000 NOTES
B C D E
1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.
(6+6) - Y10 AT 125 C/C 1863 1863 1863 1863
650
B2 2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/ SEC.
HOOP BAR & BTM Y8 AT 125 C/C 3. GRADE OF MATERIAL -
13 16 IL115.350 3.1 USE OF CONCRETE M25 FOR THE STAGING AND FOUNDATION (GET THE MIX
HOOP BAR 1000mm Balcony Slab
Y8 AT 125 C/C DESIGN APPROVED BY ENGINEER-IN-CHARGE BEFORE EXECUTION)
650
499
RADIAL BAR AT TOP
3.2 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
Y8 AT 70 C/C B/W
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5% AND
1 ISA 50X50X6 POSTS
R372
3226
AS PER FABRICATOR ASSUMED TANK DIA. Ø 7.450M B1 78.48KN/m2 AT 2.0 M DEPTH.
4050
B1
3850
2550
5
Y8 AT 190 C/C B/W 5. FOUNDATION SHALL BE REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK
0
95 COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
R3 EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
150
RAILING CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
3 EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
IL116.000 B2 Y10 AT 150 C/C CONSULTANT AND ENGINEER-IN-CHARGE.
SQ. MESH (IN BTM) 6. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
IL115.350 CUTOUT FOR INLET OUTLET 1000
OVERFLOW & DRAIN CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
B1
3226
B1 CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
650
ISA 50X50X6 POSTS Y10 AT 150 C/C EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
650
B/W (IN TOP) SECTION 16-16 Y8 AT 70 C/C B/W ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
IL111.500 DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
B1 15
450
3 - Ø20 G.I. 7. PROPER STORM WATER DRAINAGE SYSTEM IT BE MAINTAINED AT SITE AND
3850
BR
PIPE RAILING 4 IL111.050 SURROUNDING AREA TO AVOID LOCALIZED TEMPORARY WATER TABLE EFFECT.
450
5 8. ALL OPENINGS AND CUTOUTS IN SLAB SHALL BE LEFT AS PER DRAWING NO
650
OPENING/ CUTOUT SHALL BE MADE ONCE CONCRETE IS CAST AND SHALL BE
499
Y8 AT 70 C/C B/W VERIFIED BY ENGINEER-IN-CHARGE.
9. STRUCTURAL DESIGNER IS NOT RESPONSIBLE ANY DEVIATION ON SITE WITH
IL111.500
13 15 1000mm Balcony Slab RESPECT TO THIS DRAWING AND UNWANTED ACCIDENT IN ANY CASE.
450
150
IL111.050 VERIFICATION OF REINFORCEMENT ON SITE WILL BE PROVIDED IF
3850
2550
Y10 AT 150 C/C (IN TOP) (B/W) Y10 AT 150 C/C (IN TOP) (B/W) 11. CORRELATE ALL LEVELS, OPENING CLEAR DIMENSION WITH DRAWING ANY
3850
Y8 AT 125 C/C (IN TOP) (B/W) Y8 AT 190 C/C B/W AMBIGUITY SHALL BE BROUGHT TO THE NOTICE OF DESIGNER BEFORE
SECTION 15-15
200
300 300 300 EXECUTION.
12. DEVELOPMENT LENGTH -
BRACE BEAM 12.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
650
650
650
300X450 (TYP.) 12.2 VERTICAL AND OTHER = 50 DB
IL107.200
150
450
650
Y8 AT 70 C/C B/W 15. NOT MORE THAN 50 % OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
IL107.200 SECTION.
SECTION 13-13 16. FOR NUMBER OF BAR ROUND UP THE VALUE UP TO NEAREST DIGIT WITH
450
3850
650
450 450 Y8 AT 70 C/C B/W
BRACE BEAM GL 100.000
300X450 (TYP.) CENTERING
IL102.900
HOOP-4-16 (TH.)
450
3900.8 (ARC) 18. THE CENTERING FOR STRUCTURAL MEMBERS SHALL NOT BE REMOVED
IL102.450
3850
2550
3800
650
650
650
11 12 18.2 BEAMS SOFIT: WITH PROPES LEFT UNDER 7 DAYS.
IL100.000 GL100.000 18.3 COLUMN: 24 HOURS.
18.4 VERTICAL SIDE OF BEAMS: 48 HOURS. THE NUMBER OF PROPES & THEIR
SIZES SHALL BE SUCH THAT SO AS TO ABLE TO CARRY THE FULL DEAD LOAD
PLINTH PROTECTION
IL 98.650 HOOP-4-Y16 (TH.) OF STRUCTURAL MEMBERS & ALSO THE LOAD DUE TO THE CONCRETING &
300 300 300 300 OTHER CONSTRUCTION OPERATION. SITE-IN-CHARGE WILL BE FULL
IL 98.000 SECTION 11-11 RESPONSIBLE FOR THE SAME.
LEGENDS
ELEVATION A-A HOOP-4-Y16 (TH.)
650
11 12 I E/F EACH FACE V SB STAIR BEAM
Y8 AT 70 C/C B/W
14 (HOOPS) Y8 AT 100C/C (OUTSIDE)
4 - Y16 (TH.)
13 (HOOPS) Y8 AT 100C/C (INSIDE)
450
1863 1863 1863 1863
RAFT BEAM RB-3 (450X650) (M-25) BR
IL102.450 III R/F REINFORCEMENT VII TB TIE BEAM
650
650
GL100.000 Y8 AT 70 C/C B/W
499
CLEAR COVER
CENTERLINE OF COLUMN
188 - Y10 AT 125C/C
SECTION 12-12
5
R395
72
2500
3800
IV BTM SURFACE OF BTM SLAB 30 X STAIRCASE WAIST SLAB 25
3226
R3
R53
IL 100.000
2000
3 14
RB - 3 450X650
M/S VINDHYA TELELINKS LIMITED
14 R23
0 0
INNER PROJECTION -13 Y8 AT 100 C/C HOOPS GAJA ENGINEERING PVT.LTD JV
OUTER PROJECTION - 14- Y8 AT 100 C/C HOOPS
3226
650
EXECUTIVE DIRECTOR
CLIENT : AGENCY : IVPS INFRA PVT. LTD.
STATE WATER & SANITATION MISSION HAMAMI GANGE & RURAL WATER SUPPLY
188 - Y10 AT 125C/C RADIAL BARS IL 98.650 Y8 AT 70 C/C B/W DEPARTMENT GOVERNMENT OF UTTAR PRADESH LUKHNOW UTTAR PRADESH 13/123, Manash Nagar, Bara, Rewa (M.P.)
650
226501
DETAIL AS PER
425
SECTION 14-14 DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
100 250
GENERAL PLAN OF RAFT SLAB (IL 98.00) 1. COLUMN (CI) (M-25) Y8 AT 190 C/C Y8 AT 70 C/C IL 98.000 IL 116.000
UPTO 650
450