Critical Policies, Programs, Projects, Services and Activities

PEACE AND ORDER AND PUBLIC SAFETY (POPS) PLAN 2023 - 2025
MUNICIPALITY OF DEL GALLEGO, CAMARINES SUR
DRAFT
Chapter E - Critical Policies, Programs, Projects, Services and Activities

1. POPS Issue: Need for additional financial assistance to the Implementation Program of Del Gallego PNP to Effectively Enforce the National Laws and
Municipal Ordinances and to Maintain Peace and Order Situation at this Municipality
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Amount allocated for the


Implementation Program of Del Sufficient amount allocated for the
Implementation Program of Del
Gallego PNP to Effectively Enforce Implementation Program of Del
Gallego PNP to Effectively Enforce Aid to National
100000 per the National Laws and Municipal Gallego PNP to Effectively Enforce the
the National Laws and Municipal Line Agencies - PNP, MO Jan 02, 2023 Dec 31, 2025
year Ordinances and to Maintain Peace National Laws and Municipal
Ordinances and to Maintain Peace PNP
and Order Situation at this Ordinances and to Maintain Peace and
and Order Situation at this
Municipality Order Situation at this Munic
Municipality

2. POPS Issue: Need of financial support to to 4th Mobile Force Platoon of Camarines Sur 1st Provincial Mobile Force Company
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

PEACE AND ORDER PEACE AND ORDER Sufficient amount allocated to


Amount allocated to support
PROGRAM (Support to 4th PROGRAM (Support to 4th support 4th Mobile Force
4th Mobile Force Platoon of 150000 per
Mobile Force Platoon of Mobile Force Platoon of MO Jan 02, 2023 Dec 31, 2025 Platoon of Camarines Sur 1st
Camarines Sur 1st Provincial year
Camarines Sur 1st Provincial Camarines Sur 1st Provincial Provincial Mobile Force
Mobile Force Company
Mobile Force Company) Mobile Force Company) Company

Page 1
Critical Policies, Programs, Projects, Services and Activities

3. POPS Issue: Increasing Incidence of Violence against Women and Children case
Objective: To decrease the number of VAWC cases by 30%
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Gender Responsive Management MSWDO, MHO, PNP Jan 02, 2023 Dec 31, 2025 VAWC cases decreased by the end of 2025

Comprehensive Intervention Against Gender on


Comprehensive Intervention Against Gender Based Violence successfully conducted
MSWDO, PNP, MHO Jan 02, 2023 Dec 31, 2025
on Based Violence (CIAGV)
Decreased cases of gender based violence

Counselling services for rehabilitation of


Counselling services for rehabilitation of
MSWD Jan 02, 2023 Dec 31, 2025 perpetrator of Domestic Violence (CSRPOP)
perpetrator of Domestic Violence (CSRPOP)
30% of VAWC conducted successfully
Percentage
cases Women
reduction in the
decreased by Welfare Conduct Orientation/Training on Barangay
number of MSWDO, PNP Jan 02, 2023 Dec 31, 2025 32 VAW Desk established and strengthened
the end of 2025 Program VAW Desk Officers and Barangay Officials
VAWC cases
(10%/year)
Recognized and encourage women's
Observance of Women's Month Celebration MSWDO, LGU Jan 02, 2023 Dec 31, 2025
participation

Observance of 18 Day Campaign to end VAW MSWDO, PNP Jan 02, 2023 Dec 31, 2025 Decreased cases of VAW

Strenghtened VAWC Officers


VAWC Meetings MSWDO Jan 02, 2023 Dec 31, 2025
VAWC Quarterly meeting conducted
successfully

4. POPS Issue: Presence of Child Abuse cases


Objective: To reduce the number of sexually abuse cases by 50% in 3 years
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Intensify implementation of RA 7610 Special Cases of Children: Provision of


