Jabalpur
No. GW.BRGW.128/Pvt Sdg/HIMB Date: 22.03.2023
Sr.DEN/Co/JBP, Sr.DEE/TRD/JBP
Sr.DCM/JBP, Sr.DSTE/Co/JBP
Sr.DME/Co/JBP
Copy to:
CTPM/WCR, for kind information please
DRM/JBP, for kind information please
HINDALCO INDUSTRIES LIMITED.
(Unit: Mahan Aluminium),
PROJECT REPORT
MARCH - 2023
INDEX
Ch. PAGE
DESCRIPTION
No. NO.
1 INTRODUCTION 2–5
7 COST ESTIMATE 31 - 45
ANNEXURES
-------------------------------------------------------------------------- 1
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 1
_____________________________________________________________________________________________________________________________ _______
INTRODUCTION
-------------------------------------------------------------------------- 2
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER – I
INTRODUCTION
1.1.4 Hindalco has been accorded Star Trading House status in India. Its
aluminium is accepted for delivery under the High-Grade Aluminium
Contract on the London Metal Exchange (LME), while its copper
quality is also registered on the LME with Grade A accreditation.
-------------------------------------------------------------------------- 3
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
1.2.3 To cater for the traffic needs of Mahan unit, M/s HIL has constructed
a private Railway siding, taking off from Bargawan Railway station,
situated on Katni-Singrauli main line section. The station is under
jurisdiction of Jabalpur Division of West Central Railway (WCR).
1.2.4 The in-plant yard of existing siding is having a tippler yard for handling
of inward bulk commodities to serve the power plant and a smelter
yard for handling of inward alumina & coke required for smelter units.
1.2.5 The existing yard to serve TPP of Mahan unit is having 2 nos. wagon
tippler. Each wagon tippler is facilitated with 3 nos. full length lines for
load reception, empty dispatch for engine escape line at pre-
tippling end as well as full length post-tippling line.
1.2.6 The lead line for Smelter yard takes-off at the entry of pre-tippling
lines and is provided after the post-tippling lines.
1.2.8 In addition, M/s HIL wish to construct suitable rail infrastructure at in-
plant yard for dispatch of outward fly ash from their TPP by rail, as
dispatch of entire ash generated from the plant by road through
bulkers is difficult. Accordingly, M/s HIL has proposed to construct
dedicated ash loading line at in-plant yard near ash pond area, for
loading of bagged / bulk fly ash by Rail in open rakes, after
unloading of inward coal rakes.
-------------------------------------------------------------------------- 4
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
1.3.3 Based on the plan finalized by M/s HIL for proposed augmentation in-
plant yard, this Feasibility Report has been prepared which discusses
about the techno-commercial parameters in connection with
proposed augmentation of in-plant yard of existing railway siding at
Mahan unit of M/s HIL.
-------------------------------------------------------------------------- 5
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 2
____________________________________________________________________________________________________________________ ________________
TRAFFIC PROJECTION
-------------------------------------------------------------------------- 6
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 2
TRAFFIC PROJECTION
2.1 The existing siding and in plant yard of M/s HIL is designed to cater the
present traffic of incoming & outgoing rakes.
2.2 The inward rail traffic for the existing smelter and power plant at
Mahan aluminium are coal, coke and alumina whereas outward
traffic from the siding is aluminium ingots.
2.3 Coal to the tune of 5.5 MTPA is required for M/s HIL plant. Thus, about 4
rakes per day of coal on average are required for the plant. Out of
total requirement of the coal, 70% is fulfilled from Indigenous coal and
balance 30% by import. The indigenous coal for the project has been
sourced from coal mines in Jharkhand state & partly from SECL mines
situated in Chhattisgarh state.
2.4 Alumina, the major raw material for the smelting operation, is sourced
from Hindalco’s Utkal and Muri alumina refineries in Jharkhand state
whereas Pit coke for the project is received from Raigada in Orissa.
2.5 The finished products from plant are loaded from the cast house area
and are transported to various parts of the country through the Indian
railways network.
2.6 The following tables give the details of the present rail traffic from the
Private Siding of M/s HIL:
-------------------------------------------------------------------------- 7
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
Type of Approx.
Sr. Qty
MATERIAL Wagon Rakes Source/ Destination
No (In MTPA)
/Month
INWARD COMMODITIES
Hindalco’s Utkal and
1. Alumina BTAP 6.86 21 Muri alumina
refineries
Various CPC
2. CP Coke BOXN / 0.96 03 producers within the
BCN country
Total
46
Receipt
OUTWARD COMMODITIES
Total
13
Dispatch
Total Traffic 59
-------------------------------------------------------------------------- 8
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
2.8 The present quantum of inward traffic of alumina, coal, CP coke and
outward finished products shall be continued. After completion of
proposed Phase-2 work, the dispatch of fly ash will be increased to
about 150 rakes per years.
-------------------------------------------------------------------------- 9
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 3
____________________________________________________________________________________________________________________________________
-------------------------------------------------------------------------- 10
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 3
3.1.5 The line No.1 & 5 is facilitated with a rail level passenger
platform of size 600M x 12.74m.
3.1.6 The existing siding of M/s HIL takes-off from Line No.1 of station
yard at Singrauli end through a 1 in 8 ½ turnout at Ch:186.950M.
The Railway siding further proceeds towards Mahan Aluminium
plant as single line alignment and enters within the plant
premises at Ch:.2825.0M F/CSB of BRGW station.
