Lifting Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Job

Description: Date:
Name of Job
Lifting
Type of Crane ( Crawler / Tyre)
Crane Rated Capacity in MT
Crane Main Boom length in Mtr. (L)
Crane Luffing Boom Length in Mtr. (L1)
Crane Boom angle (B)
R

Lifting Height in Mtrs (H)


Lifting Radius
Crane Operating
Radius in Mtrs (R}Positioning Radius
C/o-Dalmia
W
Crane Capacity as per load chart

Ayoki SWL as per load chart (@80% ofCrane capacity)


Cement
wt.of Material to be lifted (w1)
Cersbol
Bharat
LIFTING
|wt. of lifting Hook in MT (w2)
H
Wt. Erectors
of sling,D-Shackle etc (w3)
Ltd.,
PLAN
wt. of the chain pulley block (w4)
Pvt.
Total weight to be lifted W =w1+w2+w3+w4
Rajgangpur
Ltd.
Note/Comments: |Wire rope sling capacity
Slings Position - Vertical/ Choker/ Basket/ 60
(Odisha)
deg/45deg
Slings Qty- Nos
D-Shackle capacity/ Nos.
(Nos. of lifting legs provided

Out rigger Position- full open/ partial open (Tyre


mounted Crane)
Out rigger positioned on Pad plate/wooden
sleepers

Prepared By (Name &Sign) Authorised By( Name &Sign) Approved By(Name &Sign) Tailing

You might also like