Name of Program or Institutionalizing the operation of the Proposed Upgraded Slaughterhouse and Providing Funds

Project Thereof

Slaughterhouse assists animal owners availing the services of the slaughterhouse pay the corresponding
Brief Description
slaughter fees in accordance with the rate prescribed by the City of Tabaco Market Code.

Program or Project
Operation of the Proposed Upgraded Slaughterhouse and Providing Funds
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Operation of the Proposed Upgraded Slaughterhouse and Providing Funds
The Slaughterhouse implements the proper slaughtering of livestock for human consumption. It is the
only division that produces finish product that is clearly subjected to scrutiny of public being served on a
daily basis.
Justification
The Slaughterhouse assists in stabilizing the finances of the City Government through an efficient
collection and management program of the Slaughterhouse and to assist in maintaining the supply of
meat through mechanized and sanitary processes.

Intended Entire Barangay of the City


Beneficiaries Livestock Business Owners

Program or Project Total Project Duration


Term Operation of the Proposed Upgraded Slaughterhouse and Providing Funds
Better facilites in terms of sanitary and equipments
Target Output(s) and
Success Indicator(s)

In meat plants, food safety risks come in three categories: microbiological, chemical, and physical. These
Possible Risks three categories essentially cover all the risks associated with slaughtering.

The best way to reduce this risk is to keep the building properly maintained, replace broken windows, and
remove wood where possible from the facility. Programs like preventative maintenance, regular
Risk Mitigation
inspections, and adherence to regulations will go a long way to ensuring
that products remain free of hazards.

Expected
Slaughter process in the city has vastly improved due to the operation of the new and upgraded
Stakeholder's
slaughterhouse. Hog business owner will be provided with better service.
Response
Installation of standard road safety signages devices; parking signages; street names;
Name of Program or
informative/ directional reflectorized signages; traffic management control and IEC on
Project
rules and regulations.

These guidelines set out procedures for the installation and maintenance of road safety signa
Brief Description
and their supporting structures.

Program or Project
Improvement of Traffic Management Control System
Components

Proponents CEO, CPDO


Total Estimated Cost
Estimated Cost
Improvement of Traffic Management Control System

Automobile movements and highway traffic can be hazardous and when not managed thorou
Justification risk of fatalities and injuries to the public. Road traffic signs can provide essential information,
and warnings to reduce the risk of accidents.

Intended
Travellers accessing roads in the city proper of Tabaco
Beneficiaries

Program or Project Total Project Duration


Term Improvement of Traffic Management Control System
Traffic signs are helpful in making the roads safer and in lessening the amount of traffic. Atten
Target Output(s) and
benefit the most from these signs that detail one way streets, speed limits, no entry points an
Success Indicator(s)
signs or symbols that are posted along roads, streets, and highways.
Possible Risks Road Accidents
Risk Mitigation Provision of road signages
Expected
Stakeholder's Better road navigation and additional safety precautions were provided.
Response
arking signages; street names;
anagement control and IEC on traffic

maintenance of road safety signages

s and when not managed thoroughly pose a


an provide essential information, instructions

sening the amount of traffic. Attentive drivers


, speed limits, no entry points and other
ghways.

e provided.
Name of Program or
Establishment of impounding area for illegally parking and stalled vehicles such as pa
Project

Vehicle impoundment is the legal process of placing a vehicle into an impoundment lot or tow
Brief Description
is a holding place for cars until they are placed back in the control of the owner.

Program or Project
Establishment of impounding area for illegally parking and stalled vehicles such as padyak.
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Establishment of Impounding Area

The benefit of investing on establishment of area for impounded vehicles is for their process o
Justification impoundment to be organized. One specifc area will be provided for the holding place only of
before being claimed back by the owner.

