Download as pdf
Download as pdf
You are on page 1of 7
RAMAT POLY FECHNIC MAIDUGURI SCHOOL OF ENVIRONMENTAL STUDIES DEPARTMENT OF QUANTITY SURVEYING ) OF FOURTHS! ON EXAMINATION + PRIN COURSE CODE: QUS 202 PROGRAMME: ND II QUANTITY S!8VEVING TIME ALLOWED: 3 HOURS INSTRUCTION: ATTEMPT QUES { Reference matesiat i ‘Students are only allowed to bring in or use unmarked copy of the Building and Engineerin Standard Method of Measurement Measurement 4" edition (CESMM4) Note: dition (BESMM4)/Civil Engineering Standard Method of ‘© All assumptions must be clearly indicated + Ail waste calculations should be shown neatly, clarity attract more mark QUESTION ONE, Using drawing nr QUS202/FSE/2021,Take off quantities of in-situ conerete and concrete ancillaries work for mass conerete retaining wall and prepare a draft bill of quantities 30marks | QUESTION TWO. Explain the measurements principles of electrical install in building ISmarks Ques STION THREE With the aid of elear sketch explain the procedure oF computing average ight or depth for eut ‘and/or fill by principle of driving weightings 1Smarks QUESTION FOUR Explain the principles of Roads and Paving measurements 15marks RAMAT POLYTECHNIC MAIDUGUR! DEPARTMENT OF QUANTITY SURVEYING END OF FOURTH SEMESTER EXAMINATION COURSE TITLE: TENDERING AND ESTIMA’ COURSE CODE: QUS 209 PROGRAM: NDILQS : DURATION: 2H 30MIN ANSWER ANY FOUR QUESTION 1, You are selected by your organization to lead the procurement team for the tendering of a proposed multi-construction project. As a quantity surveyor state any preferred type of tendering process you will choose and the reason for your choice? (1 Smarks) a. List in sequence the overall method used by a contractor to arrive at a tender figure? (12 marks) b. Define tendering? (3marks) 3. a, What are the requirement for preparation of estimating? (Smarks) b. Highlight the factors affecting accuracy of estimating? (10marks) 4, Briefly explain the following? (1 Smarks) i. Provisional sum (3marks) Tender sum (3marks) ‘Tender evaluation (Smarks) Approximate estimate (3marks) vy. Subcontractor (Sinuatks) 5. List and explain the three main types of con actual arrangement? (15 marks) 6. a. Define estimating? (3 marks) bb. What are the reasons for approximate estimating? (12marks) RC MITECEURAL DRAWING. —— a DESIGN I= ARCHITECTURAL DRAWING.

You might also like