-------------------------------------------------------------------------- 11
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
3.1.7 The in-plant yard of existing siding is having a tippler yard for
handling of inward coal to serve the power plant and a smelter
yard for handling of inward alumina & coke required for smelter
units as well as for outward finished products.
3.1.8 The in-plant yard of M/s HIL starts from Ch:2523.68M, from where
3 nos. feeder lines runs parallelly towards the in-plant yard. Out
of this, 2 feeder lines proceeds to serve TPP yard having wagon
tipplers whereas 3rd feeder line proceeds towards Smelter yard.
3.1.9.3 A by-pass line has been provided for each wagon tippler, duly
connected with post-tippling line and dispatch line. This
arrangement facilitates dispatch of empty rakes, after tippling,
through dispatch line by-passing wagon tippler and reception
line.
-------------------------------------------------------------------------- 12
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
3.1.9.5 The reception line and engine escape line are kept as fully
wired to facilitate reception of inward loaded rakes on
reception i.e. pre-tippling line with Railway loco and further
escape of railway loco through engine escape line. The post-
tippling line from wagon tippler is kept as unwired. In addition,
dispatch line is also kept as top wired. However, dispatch line for
Wagon tippler-1 is kept as fully wired to facilitate reversal
operations through dispatch line, in case of bunching at tippler
yard.
3.1.9.8 The TPP yard is also having 2 nos. short loops, namely brake van
loop and reversal loop, each with CSR of 50M. A shunting neck
of 60M is also provided after merging of these short loops to
facilitate reversal of loco along with brake van.The entire yard
having short siding and loops is kept as unwired.
-------------------------------------------------------------------------- 13
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
3.1.10.3 The Smelter yard is having 6 nos. full length lines for handling of
inward Pet coke, Alumina and outward finished products. In
addition, 2 nos. short sidings namely line no. 9 & 10 are also
provided adjoining to handling lines, for stabling, fueling and
maintenance of plant locomotives. The line no.10 is equipped
with a loco shed of size 50M x 8M. Both the loco lines are inter-
connected at plant end are having a shunting neck of 40M at
plant end.
-------------------------------------------------------------------------- 14
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
3.1.10.6 In addition, the line no.1 is also utilized for loading of outward
finished products and is having 275m long platform at BRGW
end, to carry out loading of container.
3.1.10.7 The Line no.5 is having a platform of size 700M x 15.64M with
covered shed adjoining to it, for carrying out unloading of
inward pet coke.
3.1.10.10 The feeder line is having wiring upto Ch:4275.0 from take-off
point at Ch:2523.68M. Further, the entire smelter yard is kept as
unwired.
3.1.11 The entire in-plant yard is kept as non-interlocked and all points
within the yard are hand operated points.
-------------------------------------------------------------------------- 15
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 4
____________________________________________________________________________________________________________________________________
-------------------------------------------------------------------------- 16
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 4
-------------------------------------------------------------------------- 17
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
4.2.2 The lead line for Smelter yard is having CSR of 2389M and OHE
has been provided over the line for a length of about 1800M
from take-off point of smelter yard feeder line. However, the
feeder line doesn’t have connectivity with existing adjoining
lines. In view of completed electrification work, all rakes for
smelter yard are first received into existing dispatch lines of
Wagon tippler-2 and then after loco reversal, rakes are placed
into feeder line of smelter yard by pushing after carrying our
necessary shunting operations. This leads to involvement of nos.
of shunting operations for placement of rakes into smelter yard.
As such, it is planned to provide a new cross-over from
Ch:4055.49M to Ch:4209.586M between dispatch line of WT-2
and lead line of smelter yard. This cross-over shall be provided
with OHE. As the dispatch line is fully wired and feeder line of
smelter yard line is also having electrification upto Ch:4370M,
provision of this cross-over will facilitate reception of rake into
feeder line directly with electric loco and further reversal of loco
through dispatch line of WT-2.
-------------------------------------------------------------------------- 18
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------------------------------------------- 19
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
4.3.5 All above said rail facilities to carry out loading of fly ash shall be
developed as Phase-2 work
-------------------------------------------------------------------------- 20
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 5
_____________________________________________________________________________________________________________________________ _______
PROJECT ENGINEERING
-------------------------------------------------------------------------- 21
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 5
PROJECT ENGINEERING
5.1.4 CURVES
Limiting degree of curvature has been kept at 7.0 degrees. Check
Rails shall be provided for curves of above 5 degrees, as per the
Railway’s practice.
5.1.5 GRADIENT
The new track will be provided with minimum stabling grade of 1 in
400. However, proposed track wherever running adjoining to existing
track shall be having similar grade with adjoining existing yard lines.
-------------------------------------------------------------------------- 22
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
5.1.6 BRIDGES
No new bridges will be constructed in the proposed project. As the
new lines to be provided at in-plant yard for carrying our ash loading
will involve formation in cutting, suitable drainage arrangement shall
be provided to avoid water logging.
-------------------------------------------------------------------------- 23
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
beyond take-off point, is non-interlocked and all points within the in-
plant yard are hand operated points.
5.3.2 All new lines and cross-overs proposed at in-plant yard shall be kept
as unwired, except proposed cross-over between smelter yard
feeder line and WT-2 dispatch line from Ch:4055.49M and
Ch;4209.586M.
5.3.3 Suitable illumination facilities are provided within the In-plant yard
area and approach roads. The general electrical work such as
search lights and other streetlight etc. for illumination purpose will be
provided for proposed ash loading yard.