Provided the needed
(Special Protection of Children immediate comprehensive legal, medical,
Percentage MSWDO Jan 02, 2023 Dec 31, 2025 intervention for victims
50% reduction Against Abuse, Exploitation and psychological and shelter support to victim-
reduction in the and families
in sexually Discrimination) survivor of VAWC
number of sexually
abuse cases
abuse cases
Intensify awareness of the community Purchase of amenities/equipment for Bahay LGU has One (1)
MSWDO Jan 02, 2023 Dec 31, 2025
on different Protective Laws Pag-asa Functional Bahay Pag asa

Page 2
Critical Policies, Programs, Projects, Services and Activities

5. POPS Issue: Presence of children in cconflict with law/CAR


Objective: To educe the number of CAR by 50%
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Formation and Strenghtneing of BCPC and


Percentage reduction of Intensify Advocacy on All barangays has functional
50% other institutions/partner for the protection of MSWDO Jan 02, 2023 Dec 31, 2025
CAR cases RA 9344 BCPC members
children

6. POPS Issue: Presence of motorcyle-riding criminal


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Campaign Against Motorcycle-riding Zero incidence of motorcycle riding


PNP Jan 02, 2023 Dec 31, 2025
Criminal (IEC) criminal
Number of motorcycle- Campaign Against
0
riding criminal Motorcycle-riding Criminal Campaign Against Motorcycle-riding Prevented motorcycle-riding related
Criminal (Conduct Checkpoint and PNP Jan 02, 2023 Dec 31, 2025 crimes by conducting checkpoints
Mobile Patrol regularly

7. POPS Issue: Incidence of robbery and hold-up


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Campaign Against Robbery and Hold-up Prevented robbery and other related crime
PNP Jan 02, 2023 Dec 31, 2025
(Conduct Surveillance Operation) through surveillance operation
Campaign Against
Number of robbery Campaign Against Robbery and Hold-up Prevented robbery related crimes through
0 Robbery and Hold- PNP Jan 02, 2023 Dec 31, 2025
and hold-up cases (Conduct Dragnet Operation) dragnet operations
up
Campaign Against Robbery and Hold-up
PNP Jan 02, 2023 Dec 31, 2025 Educated community through IEC/'s
(IEC)

Page 3
Critical Policies, Programs, Projects, Services and Activities

8. POPS Issue: Presence of loose firearms


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Campaign Against Loose Firearms All firearms in the municipality were


PNP Jan 02, 2023 Dec 31, 2025
(Bilang Boga and Kontra Boga) documented
Number of loose Campaign Against
0
firearms Loose Firearms Community is well-informed regarding the
Campaign Against Loose Firearms
PNP Jan 02, 2023 Dec 31, 2025 Comprehensive Firearms and Ammunition
(Awareness Campaign)
Regulation Act

9. POPS Issue: Presence of wanted and most wanted criminal


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Campaign Against Most Wanted and Other Campaign Against Most Wanted
Most Wanted Persons (Conduct Surveillance PNP Jan 02, 2023 Dec 31, 2025 and Other Most Wanted Persons
Number of wanted and Campaign Against Most
of Wanted Person) conducted
most wanted persons 10 Wanted and Other Most
arrested Wanted Persons
Campaign Against Most Wanted and Other Case filed against most wanted
PNP Jan 02, 2023 Dec 31, 2025
Most Wanted Persons persons

Page 4
Critical Policies, Programs, Projects, Services and Activities

10. POPS Issue: Some of the barangays are still affected by illegal drugs. Community-based rehabilitation program for PWUDs surrenderees is still needed.
Objective: Objectives
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

LGU has provided livelihood program for


Livelihood Program for Drug Surrenderees MO, PNP, MSWDO Jan 02, 2023 Dec 31, 2025
drug surrenders

CBRP were effectively implemented year-


Community-Based Rehabilitation Program PNP, MSWDO, MHO Jan 02, 2023 Dec 31, 2025
round

Anti-Illegal Drugs Campaign - Buy Bust Successfully conducted buy bust operation
Number of 100% of PNP Jan 02, 2023 Dec 31, 2025
Anti-Drug Operation to arrest illegal drug users and pushers
barangay barangays in the
Addiction
affected by municipality is
Program Anti-Illegal Drug Campaign (Search Successfully arrested illegal drug pushers
illegal drugs drug-free PNP Jan 02, 2023 Dec 31, 2025
Warrant) and users through search warrant