Intended
The handling process of the situation of the PSO of the city will be the primary target of this p
Beneficiaries
Program or Project Total Project Duration
Term Establishment of Impounding Area

Target Output(s) and


Better or organized impounding process will be implemented.
Success Indicator(s)

Possible Risks Disorganized area of the impounded vehicles


Risk Mitigation Provision of a designated area for such purpose
Expected
Properly organized process of impounding by providing designated area will improve the serv
Stakeholder's
by the public safety officers of the city to the people involve in such event.
Response
nd stalled vehicles such as padyak.

e into an impoundment lot or tow yard, which


ontrol of the owner.

alled vehicles such as padyak.

ded vehicles is for their process of post-


ided for the holding place only of the vehicles

will be the primary target of this project.

gnated area will improve the service provided


n such event.
Name of Program or Construction/ Widening of permanent bridge structures and replacement of weak bridg
Project on DPWH Standards

Bridges, which are vital part of the national road network, are classified into two types of struc
Brief Description permanent and temporary bridges. The composition of permanent bridgestructures are concr
steel bridges while temporary bridge structures are bailey andtimber

Program or Project
Improvement/ Rehabilitation of Bridges based on DPWH Standards
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Improvement/ Rehabilitation of Bridges based on DPWH Standards

In line with the thrust of the national government to improve the quality of roads and bridgesn
and spur the economic development from the urban to the rural areas of thecountry, the DPW
developed programs to improve the quality of the national roadnetwork. Part of these program
Justification the asset preservation and network development ofthe national bridges. The asset preservati
includes the routine and majormaintenance and rehabilitation/reconstruction of bridges while
developmentprogram is comprised of the upgrading, replacing and constructing of new bridge
alongnational roads

Intended
Intended beneficiaries are the daily commuters and drivers going in and out of the city.
Beneficiaries

Program or Project Total Project Duration


Term Improvement/ Rehabilitation of Bridges based on DPWH Standards
Target Output(s) and Better access on bridges in the City
Success Indicator(s)
Possible Risks During project implementation, road re-detour and traffic management may be encountered
Risk Mitigation Having a well-prepared plan before project implementation on resolving possible traffic issues
Expected When a bridge is built it might cause you initial problems but later, big transports can use it, s
Stakeholder's less accident, fewer traffic jams, and less pollution. Even in case of passing of any ambulanc
Response play a significant role. Bridges have different routes. This way it is easy to reach in time.
and replacement of weak bridges based

e classified into two types of structures,


anent bridgestructures are concrete and
dtimber

ndards

ndards

the quality of roads and bridgesnationwide


ural areas of thecountry, the DPWH has
adnetwork. Part of these programs includes
nal bridges. The asset preservation program
n/reconstruction of bridges while the network
ng and constructing of new bridges

going in and out of the city.

ndards

nagement may be encountered


n resolving possible traffic issues.
later, big transports can use it, so there are
case of passing of any ambulance bridges
y it is easy to reach in time.
Name of Program or Establsihed/ Construction/ Widening/ Rehabilitation/ Improvement of Roads including
Project by-pass roads based on the DPWH standards to decongest traffic

It is a road or highway that avoids or "bypasses" a built-up area, town, or village, to let throug
Brief Description without interference from local traffic, to reduce congestion in the built-up area, and to improv
safety.

Program or Project Establsihed/ Construction/ Widening/ Rehabilitation/ Improvement of Roads including Alterna
Components Roads
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost Establsihed/ Construction/ Widening/ Rehabilitation/ Improvement of
Roads including Alternate/ By-pass Roads

Highway improvements such as bypass construction typically are motivated by a desire to im


Justification flow and safety of travel. But, given the importance of travel, transportation improvement proj
can affect the local economy and quality of life. This study assesses these potential impacts.

Intended The people of the city and adjacent cities will benefit the improved road access result of wide
Beneficiaries improvement of roads.