-------------------------------------------------------------------------- 24
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 6
____________________________________________________________________________________________________________________________________
SYSTEM OF OPERATION
-------------------------------------------------------------------------- 25
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 6
SYSTEM OF OPERATION
6.1 GENERAL
6.1.1 Bargawan station (BRGW) is the serving railhead for reception and
dispatch of trains to & from the Private siding for Mahan Aluminium
unit of M/s HIL.
6.1.2 The movement of trains to & from the siding is controlled from the
central panel at BRGW station. The take-off points along with isolation
point & relevant signals for entry & exit is integrated with existing
signaling system.
6.1.3 The placement and drawn out of inward and outward rakes in the
siding are undertaken by Railway locomotive. Further, necessary
shunting operations for placement of empties/loads over respective
handling line except wagon tippler yard, formation of empty/loaded
formation over dispatch lines, attachment/detachment of brake van
is carried out with the help of plant locomotives.
6.1.4 All the points inside plant yard are kept as hand operated. The safety
measures as required for the staff to attend the operational activities
in the siding installations are provided by M/s HIL
6.1.6 The responsible person performing Shunting operations inside the In-
Plant Yard shall ensure the correct setting of points, clamping and
padlocking in the set route.
-------------------------------------------------------------------------- 26
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
6.2.2 Unloading of inward Pet coke is done through over coke unloading
platform manually.
6.2.5 Proposed handling of Fly ash will be done manually. Bagged fly ash
will be loaded through cranes/hydra whereas bulk/loose fly ash will
be loaded through pay loader machines.
-------------------------------------------------------------------------- 27
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------------------------------------------- 28
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------------------------------------------- 29
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
6.4.4 Rake for ash loading will be first received into proposed Ash handling
R&D line,
6.4.5 After rake reception of rake into R&D line, plant loco will be reversed
through engine escape line and attach to empty formation at BRGW
end.
6.4.6 The rake will be then pushed towards ash loading area and placed
into ash loading line adjoining to loading platform.
6.4.7 After proper placement of empty rake on ash loading line, loading of
fly ash will be taken up. Bagged fly ash will be loaded through
cranes/hydra whereas bulk/loose fly ash will be loaded through pay
loader machines.
6.4.8 M/s HIL shall ensure hydrating of loose fly ash and covering the
wagons with Tarpaulins after loading at their own cost.
6.4.9 After completion of fly ash loading, rake will be pulled on proposed
R&D line and then placed into Smelter lead line to place it within
wired portion for attachment of Railway loco. The loaded rake will be
further dispatched directly towards BRGW on receipt of clearance
from in-plant yard in-charge.
-------------------------------------------------------------------------- 30
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 7
_____________________________________________________________________________________________________________________________ _______
-------------------------------------------------------------------------- 31
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECTREPORT
FORPROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S
HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF WEST CENTRAL RAILWAY
CHAPTER 7
COST ESTIMATE
7.1 The total capital cost for construction of proposed rail facilities has
been computed taking into account the present cost of earthwork, P-
way, etc. The cost of the proposed rail facilities to be developed at In-
plant yard of HIL siding under Phase-1 & Phase-2 is estimated to
Rs.221.28 Lakhs & Rs.996.45 Lakhs and are placed at Annexure 7.1 and
7.2 respectively in next pages.
-------------------------------------------------------------------------- 32
CONSULTANCY BY : RCC (INFRA.) CONSULTANTS PVT. LTD., NAGPUR
Ph.No. 0712-2283689, e-mail : ramapriya_c@rediffmail.com
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT
BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------
ANNEXURE - 7.1
COST ESTIMATE FOR PROPOSED PHASE-1 WORK FOR INPLANT AUGMENTATION WORK AT EXISTING SIDING OF M/s HIL
Sl.
Description Annexure Amount
No.
1 Supply of P-Way Materials A 18,517,939
-------------------
CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.,
53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT
BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
A. SUPPLY OF P-WAY MATERIALS
1 Supply 60 kg Rails second quality of 90 UTS, 880 Grade UIC confirming to IRS T- MT 58 47938 2780404
12-2009 specifications
2 UIC 52 kg Rails second quality of 90 UTS to IRS T-12-2009 specifications, 11m MT 17 47938 814946
to 13m long, without bends/kinks, defect free & USFD tested.
3 Supply of 60kg PSC Sleepers 1540/Km
a) For Straight Track Drg. No. T-2496. Nos. 135 3300 445500
b) For Curved Track Drg. No.RDSO. T-4183 Nos. 55 3400 187000
c) For Curved Track Drg. No.RDSO. T-4184 Nos. 55 3400 187000
d) For Curved Track Drg. No.RDSO. T-4185 Nos. 55 3400 187000
e) For Curved Track Drg. No.RDSO. T-4186 Nos. 485 3400 1649000
f) Manufacture and supply of Pre stressed concrete sleepers 96 nos for 60kg 1 Sets 1 625000 625000
in12 (10125mm OR curved switches) fan shaped for points and crossigs as per
RDSO Drg.no.T-4512 to T-4594 incluidng exist sleepers (T-5471 to 5474 each 4
nos.) and approach sleepers of RDSO Drg.no.T-4786 to T-4790 with SGCI
inserts and Dowels fixed in position for fixing slide chairs, CMS crossing, MS
bearing plates etc., as per IRS specification and as per drg.no.RT-4218.
g) Manufacture and supply of Pre-stressed concrete sleepers 67 nos for 60kg 1 in Sets 5 480000 2400000
8.5 (6400 mm OR curved switches) fan shaped for points and crossings as per
RDSO Drg.no.T-4793 to T-4844 including exist sleepers of (T-5471 to 5474
each 2 nos) and approach sleepers of RDSO Drg.no.T-4786 to T-4790 with SGCI
inserts and Dowels fixed in position for fixing slide chairs, CMS crossings, MS
bearing plates etc., as per IRS specification and as per no.RT-4865.
