or an area
equivalent to 0.3 sq. m per person (whichever is higher) provided?
16 Whether 1-hour fire rated door is provided for the other services (e.g..
plumbing)? No
(If it is wooden door, please check the wooden door is painted with fire
retardant paint and to be ensured that doors are smoke tight)
17 Whether 4-hour rated construction provided for dry-type transformers
housed inside the building? No
18 For rooms housing flammable liquids, are the rooms provided with 2- hour
fire rated door?
Are signs provided on each side of the door stating 'FIREDOOR — KEEP No
CLOSED' in block letters?
19 Are the door widths of the emergency exit doors atleast 1.5 m and 2 m in
height? No
20 Are vertical and horizontal penetrations in the electrical rooms and shafts
are adequately fire-sealed? Yes
Existing Condition
Opportunities for Improvement (OFI)
Yes
No
Not
Applicable
Sr. No. Check Items Compliance
Fire Protection System
1 Is the design basis (layout, plans, calculations) of the fire protection system
available and maintained at facility? Yes
2 Is a fire hydrant system available at the facility? (comprising of internal
hydrant, yard hydrant, hose reels etc.) Yes
3 Is automatic sprinkler protection provided throughout all the floors
including the basement floors? Yes
4 Are dedicated fire pumps available to cater to water based fire protection
system (separate hydrant and sprinkler pumps)? Yes
5 Are the fire pumps on auto-on and manual-off mode?
No
6 Are Jockey pumps available to maintain system pressure?
No
7 Is a diesel engine driven pump-set available as stand-by for the main
electric fire pump? No
8 Is the diesel day tank adequately designed to support at least 4 hours
operation of the pump? No
9 Whether the day tanks are provided with glass level indicators (with
mechanical protection) or any mechanical level indicator? Yes
10 Is a containment
(PVC provided
level indicators for the
are prone dieseland
to wear daytear
tankover
(diesel engine
period driven
of time andfire Yes
11 pump)
could
Are toset
dual
leadarrest the leak)
toofdiesel leakages
cranking or spillages?
batteries (connected in parallel) provided for the
diesel engine driven fire pump? Yes
12 Is a Non-Return Valve (NRV) provided between the hydrant and sprinkler
connections on the delivery header? Yes
13 Are the details of pressure settings of all pumps and single line diagram of
fire pumps displayed in the pump room? Yes
14 When supplementary terrace tanks are provided, are they equipped with
booster pumps? Yes
15 Whether the fire pump room is provided with electric supply independent Yes
16 of
Is aalldedicated
other equipment in the
water tank premises
available (even
for the firewhen the power
protection through-out
system?
the entire premises is switched off, the supply to the pump remains Yes
uninterrupted.)?
17 Are low water level alarms present for the fire tanks? Yes
18 Is the fire water storage at site is capable of minimum 1-hr. fire fighting
demand (hydrant + sprinkler combined)? Yes
19 Are all isolation valves are including the valves in fire pump house chain-
locked in their normal (Open/Closed) position? Yes
20 Are all supervisory signals from the fire pump house are notified on the
main alarm panel or in the BMS Room? Yes
21 Whether emergency lights are available in the fire pump room and are
functional? No
22 Are the fire protection water pipeline network is free from corrosion and
leakages? No
23 Are the yard hydrant posts easily accessible (no obstructions like storage of
goods or parking of car etc.)? No
24 Are the yard hydrant posts observed to be free from corrosion and
leakages? No
25 Is hydrant point or hose reel provided in the staircase landing of each floor?
Yes
26 Are signage provided for Fire Hose Reels? Yes
27 Whether the hydrant hose boxes provided with hoses, nozzles? Yes
28 Whether a hammer (to break the glass) or a key is available to access the
hose box in case of emergency? Yes
29 Is the pressure at hydraulically most remote hydrant point more than 3.5
bar? Yes
30 Whether the gong bells are available and working? Yes
31 Whether flow switches and Inspector's Test Connections (ITC) provided for
sprinkler system? Yes
32 Is a sprinkler control valve provided on all the floors? Yes
33 Are sprinklers provided above false ceiling if gap exceeds 800 mm? Yes
34 Whether the sprinkler bulb head are in good condition (head not bent,
painted, projected fully from false ceiling, corrosion, depositions)? Yes
35 Is automatic sprinkler protection provided for the fire pump house? Yes
Portable fire extinguishers & Sand Buckets
36 Are ABC type fire extinguishers provided in common areas and CO2/ABC
type extinguishers provided in electrical areas? Yes
37 Are portable fire extinguishers and sand buckets provided for rooms
housing electrical rooms like transformer yard, panel rooms? Yes
38 For Stationary LPG cylinder installations up to 320 kg, whether two 10 Kg's
ABC type extinguishers, two sand buckets and two water buckets are No
provided?
39 For Stationary LPG cylinder installations above 320 kg up to 1,000 kg,
whether two 10 kg ABC type extinguishers, two sand buckets and two No
water buckets are provided?
40 Are signage provided for the fire extinguishers? No
41 Are the fire extinguishers firmly affixed to wall or placed on a trolley? No
42 Whether an additional 10% of fire extinguishers maintained at the facility
as spares? Yes
43 Are weather protection covers provided for the fire extinguishers in open
areas? Yes
44 Are sand buckets provided for electrical rooms like transformer yard, panel
rooms? Yes
45 Are the sand buckets filled with sand and is the sand dry? Yes
Existing Condition
Opportunities for Improvement (OFI)
Yes
No
Not
Applicable
Sr. No. Check Items Compliance
Fire Detection System
1 Is an automatic detection system available throughout the facility? Yes
2 Whether the automatic detector spacing meet the below requirement of IS
2189?
