Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Contract J105 - Design and Construction of JS6 Station, JS7 Station & Viaduct for Jurong Region Line

J105 CONCRETE CUBE COMPRESSION TEST RECORD FORM


PROJECT Contract J105 - Design and Construction of JS6 Station, JS7 Station & Viaduct for Jurong Region Line

Structural Element: G08 Crosshead


Concrete Grade: G50
Concrete Supplier: Pan United Concrete Report Number: CRCC11 -J105-QC-

COMPRESSION AVERAGE STRENGTH


Cube Reference No. Casting Date Test Date Maximum Load (kN) REMARKS
STRENGTH (N/mm 2) (N/mm 2)

J105/CH/157-13 30/12/2022 16/1/2023

J105/CH/157-19 30/12/2022 16/1/2023

Test By: (CRCC11) Witnessed By: Checked by:

Name:

Signature:

Date:

You might also like