-------------------
CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.,
53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT
BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
11 Supply of 1m. Long fish plate for 1 in 12 turn out including nuts & bolts as per Nos. 4 3750 15000
RDSO dwg no. T-5916
12 Supply of 1m. Long fish plate for 1 in 8.5 turn out including nuts & bolts as per Nos. 20 3750 75000
RDSO dwg no. T-5916
13 Supply of Joggled Fish plates on welding joints as per RDSO Dwg no. T-4016 Pairs 10 7500 75000
including clamps.
14 Supply of Fish bolts with nuts to RDSO Drg. No.T-1899 and conforming to Nos. 165 75 12375
specification No. IRS T-23-1967 & Corrigendum No. 5 of October 1987, with
single coil spring washer to RDSO Drg No. T-10773.
15 Supply of Fish bolts with nuts to RDSO Drg. No.T-11501 and conforming to Nos. 125 75 9375
specification with single coil spring washer.
16 Supply of J - clips conforming to RSDO - T-4158.IRS Specification T -31-1992. Nos. 126 90 11340
17 Supply of Elastic Rail clips to RDSO Drg. No. T-3701 and confirming to Nos. 2070 90 186300
specifications (IRS T-31-1992) & corrigendum No 2 of Apr 1999.
18 Supply of Metal 66 liners as per RDSO Drg.no.T-3740 for 60 Kg Rail on 60 Kg Nos. 3075 28 86100
Sleeper.
19 Supply of Metal Cut liners as per Drg.no.T-3702 for 60 Kg Rail on 60 Kg Sleeper. Nos. 140 28 3920
20 Supply of Grooved Rubber Sole Plate to RDSO Drg No. T-3711 and conforming No. 1020 40 40800
to IRS specification T-47-2006 & Corrigendum No -1 of June 2007.
22 Supply of 20mm dia bolts & nuts as per RDSO Drg.no.11687 (For Curve Check Nos 485 75 36375
Rails)
23 Plate screws as per Drg.no.RT-3913 Nos 970 50 48500
24 Single coil spring washer Drg.No.T-10773 Nos 1260 10 12600
25 Supply and delivery of machine broken clean, hard, angular and durable stone Cum 1830 1500 2745000
ballast to latest Railway’s specification and stacking along the toe of bank and
at suitable locations in cutting and as approved by the Engineer-in-charge at
site. (The rate will include all lead, lifts, loading, unloading, royalty, providing
of labour, tools and plants and screen of approved mesh and dimensions
required for inspection and passing at the time of measurement). The
contractor will make ground level to enable levels being taken by the Engineer-
in-charge at site prior to stacking.
26 Transportation of rail upto 50kms MT 75 615.39 46154.25
Total Amount for Supply of P-Way Material 18517939
-------------------
CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.,
53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT
BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
B. P-WAY LINKING
27 Handling/lifting/loading & spreading Track ballast including light rolling of M3 1830 200 366000
bed to a uniform level by using 5 to 10 tonnes light rollers (minimum two
passes) for preparation of ballast bed of required thickness giving ballast
cushion of 350 mm. The ballast shall be lead from existing measured stacks to
the proposed alignment of the track in cutting/embankment and points &
crossings, slab bridges and level crossings including all leads, lifts, ascends,
descends, crossing of tracks and other obstructions and spread there to make
ballast bed for the track including subsequent making up of ballast after
linking/packing of track as required to make proper ballast profile on straight
or on curves including ballast in shoulders and cribs, points & crossings, slab
bridges and level crossing as per drawings and specifications and special
conditions of contract as a complete job and as directed by Engineer at site.
28 Assembling laying and linking of BG track on PSC sleepers @1540/1660 RM 320 750 240000
sleepers/km on straight/curve, bridges, level crossings, cuttings and
embankments, yards etc., with 60 kg IRS T-12 quality 880 mpa rails of any
length including fixing of glued insulated rail joints wherever required, 60kg
fish plates with bolts and nuts including spreading, laying and squaring PSC
sleepers and all elastic fastenings to correct track parameters as specified,
complete with all contractor's labour, tools, plants , machinery, consumables
etc., as a complete job. Track is to be laid to the approved alignment, level,
gauge in straight/curves, bridges, level crossings, cuttings, embankments,
yards including providing super elevation and transitions on curves, where
required, with initial packing as per P.Way manual and making the track fit for
traffic as per the requirement of client/railways for a speed of 15kmph. The
rate shall include all leads, lifts, crossing of tracks, handling, rehandling,
transportation of rails and Permanent way materials/permanent way fittings
to the site from nominated place/depot/stores, pairing of rails, fish plating with
bolts & nuts, straightening of rails, cutting of rails to plumb/square if required,
drilling of holes & chamfering holes in rails where required, greasing fish
plates, ERCs, MCI inserts holes and oiling fish bolts & nuts (Kerosene oil, black
oil and grease graphite to be arranged by contractor at his own cost) paint
marking of correct sleeper spacing and realigning the same including intial
packing and providing, fixing steel curve boards of standard size on approaches
of the curves with details of the curves painted with contractors own paint etc.,
and as directed by the Engineer at site.
a) First round through packing including boxing to make the track fit RM 320 40 12800
b) Second round through packing including boxing to make the track fit RM 320 30 9600
c) Third round through packing including boxing to make the track fit RM 320 25 8000
Note: the above items (a), (b) & (c) will be operated fully or partially depending
on the requirement.