3 Are voids (as in false ceiling flooring more) than 800 mm provided with
detectors with spacing like in normal installation? No
4 Are response indicators provided for detectors in false ceiling and raised
flooring? No
5 Are manual call points (MCP) provided throughout the facility? No
6 Are the MCPs preferably located near the exit doors and near to entry
staircases? Are the these easily accessible and kept free from any Yes
obstructions?
7 Are signage available for MCP? Yes
8 Are sounders placed in conspicuous locations, ensuring alarm reaches all
the areas? Yes
9 Is stand-by power provided for fire and life safety systems (at least 8 hrs.)?
Yes
10 Are all the occupants provided with independent fire alarm panels? Are
these alarm panels linked to the main alarm panel of the building? Yes
Existing Condition
Opportunities for Improvement (OFI)
Yes
No
Not
Applicable
Sr. No. Check Items Compliance
Kitchen & Cooking Gas
1 Is the Gas Bank area adequately guarded and is locked to prevent
unauthorized access? Yes
2 Whether each building is provided with gas shut-off valves and a main shut-
off valves at the main incomer point (or LPG Gas Bank)? Yes
3 Is there an Earthquake Actuated Automatic Gas Shutoff Valve (also known
as Seismic Gas Shutoff Valve) available at the supply side to each individual
building utilizing fuel gas?
No
(Applicable if the building lies in earthquake zone of 250-year or less - as
per FM Global Datasheet 1-2)
4 Is the LPG Bank protected with high velocity water spray system?
No
5 Are gas leak detectors provided in storage and end-use areas? Are the
alarms generated on panels which are in constantly attended locations? No
6 Is the automatic detection system (gas/smoke/heat) in kitchen areas
interlocked to shut-off gas-supply to cooking equipment in case of alarm? No
7 Are Class K type fire extinguishers provided in the kitchens?
Yes
8 Are the kitchen hoods equipped with approved automatic wet chemical
suppression systems? Yes
(check for 'UL 300' Listing)
9 Are rubber caps (also known as blow-off caps) provided for suppression
system's nozzle? Yes
Existing Condition
Opportunities for Improvement (OFI)
Yes
No
Not
Applicable
Sr. No. Check Items Compliance
Exit Pathway, Staircases & Emergency Lights
1 Whether the exit doorways open outwards (away from the room)? Yes
2 Are emergency exit & exit directional signage provided in exit ways ? Yes
3 Are the signage are of self-illuminating type or supported by external
illumination? Yes
4 Are the doorways, corridors, passageway to an internal staircase or
external staircase are free from obstructions or impediments? Yes
5 Are the staircases constructed of non-combustible materials and have no
combustible materials used for decoration/wall paneling? No
6 In the emergency exit staircases, whether signs depicting the floor no.
available on each floor landing? No
7 Are assembly points identified and demarcated? No
8 Whether emergency lights are provided in the facility? Whether these
lights cover at least the following locations:
Are the words 'Fire Lift' conspicuously displayed for all such lifts on all the Yes
floors?
14 Do the fire lifts return to evacuation floor upon receiving a signal from fire
alarm panel? Yes
15 Are grounding switches available, to bring all the lifts (including the
occupant lifts) to evacuation floor at the ground floor level?
16 Are all the lifts equipped with emergency telephone, emergency lights and
adequate ventilation means? Yes
Life Safety and Emergency Management System
17 Are framed plans/layouts showing the location of fire extinguishers, means
of access and other useful information displayed at suitable places on each
floor and prominent places like security gate or the reception office? Yes
(A matrix which shows the activation of various life safety systems like
pressurization, alarms etc. upon triggering of fire detection system) No
Not
Applicable
Sr. No. Check Items Compliance
Utilities (HVAC, Diesel Generators, Transformers)
1 Are separate air handling units (AHU) provided for the individual floors?
Yes
2 If AHUs circulating air to more than one floor or fire area are provided, are
the below arrangements are available:
3 Are the HVAC (Heating, Ventilation and Air Conditioning) layouts readily
available with the team? No
4 Are non-combustible insulating materials used on the air handling ducts,
chilled water pipelines? No
5 Are Diesel Generators provided in the facility? Are the Diesel Generators
capable to cater the entire load of the facility? No
6 Is a containment provided for the diesel day tank to control the leakages or
spillages for the diesel day tank of the diesel generators? Yes
7 For building complex with oil type transformer, is the transformer located
in a suitably fenced and locked enclosure separated on all sides by at least Yes
6 m from any building including substation?
8 If the transformers are within 6 m of doors and window openings of the
buildings, then the openings are protected by fire rated doors and windows Yes
(2 hour fire rating)?
9 For the following oil capacities of individual transformer, whether a
separation distance as mentioned below maintained?
17 Whether all panels are locked, and all indicators and other measuring
instruments are functional? Yes
18 Is any fire suppression systems or in-panel suppression system provided for
the electrical panels? Yes
19 Are insulating mats provided in front of the distribution boards/panels? Yes
20 Whether lightning arrestors available for the buildings? Yes
21 Is a design study available at the facility highlighting the coverage of the
lightning arrestors? Yes
Existing Condition
Opportunities for Improvement (OFI)
Yes
No
Not
Applicable