Anti-Illegal Drugs Campaign (IEC on RA Educated the community through IEC on


PNP, MSWDO Jan 02, 2023 Dec 31, 2025
9165) RA 9165

Anti Illegal Drugs Campaign (Drug Clearing


PNP, MSWDO Jan 02, 2023 Dec 31, 2025 All barangays were drug cleared
Operation)

11. POPS Issue: Presence of Illegal, Unreported and Unregulated Fishing (IUUF)
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Number of Bantay Operationalization of Bantay Dagat Operationalization of Bantay Dagat (Hiring of Sufficient number of Bantay
Dagat and other 27 (Hiring of Project Implementer, Patrol Project Implementer, Patrol Boat Operator and MAO/MENRO Jan 02, 2023 Dec 31, 2025 Dagat and other personnel
personnel hired Boat Operator and Bantay Dagat Bantay Dagat) hired

Amount allocated for Sufficient amount allocated


Operationalization of Bantay Dagat Operationalization of Bantay Dagat
the Operation of 150000 MAO Jan 02, 2023 Dec 31, 2025 for the Operation of Bantay
(Mobilization of Bantay Dagat) (Mobilization of Bantay Dagat)
Bantay Dagat Dagat

Campaign Against Illegal Fishing (Conduct Decrease in number of IUUF


PNP Jan 02, 2023 Dec 31, 2025
Seaborne Operation) cases
Number of IUUF cases 0 Campaign Against Illegal Fishing
Campaign Against Illegal Fishing (Filing of
PNP Jan 02, 2023 Dec 31, 2025 All IUUF cases filed
Case/Court Hearing)

Page 5
Critical Policies, Programs, Projects, Services and Activities

12. POPS Issue: Presence of illegal fishing in the municipal water


Objective: Objective
Indicator Target Strategy Title of PPSAs Office(r) Primary Responsible Start Date of Implementation Completion Date of Implementation Expected Output

13. POPS Issue: Presence of stray dogs and other animals that might be carriers of rabies
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Number of hired Animal At least 1 per Rabies Contol (Hiring of One (1) Rabies Control (Hiring of One (1) at least One (1) Animal
MAO Jan 02, 2023 Dec 31, 2025
Vaccinator/Dog Catcher year Dog Vaccinator/Catcher) Dog Vaccinator/Catcher) Vaccinator/Dog Catcher hired

Allocated amount for the Allocated sufficient amount for


15000 per Rabies Control (Supplies and Rabies Control Program (Supplies
operation of Rabies Control MAO Jan 02, 2023 Dec 31, 2025 the operation of Rabies Control
year Materials) and Materials)
Program Program

14. POPS Issue: Need of IT equipment for the implementation of CDRA


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Procurement of Disaster Response and Procurement of Disaster Response and


Number of IT equipment Procured IT equipment for
Rescue Equipment and other Rescue Equipment and other
for the implementation of 1 MDRRMO Jan 02, 2023 Dec 31, 2025 the implementation of
Equipage/Materials for Natural and Man- Equipage/Materials for Natural and Man-
CDRA CRDA
Made Calamities Made Calamities

15. POPS Issue: Need of LGU personnel to support and implement peace and order and public safety program of the municipality
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Number of LGU personnel hired PEACE AND ORDER PEACE AND ORDER 1 LGU personnel hired to support
to support and implement peace PROGRAM AND PUBLIC PROGRAM AND PUBLIC and implement peace and order
1 MO Jan 02, 2023 Dec 31, 2025
and order and public safety SAFETY PROGRAM (Hiring of SAFETY PROGRAM (Hiring of and public safety program of the
program of the municipality One (1) Program Coordinator) One (1) Program Coordinator) municipality

Page 6
Critical Policies, Programs, Projects, Services and Activities

16. POPS Issue: Need of financial assistance for the operation of POC Secretariat
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

