Omega Energy Developer Pvt. Ltd.

Lot 05: Hydromechanical Works


Suni Gad Hydropower Project (11.05 MW) Volume 3 Part 4: Schedule of Prices

GRAND SUMMARY
1 2 3 4
S.No. Description of Works Amount Remarks
1 Total Amount of Off-Shore L.C. (Indian Currency) 30,203,438.00 IN INR
2 Total Amount of On-Shore L.C. (Nepalese Currency) 147,559,070 IN NPR
VAT @13% of Overll Total (Except Total USD/INR Component) 19,182,679
GRAND TOTAL 215067250
In Words: Nepali Rupees Two Hundred Fifteen Million Sixty Seven Thousand Two Hundred Fifty Only

E. I. Maven Pvt. Ltd. Seal and Signature of Bidder: Page GS - 1


Date:
Omega Energy Developer Pvt. Ltd. Lot 05: Hydromechanical Works
Suni Gad Hydropower Project (11.05 MW) Volume 3 Part 4: Schedule of Prices

SCHEDULE - 2: HYDROMECHANICAL WORKS FOR STEEL PIPE AND BENDS


1 2 3 4 5 6 7=5+6 8=4x7 9

E. I. Maven Pvt. Ltd. Seal and Signature of Bidder: Page GS - 2


Date:
Omega Energy Developer Pvt. Ltd. Lot 05: Hydromechanical Works
Suni Gad Hydropower Project (11.05 MW) Volume 3 Part 4: Schedule of Prices

SCHEDULE - 2: HYDROMECHANICAL WORKS FOR STEEL PIPE AND BENDS


1 2 3 4 5 6 7=5+6 8=4x7 9
Rate for Rate for
Fabricatio Erection Total Amount
ITEM DESCRIPTION UNIT QTY REMARKS
n (Per kg) (Per kg) in ( In NPR) (IN NPR)
in NPR NPR

Approach Canal Pipe, Material: IS


2.16
2062:2011 E250 BR

Material in
2.16.1 Pipe Diameter 2000 mm, Thickness 8 mm, Length 310 m. Ton 124 30 25 55 6820000
Employer's Scope
Material in
2.16.2 Stiffener rings for pipe @ 1.5m c/c, thickness 8mm. Ton 11.38 30 25 55 625900
Employer's Scope
Sub Total (2.15) 7445900
2.17 Headrace Pipe, Material: IS 2062:2011 E250 BR
Material in
2.17.1 Pipe Diameter 1400 mm, Thickness 8 mm, Length 4920 m. Ton 1436.4 32 25 57 81874800
Employer's Scope
Material in
2.17.3 Pipe Diameter 1400 mm, Thickness 12 mm, Length 330 m. Ton 142.8 32 25 57 8139600
Employer's Scope
Material in
2.17.4 Pipe Diameter 1400 mm, Thickness 16 mm, Length 195 m. Ton 112.35 32 25 57 6403950
Employer's Scope
Material in
2.17.5 Stiffener rings for pipe @ 1.5m c/c, thickness 8mm. Ton 117.51 32 25 57 6698070
Employer's Scope
Sub Total (2.16) 103116420
2.18 Surge Pipe, Material: IS 2062:2011 E350 BR
Material in
2.18.1 Pipe Diameter 2500 mm, Thickness 12 mm, Length 235 m. Ton 183.75 35 28 63 11576250
Employer's Scope
Material in
2.18.2 Stiffener rings for pipe @ 1.5m c/c, thickness 10mm. Ton 12.65 35 28 63 796950
Employer's Scope
Sub Total (2.17) 12373200

E. I. Maven Pvt. Ltd. Seal and Signature of Bidder: Page GS - 3


Date:
Omega Energy Developer Pvt. Ltd. Lot 05: Hydromechanical Works
Suni Gad Hydropower Project (11.05 MW) Volume 3 Part 4: Schedule of Prices

SCHEDULE - 2: HYDROMECHANICAL WORKS FOR STEEL PIPE AND BENDS


1 2 3 4 5 6 7=5+6 8=4x7 9
2.18 Steel Penstock Pipe, Material: IS 2062:2011 E350 BR
Material in
2.18.1 Pipe Diameter 1100 mm, Thickness 8 mm, Length 158 m. Ton 37.8 35 28 63 2381400
Employer's Scope
Material in
2.18.2 Pipe Diameter 1100 mm, Thickness 10 mm, Length 108 m. Ton 31.5 35 28 63 1984500
Employer's Scope
Material in
2.18.3 Pipe Diameter 1100 mm, Thickness 12 mm, Length 140 m. Ton 48.3 35 28 63 3042900
Employer's Scope
Material in
2.18.4 Pipe Diameter 1100 mm, Thickness 14 mm, Length 96 m. Ton 38.85 35 28 63 2447550
Employer's Scope
Material in
2.18.5 Pipe Diameter 1100 mm, Thickness 16 mm, Length 92 m. Ton 43.0 35 28 63 2709000
Employer's Scope
Material in
2.18.6 Pipe Diameter 1100 mm, Thickness 18 mm, Length 70 m. Ton 36.75 35 28 63 2315250
Employer's Scope
Material in
2.18.7 Pipe Diameter 1100 mm, Thickness 20 mm, Length 25 m. Ton 13.65 35 28 63 859950
Employer's Scope
Material in
2.18.8 Pipe Diameter 800 mm, Thickness 16 mm, Length 64 m. Ton 21.0 35 28 63 1323000
Employer's Scope
Sub Total (2.18) 17063550
Material in
2.19 Pipe Bends including Stiffeners Ton 120 35 28 63 7560000
Employer's Scope
Sub Total (2.19) 7560000
TOTAL AMOUNT FOR FABRICATION AND ERECTION OF HEADRACE PIPE AND PENSTOCK PIPE
147559070
WITH BENDS

E. I. Maven Pvt. Ltd. Seal and Signature of Bidder: Page GS - 4