29 Assembling and laying of 60 Kg 1 in 12 points and crossing on all types of Set 1 130000 130000
sleepers duly packed up to the required level complete as per drawing and to
the satisfaction of Engineers-in-charge at site complete in all respects with
point lever box fixed in position and ready for operation. Rate includes loading,
leading all the materials from his stores to the site of work, unloading the
handling all the material with all leads and lifts.
a) First round through packing Set 1 10000 10000
b) Second round through packing Set 1 8000 8000
c) Third round through packing Set 1 6000 6000
Note: the above items (a), (b) & (c) will be operated fully or partially depending
on the requirement.
30 Assembling and laying of 60 Kg 1 in 8.5 points and crossing on all types of Set 5 90000 450000
sleepers duly packed up to the required level complete as per drawing and to
the satisfaction of Engineers-in-charge at site complete in all respects with
point lever box fixed in position and ready for operation. Rate includes loading,
leading all the materials from his stores to the site of work, unloading the
handling all the material with all leads and lifts.
a) First round through packing Set 5 7500 37500
b) Second round through packing Set 5 6000 30000
c) Third round through packing Set 5 4500 22500
Note: the above items (a), (b) & (c) will be operated fully or partially depending
on the requirement.
-------------------
CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.,
53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT
BARGAWAN STATION OF WEST CENTRAL RAILWAY
-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
31 Execution of Alumino Thermic welding of 60 Kgs 90 UTS/T-12 rails by SKV Nos. 65 1200 78000
Process using prefabricated moulds (zircon washed) using single shot crucible
fitted with automatic tapping thimble on various location, supply of 60kg/52kg
(90UTS) rails with contractor's own welding portion including trimming,
grinding ,finishing etc. as per the specification with all labour,materials, T & P ,
all leads, lifts, transport, taxes etc. as a complete job as per RDSO specification.
32 Fabrication & fixing check rails (Rails 52 kg) including bending, cutting flange, Rmt 310 400 124000
cutting the web of rail cutting the rails, drilling of holes in the web of check rail,
coal tar the check rail and oil the threads of bolts & nuts and flaring the check
rail ends as per RDSO approved Drg. and fixing in position on the PSC sleeper
inside of both running rails of Lxing (required check rail supporting viz.
brackets for check rails, bolts & nuts, washers, liners etc.) as per directions of
Engineer at site (payment shall be made on the basis of running track metres
measured from end to end of check rail along the centre line of track).
33 Fabricating, supplying & fixing of cement concrete Fouling marks, with No. 6 1250 7500
Precast/cement concrete M-10 grade as per IS 456-2000, with 40mm graded
stone aggregate with contractors Cement and all labour materials, mechanical
mixing vibrating with mechanical or electrical vibrator, tools and plants if
required all leads and as directed by the Engineer-in-charge. Size- 1500 mm in
length, 250 mm wide, 125 mm depth, with top edges rounded off and the top
surface white washed. The number of wagons which can be accommodated in
the siding or the loop to be painted with black paint on the top surface. The
fouling mark is to be fixed at a point at which the spacing between the tracks
begins to reduce to less than the minimum as laid down in the Railway's
Schedule of Dimensions. The fouling marks are to be fixed in Railway yards
with all contractor's materials, labour, plant & machinery, complete work.
\Supplying and laying of Fouling marks.
34 Supplying and fixing Stock rail joint Point & Derailing switch number plate with Each 6 1200 7200
painting etc., with all contractors material, labour with all lead and lift.
35 Supplying and fixing Kilometer Posts, Gradient Posts,Curve posts and Indicator Each 10 1250 12500
boards etc., with all contractors material, labour with all lead and lift.
36 Dismantling of existing track, segregation of materials, leading and stacking RMT 250 200 50000
material wise at the locations as directed by the engineer at site
Total Amount for P-Way Linking 1609600
-------------------
CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.,
53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF
WEST CENTRAL RAILWAY-------------------------------------
ANNEXURE - 7.2
COST ESTIMATE FOR PROPOSED PHASE-2 WORK FOR INPLANT AUGMENTATION WORK AT EXISTING SIDING OF M/s HIL
Sl.
Description Annexure Amount
No.
1 Supply of P-Way Materials A 20,619,037
5 Drainwork E 8,575,375
-------------------CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-
2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF
WEST CENTRAL RAILWAY-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
A. SUPPLY OF P-WAY MATERIALS
1 Supply 60 kg Rails IU quality of 90 UTS, 880 Grade UIC confirming to IRS T-12- MT 148 47938 7094824
2009 specifications
2 Supply of 60kg PSC Sleepers 1540/Km
a) For Straight Track Drg. No. T-2496. Nos. 1885 3300 6220500
Fixtures, Fastenings & fittings
3 Supply of 1m. Long fish plate for 60kg rails as per RDSO dwg no. T-5916/ T- Pairs 205 7500 1537500
5851.
4 Supply of Fish bolts with nuts to RDSO Drg. No.T-1899 and conforming to Nos. 1660 75 124500
specification No. IRS T-23-1967 & Corrigendum No. 5 of October 1987, with
single coil spring washer to RDSO Drg No. T-10773.