PEACE AND ORDER AND PUBLIC PEACE AND ORDER AND PUBLIC
Amount allocated for Sufficient amount
10000 per SAFETY PROGRAM (Financial SAFETY PROGRAM (Financial
the operation of POC MO, MPOC Secretariat Jan 02, 2023 Dec 31, 2025 allocated for the operation
year Assistance to POC Secretariat from Assistance to POC Secretariat from
Secretariat of POC Secretariat
the Office of POC Chairperson) the Office of POC Chairperson)

17. POPS Issue: Need Fuel, Oil and Lubricants for Patrolling, Monitoring, Case Filing, and IEC of different in-line agencies
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Amount allocated for Fuel, Oil PEACE AND ORDER AND PEACE AND ORDER AND Sufficient amount allocated for
and Lubricants for Patrolling, PUBLIC SAFETY PROGRAM PUBLIC SAFETY PROGRAM Fuel, Oil and Lubricants for
50000 per
Monitoring, Case Filing, and (Fuel, Oil and Lubricants (Fuel, Oil and Lubricants Expense MO Jan 02, 2023 Dec 31, 2025 Patrolling, Monitoring, Case
year
IEC of different in-line Expense for Patrolling, for Patrolling, Monitoring, Case Filing, and IEC of different in-line
agencies Monitoring, Case Filing, and IEC) Filing, and IEC) agencies

18. POPS Issue: Need for Intelligence Fund/Confidential Fund


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

PEACE AND ORDER AND PEACE AND ORDER AND


Amount allocated for Amount allocated for
50000 per PUBLIC SAFETY PROGRAM PUBLIC SAFETY PROGRAM
Intelligence MO, MPOC Jan 02, 2023 Dec 31, 2025 Intelligence Fund/Confidential
year (Intelligence Fund/Confidential (Intelligence Fund/Confidential
Fund/Confidential Fund Fund
Fund) Fund)

Page 7
Critical Policies, Programs, Projects, Services and Activities

19. POPS Issue: Need of billboards for the posting of peace and order and public safety laws and Ordinances
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

PEACE AND ORDER AND PUBLIC PEACE AND ORDER AND PUBLIC
Number of billboards 5 billboards containing peace
SAFETY PROGRAM (Posting of SAFETY PROGRAM (Posting of
containing peace and order and order and public safety
5 per year Billboards Containing Peace and Billboards Containing Peace and MO Jan 02, 2023 Dec 31, 2025
and public safety laws and laws and ordinances posted
Order and Public Safety Law and Order and Public Safety Law and
ordinances posted per year
Ordinances) Ordinances)

20. POPS Issue: Prevalence of unlicensed drivers


Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

200 persons attended LGU Del Gallego Free Conducted Two (2)
Number of drivers Conduct of Theoretical
Theoretical Driving Course Theoretical Driving Course MO, TESDA, CTEC Jan 02, 2023 Dec 31, 2025 Theoretical Driving Course
without license Driving Course
(TDC) per year (TDC) annually

21. POPS Issue: Need of monitoring systems during hazards and weather disturbances such as installation of communication systems, rain and water level
monitoring devices, signages, CCTV, and others to effectively and efficiently manage the impacts of disaster
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Real-time and end-to-end


Number of Multi-Hazard
Multi-Hazard Community-based Multi-Hazard Community-based monitoring and response
Community-based Early Warning x MDRRMO Jan 02, 2023 Dec 31, 2025
Early Warning System (EWS) Early Warning System (EWS) during hazards and weather
System (EWS) installed
disturbances

Page 8
Critical Policies, Programs, Projects, Services and Activities

22. POPS Issue: Need for improvement of drainage system in the poblacion area
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Number of constructed,
improve or rehabilitated Construction/Improvement of Drainage Improvement of Constructed/improved/rehabilitated drainage
1 MDRRM, MEO Jan 02, 2023 Dec 31, 2025
drainage canal in System in the municipality Drainage System system in the flood prone areas
poblacion area

