Professional Documents
Culture Documents
WA Ted's Stillwater Add Services 220621
WA Ted's Stillwater Add Services 220621
Daniel Kittrell
(Printed name) (Printed name)
Facilities Director
(Title) (Title)
Houston
Dallas
Tulsa
Nashville
inventure.design
$
$
$
$
$
tt
tt
CEC# 210175
ADDITIONAL SERVICES AGREEMENT #1
This Additional Services Agreement #1, made and entered into this day of June 21, 2022, by and between
Inventure (hereinafter referred to as “Client”) and CEC Corporation, (hereinafter referred to as the
“Engineer”), provides for Additional Services listed herein be incorporated into the engineering contract
fee proposal for the Ted’s Café Escondido, Stillwater, OK dated August 21, 2021.
o Construction Documents
o Provide one (1) meeting and site visit with City staff
o Provide civil engineering construction documents for a fire line to the existing building
Provide plan and profile drawing for city permitting requirements
o Construction Administration
o Product submittal reviews
o RFI/ASI response
IN WITNESS WHEREOF, this Agreement, which is subject to the terms and conditions listed above,
Attachment(s), and the prior Engineering Proposal Agreement, is accepted as of the date first written above.
07/08/2022