5 Supply of J - clips conforming to RSDO - T-4158.IRS Specification T -31-1992. Nos. 1292 90 116235
6 Supply of Elastic Rail clips to RDSO Drg. No. T-3701 and confirming to Nos. 6900 90 621000
specifications (IRS T-31-1992) & corrigendum No 2 of Apr 1999.
7 Supply of Metal 66 liners as per RDSO Drg.no.T-3740 for 60 Kg Rail on 60 Kg Nos. 7940 28 222320
Sleeper.
8 Supply of Metal Cut liners as per Drg.no.T-3702 for 60 Kg Rail on 60 Kg Sleeper. Nos. 1360 28 38080
9 Supply of Grooved Rubber Sole Plate to RDSO Drg No. T-3711 and conforming to No. 3860 40 154400
IRS specification T-47-2006 & Corrigendum No -1 of June 2007.
-------------------CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-
2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF
WEST CENTRAL RAILWAY-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
B. P-WAY LINKING
13 Handling/lifting/loading & spreading Track ballast including light rolling of bed M3 3130 175 547750
to a uniform level by using 5 to 10 tonnes light rollers (minimum two passes)
for preparation of ballast bed of required thickness giving ballast cushion of 350
mm. The ballast shall be lead from existing measured stacks to the proposed
alignment of the track in cutting/embankment and points & crossings, slab
bridges and level crossings including all leads, lifts, ascends, descends, crossing
of tracks and other obstructions and spread there to make ballast bed for the
track including subsequent making up of ballast after linking/packing of track
as required to make proper ballast profile on straight or on curves including
ballast in shoulders and cribs, points & crossings, slab bridges and level crossing
as per drawings and specifications and special conditions of contract as a
complete job and as directed by Engineer at site.
14 Assembling laying and linking of BG track on PSC sleepers @1540/1660 RM 1200 650 780000
sleepers/km on straight/curve, bridges, level crossings, cuttings and
embankments, yards etc., with 60 kg IRS T-12 quality 880 mpa rails of any
length including fixing of glued insulated rail joints wherever required, 60kg
fish plates with bolts and nuts including spreading, laying and squaring PSC
sleepers and all elastic fastenings to correct track parameters as specified,
complete with all contractor's labour, tools, plants , machinery, consumables
etc., as a complete job. Track is to be laid to the approved alignment, level,
gauge in straight/curves, bridges, level crossings, cuttings, embankments, yards
including providing super elevation and transitions on curves, where required,
with initial packing as per P.Way manual and making the track fit for traffic as
per the requirement of client/railways for a speed of 15kmph. The rate shall
include all leads, lifts, crossing of tracks, handling, rehandling, transportation of
rails and Permanent way materials/permanent way fittings to the site from
nominated place/depot/stores, pairing of rails, fish plating with bolts & nuts,
straightening of rails, cutting of rails to plumb/square if required, drilling of
holes & chamfering holes in rails where required, greasing fish plates, ERCs, MCI
inserts holes and oiling fish bolts & nuts (Kerosene oil, black oil and grease
graphite to be arranged by contractor at his own cost) paint marking of correct
sleeper spacing and realigning the same including intial packing and providing,
fixing steel curve boards of standard size on approaches of the curves with
details of the curves painted with contractors own paint etc., and as directed by
the Engineer at site.
a) First round through packing including boxing to make the track fit RM 1200 40 48000
b) Second round through packing including boxing to make the track fit RM 1200 30 36000
c) Third round through packing including boxing to make the track fit RM 1200 25 30000
Note: the above items (a), (b) & (c) will be operated fully or partially depending
on the requirement.
15 Fabrication, erecting and fixing concrete dead end as per railway approved No. 1 100000 100000
drawing. This includes cutting of rails, drilling of holes in rails, providing
stopper plates, fixing of wooden beam and all other fixtures as per approved
drawing including all leads, lifts transportation, crossing of lines if required, all
labour and material complete as per direction of Engineer. The rate includes
painting of the dead end beam and other components as per approved drawing
of railway with two coates of approved enamel paint over a coat of redoxide
primer and supply of wooden beam at the own cost of the contractor.
16 Fabricating, supplying & fixing of cement concrete Fouling marks, with No. 2 1250 2500
Precast/cement concrete M-10 grade as per IS 456-2000, with 40mm graded
stone aggregate with contractors Cement and all labour materials, mechanical
mixing vibrating with mechanical or electrical vibrator, tools and plants if
required all leads and as directed by the Engineer-in-charge. Size- 1500 mm in
length, 250 mm wide, 125 mm depth, with top edges rounded off and the top
surface white washed. The number of wagons which can be accommodated in
the siding or the loop to be painted with black paint on the top surface. The
fouling mark is to be fixed at a point at which the spacing between the tracks
begins to reduce to less than the minimum as laid down in the Railway's
Schedule of Dimensions. The fouling marks are to be fixed in Railway yards with
all contractor's materials, labour, plant & machinery, complete work. \Supplying
and laying of Fouling marks.
17 Supplying and fixing Stock rail joint Point & Derailing switch number plate with Each 2 1200 2400
painting etc., with all contractors material, labour with all lead and lift.
18 Supplying and fixing Kilometer Posts, Gradient Posts,Curve posts and Indicator Each 10 1250 12500
boards etc., with all contractors material, labour with all lead and lift.