23. POPS Issue: Need for enhancement and updating of the Municipal DRRM Plan, Contingency Plan, Local Climate Change Action Plan, Response Plan
and Public Safety Continuity Plan
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Percentage of disaster risk reduction Enhancement and Updating of the


and management related plan Risk centered Municipal DRRM Plan,
LGU is equipped and
updated (MDRRM Plan, Contingency 100% of MDRRRM related municipal and Contingency Plan, Local Climate
MDRRM Jan 02, 2023 Dec 31, 2025 guided by DRRM
Plan (CP), Local Climate Change plans updated/enhanced sectoral policies, Change Action Plan, Response
related plans
Action Plan, Response Plan and plans, and budget Plan and Public Safety Continuity
Public Safety Continuity Plan Plan

24. POPS Issue: Need to maintain drainage system, rivers, streams, and other parts of the community that may cause flooding.
Objective: Obejctive
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Drainage systems, rivers, and streams


Number of clean-up and 10 clean-up and flood Community clean-up Community Clean-up and
were in good condition and other flood
flood prevention prevention activities and flood prevention Flood Prevention MDRRMO Jan 02, 2023 Dec 31, 2025
prevention activities were
activities conducted conducted per year activities Activities
implemented successfully

Page 9
Critical Policies, Programs, Projects, Services and Activities

25. POPS Issue: Need to enhance skills and knowledge of DRRM, LGU and other stakeholders to disaster preparedness
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Capacity Development of Del Gallego Capacity Development of DRRM Officers,


Disaster Officers, Responders and MDRRM Jan 02, 2023 Dec 31, 2025 Responders, and other stakeholder
stakeholders successfully conducted

Conduct of Multi-Hazard Simulation Quarterly simulation exercise and drill


100% of PPSA's of MDRRM/BFP Jan 02, 2023 Dec 31, 2025
LGU implemented and Drills conducted successfully
LGU on Disaster Disaster
MDRRM Disaster
Preparedness Program Preparedness
Preparedness Stockpiling of Food and Non-Food Food and non-food items available for the
were successfully Program MDRRM, MSWDO Jan 02, 2023 Dec 31, 2025
Program Items residents of Del Gallego
implemented
Strengthening capacities to respond to
MDRRMO were equipped with skills and
various natural, man-made calamities
MDRRM Jan 02, 2023 Dec 31, 2025 knowledge to respond to calamities and
and epidemics or complex health
epidemics or complex health emergencies
emergencies

26. POPS Issue: Need for efficient disaster response and early recovery program
Objective: Objective
Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Office(r) Primary Responsible Expected Output
Implementation Implementation

Functional ICS/Activation of EOC on site for


Activation of Emergency Operation
natural, man-made, epidemic and health related
Center (EOC)/Incident Management MDRRMO Jan 02, 2023 Dec 31, 2025
disaster such as Covid, Earthquake, and
LGU effectively Disaster Team (IMT)
Typhoons
implemented Disaster Response and
100%
Response and Early Early Recovery
Presence of basic health services including
Recovery, if necessary Program Provision of Basic Services for
logistical, supplies, medicines and other
Evacuation Camp and Communities MDRRO/MSWDO/MHO Jan 02, 2023 Dec 31, 2025
requirements in response any calamities that the
Affected by Calammity
municipality is experiencing

Page 10
Critical Policies, Programs, Projects, Services and Activities

27. POPS Issue: Need for additional financial assistance to the BFP for Oplan Ligtas na Pamayanan
Objective: Objective
Office(r) Primary Start Date of Completion Date of
Indicator Target Strategy Title of PPSAs Expected Output
Responsible Implementation Implementation

Amount allocated for the Oplan Sufficient amount allocated for the
Aid to National Line Oplan Ligtas na
Ligtas na Pamayanan Program 100000 per year MO, BFP Jan 02, 2023 Dec 31, 2025 Oplan Ligtas na Pamayanan of
Agencies - BFP Pamayanan
of the BFP the BFP