19 Dismantling of existing track, segregation of materials, leading and stacking RMT 100 200 20000
material wise at the locations as directed by the engineer at site
Total Amount for P-Way Linking 1579150
-------------------CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-
2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF
WEST CENTRAL RAILWAY-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
C. Earthwork in Formation
20 Excavation in cutting for formation in all types of soil including lead & lifts with
contractors own materials, equipment, labour etc. and as per directions of
Engineer-in-Charge.
a) All kinds of soils Cum 178880 120 21465600
-------------------CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-
2283689 e-ID : HQ@RCCINFRAS.COM
PROJECT REPORTFOR PROPOSED AUGMENTATION OF IN-PLANT YARD OF EXISTING RAILWAY SIDING OF M/S HINDALCO INDUTSRIES LTD. TAKES-OFF AT BARGAWAN STATION OF
WEST CENTRAL RAILWAY-------------------------------------
Sl.
DESCRIPTION Unit Qty. Rate Amount
No.
D Construction of Loading Wharf
25 Earthwork in Excavation for construction of Platform, etc, dressing, levelling of Cum 900 180 162,000
side and floor, to proper line & level, in all types of Soil, Earth, Sand, Gravel,
Murum by mechanical means at the location of proposed High Level, Medium
level platforms with all leads & following lifts, including dewatering, shoring
and strutting as necessary, clearing / stripping of area before excavation,
removal of all trees, bushes, shrubs etc, dewatering if required, dressing of
excavated area, breaking of clods & transportation of the rejected excavated
material to the designated areas within the lead of 1 KM after keeping the
selected excavated material required for backfilling of the foundation
excavation and for embankment building, backfilling in layers of 300mm
thickness with watering, rolling & compaction of each layer, carrying out field
compaction test for ensuring the desired compaction of the fill, dressing of filled
up area true to the line & level with all labour, material, consumables, T & P,
Machineries, equipements etc. complete as per the railways specifications and
as directed by the Owner's Engineer.
26 Providing and laying plain cement concrete of M-15 grade with 20mm and down Cum 160 6000 960,000
size graded stone aggregates for leveling course or any other place, including
tamping, ramming vibrating, curing all as specified in any shape, position,
thickness and finishing the top surface rough or smooth, etc. all complete as per
drawings, specifications with all contractor's labour, tools, plants, machinery
etc., and as per direction of Engineer-in-Charge.
27 Providing & Laying in position plain cement concrete of M-25 grade with 20mm Cum 925 7500 6,937,500
down stone aggregates for coping, platform walls, etc. or any other place,
including tamping, ramming, vibrating, curing all as specified in any shape,
position, thickness and finishing the top surface rough or smooth, etc. all
complete as per drawings, specifications with all contractor's labour, tools,
plants, machinery etc., and as per direction of Engineer-in-Charge.
28 Supplying and Placing in position HIGH STRENGTH DEFORMED STEEL BARS MT 12 78000 936,000
REINFORCEMENT (conforming to IS:1786, Grade Fe 415), for R.C.C. work
including transporting the steel, straightening, cleaning, decoiling, cutting,
bending to required shapes and lengths as per details, binding with contractor’s
own 16SWG black soft annealed binding wire at every intersection, supplying
and placing with proper cover blocks, supports, chairs, overlaps, welding,
spacers, fan hooks etc. for all heights and depths etc. all complete as directed.
(SUPPLY OF ALL MATERIAL IN CONTRACTOR’S SCOPE).
E DRAINWORK
29 Earthwork in excavation for all type of soil for bridge foundations pile Cum 975 225 219375
cap,abutment and retaining walls,rcc box etc. requiring dressing to neat
dimensions including wet excavation below sub soil water where continuously
bailing out of water is required with contractor’s equipments etc., complete.
30 Providing and laying plain cement concrete of M-15 grade with 20mm and down Cum 110 6000 660000
size graded stone aggregates for leveling course or any other place, including
tamping, ramming vibrating, curing all as specified in any shape, position,
thickness and finishing the top surface rough or smooth, etc. all complete as per
drawings, specifications with all contractor's labour, tools, plants, machinery
etc., and as per direction of Engineer-in-Charge.
31 RCC M-25 grade (controlled concrete) cast in situ in foundation and Cum 520 8500 4420000
superstructure for Abutments,Pier, RCC slab, bed block, RCC railing, RCC box
culverts / bridges (top slab, bottom slab and walls of any span, length and
thickness) and return wall using 20mm and below gauge graded crushed stone
coarse aggregate and coarse sand as per specification for all height including
submission and getting approval of the Design mix and weigh batching,
providing and removal of centering, shuttering, scaffolding including mixing
with mixer machine and vibrating with needle form vibrator, rendering and
finishing the exposed surface of RCC work and curing for a specified period, all
ascents, descents, crossing of any obstruction, all lead, lifts all labour and
material complete job as per specification. (Except steel reinforcement which
will be paid separately).
32 Supplying and Placing in position HIGH STRENGTH DEFORMED STEEL BARS MT 42 78000 3276000
REINFORCEMENT (conforming to IS:1786, Grade Fe 500D), for R.C.C. work
including transporting the steel, straightening, cleaning, decoiling, cutting,
bending to required shapes and lengths as per details, binding with contractor’s
own 16SWG black soft annealed binding wire at every intersection, supplying
and placing with proper cover blocks, supports, chairs, overlaps, welding,
spacers, fan hooks etc. for all heights and depths etc. all complete as directed.
(SUPPLY OF ALL MATERIAL IN CONTRACTOR’S SCOPE).
-------------------CONSULTANCY BY : RCC INFRASTRUCTURE CONSULTANTS PVT LTD.53, SIDDHESH APPT., S.E.RAILWAY LAYOUT-II, RANAPRATAPNAGAR, NAGPUR-440022 PH.NO. 0712-
2283689 e-ID : HQ@RCCINFRAS.COM
NOTE:-
1. ALL DIMENSIONS ARE IN METRIC UNITS.
2. CHAINAGE 0.00M IS RECKONED FROM CENTER LINE OF BARGAWAN STATION BUILDING.
3. KILOMETERS ARE RECKONED FROM CENTER LINE OF CSTM STATION.
8m 4. THIS DRAWING IS PREPARED BASED ON HQ PLAN NO. GM/W/WCR/JBP/0433.
61
5 9. 5. L.T., H.T. CABLE / O.H LINES TO BE RELOCATED WHERE EVER REQUIRED.
0
P/F E
:6
CH 6. POWER LINE CROSSING TO BE MODIFIED IF REQUIRED.
AT 7. HIGH MAST, FLOOD LIGHT, TOWERS MAY BE LOCATED / RELOCATED WHERE EVER NECESSARY.
ND A
ART
ST 8. PROPER DRAINAGE SYSTEM IN THE SIDING HAS TO BE ENSURED AS PER THE SITE CONDITION.
T
F
P/ 9. SPEED POTENTIAL / SPEED RESTRICTION ON CURVE SHALL BE 15 KMPH.
CH:67
10. ALL BRIDGES ARE DESIGNED FOR 25 TON AXLE LOAD-2008 STANDARD.
11. CAMBER OF 1:30 SHALL BE PROVIDED AT, FORMATION LEVEL FOR DRAINAGE OF THE WATER.
39.61
12. FORMATION, SUB BANK FOR EMBANKMENT & CUTTING ARE TO BE PROVIDED AS PER RDSO GUIDELINES.
8m
CH: 6 9.903M
FL. 3
FL.
LEV
399.
378
M
EL
250
20
0
15
0
LEGEND :
1. EXISTING SHOWN IN BLACK.
2. DISMANTLING SHOWN IN BLACK DOTTED.
3. PROP. HIL SDG (PHASE-1) WORK SHOWN IN RED
4. PROP. HIL SDG. (PHASE-2) WORK SHOWN IN RED DOTED
5. APPROVED RLY WORK SHOWN IN PINK DOTTED.
7850
EXST. TRACK STRUCTURE:-
60 Kg 90 UTS RAIL WELDED AS 3 RAIL PANEL
1676 TYPE OF RAIL = 52KG
60 Kg PSC SLEEPER (1540 Nos PER KM.)
TYPE OF SLEEPER = PSC SLEEPERS NOTE:-
PSC SLEEPER
300mm CUSHION STONE BALLAST DENSITY OF SLEEPERS = 1540 NOS. PER KILOMETER
SL 1. ALL DIMENSIONS ARE IN METRIC UNITS.
E
2:1 SLOPE 1 IN 30 SLOPE 1 IN 30 OP BALLAST CUSHION = 250MM.
E
OP 1400 2525 2525 1400 2:1 2. CHAINAGE 0.00M IS RECKONED FROM CENTER LINE OF BARGAWAN STATION BUILDING.
SL
BLANKETING BLANKETING
3. KILOMETERS ARE RECKONED FROM CENTER LINE OF CSTM STATION.
EARTHWORK IN FORMATION
4. THIS DRAWING IS PREPARED BASED ON HQ PLAN NO. GM/W/WCR/JBP/0433.
(GOOD EARTH) 5. L.T., H.T. CABLE / O.H LINES TO BE RELOCATED WHERE EVER REQUIRED.
SCALE: N. T. S.
PROP. TRACK STRUCTURE:- 6. POWER LINE CROSSING TO BE MODIFIED IF REQUIRED.
7. HIGH MAST, FLOOD LIGHT, TOWERS MAY BE LOCATED / RELOCATED WHERE EVER
NECESSARY.
TYPE OF RAIL = 60KG./90 UTS FIRST CLASS RAILS/IU RAILS
8. PROPER DRAINAGE SYSTEM IN THE SIDING HAS TO BE ENSURED AS PER THE SITE
TYPE OF SLEEPER = 60KG. PSC SLEEPERS
CONDITION.
DENSITY OF SLEEPERS = 1540 NOS. PER KILOMETER
9. SPEED POTENTIAL / SPEED RESTRICTION ON CURVE SHALL BE 15 KMPH.
BALLAST CUSHION = 300MM.
10. ALL BRIDGES ARE DESIGNED FOR 25 TON AXLE LOAD-2008 STANDARD.
ALL THE 1 IN 12 & 1 IN 8.5 POINT CROSSING WILL BE OF 60 KG RAIL SECTION
11. CAMBER OF 1:30 SHALL BE PROVIDED AT, FORMATION LEVEL FOR DRAINAGE OF THE
WITH CURVED SWITCH ON 60 KG. PSC SLEEPERS (FAN SHAPED)
WATER.
12. FORMATION, SUB BANK FOR EMBANKMENT & CUTTING ARE TO BE PROVIDED AS PER
RDSO GUIDELINES.
26.008
CH: 6545.00M
FL. 399.378M
Curve NO. 1A (R)
TL=54.343M
C.L.=107.021M
M
.00
2 15 78M
: 2 9.3
CH . 39 0M
FL 0 0.0 38
8 0
: 1 01.
CH L: 4 M
EF .00
800 .038
: 6
CH L: 39
E F
CH: 6755.00M
FL. 399.903M