Total Project Duration


Program or Project
Term Establsihed/ Construction/ Widening/ Rehabilitation/ Improvement of
Roads including Alternate/ Bypass Roads
Target Output(s) and Lessen or decongests the heavy traffic in the city
Success Indicator(s)
Possible Risks Possible traffic during project implementation(one-way access)
Risk Mitigation Having better traffic management plan before porject implementation.
Expected
This project will improve the socio-economic status in the area and boost tourism industry in t
Stakeholder's
Accessibility benefits related to improved road access
Response
provement of Roads including alternate/
est traffic

rea, town, or village, to let through traffic flow


n the built-up area, and to improve road

ement of Roads including Alternate/ Bypass

y are motivated by a desire to improve the


transportation improvement projects often
ssesses these potential impacts.

roved road access result of widening and

ss)
mentation.

ea and boost tourism industry in the city.


Name of Program or Construction of overpass/ pedestrian bridge near school and with widen roads (Nation
Project with existing 4 lanes road)

Pedestrian bridges are structures built over roads that require people to take longer, often ina
routes up and over many lanes of car traffic, without impeding the speed or movement of veh
Brief Description
Proponents of these structures argue that these bridges are made for the safety of pedestrian
moving pedestrians out of the way of speeding cars.

Program or Project
Construction of Overpass/ Pedestrian Bridge near School areas
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Construction of Overpass/ Pedestrian Bridge

Pedestrians are one of the most vulnerable groups in traffic accidents. One of the major solut
Justification
pedestrian safety is the use or provision of pedestrian overpasses throughout the city.

Intended
Parents, students/ pupil will mostly benefit on the construction of overpass bridge.
Beneficiaries

Program or Project Total Project Duration


Term Construction of Overpass/ Pedestrian Bridge
Target Output(s) and Pedestrian related accident will be lessen
Success Indicator(s)
Possible Risks Not all school will be provided with such facilites for this project program.
Risk Mitigation Allocating more funds next project in order for more school to benefit with such program.
Expected
People will be ensured with safety when crossing pedestrians since they will be accessing pe
Stakeholder's
bridge and will more likely will lessen accidents.
Response
l and with widen roads (National Road

e people to take longer, often inaccessible


g the speed or movement of vehicular traffic.
made for the safety of pedestrians, by

eas

accidents. One of the major solution for


asses throughout the city.

n of overpass bridge.

ect program.
o benefit with such program.

s since they will be accessing pedestrian


Name of Program or
Replacement and Construction of new waiting shed with solar powered lights
Project

Waiting Shed is a small structure built mostly alongside roads that serves as a place for peop
Brief Description for a ride. It is important to have a waiting shed on roadsides for commuters waiting for jeepn
or any public vehicles.

Program or Project
Construction of New Waiting Shed
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Construction of New Waiting Shed

Providing waiting shed is a big boost for the convenience of the commuters of the city. With t
Justification or having it solar powered will contribute to the safety and security of the people at the same
lessen the electricity comsumption.

Intended
Daily commuters of the city will be the main target benificiaries of the program.
Beneficiaries

Program or Project Total Project Duration


Term Construction of New Waiting Shed

Target Output(s) and Additional safety during night for the commuters and at the same time will lessen the power c
Success Indicator(s) of the city with the utilization of solar powered facility.

Possible Risks Maintenance of the solar panel batteries on the long run.
Risk Mitigation The city providing daily or timely inspection and maintenance of the panels.
Expected
Stakeholder's Commuters will be provided with additional security during night time while waiting for their rid
Response
h solar powered lights

s that serves as a place for people waiting


for commuters waiting for jeepneys, buses

the commuters of the city. With the addition


ecurity of the people at the same time will

es of the program.

ame time will lessen the power consumption

e of the panels.

ght time while waiting for their ride.


Name of Program or Establishment of passenger terminal/ waiting area with complete facilities. (for motoriz
Project padyak)

Waiting area is a small structure built mostly alongside roads that serves as a place for peopl
Brief Description a ride. It is important to have a waiting shed on roadsides for commuters waiting for motorize
and paydak. It can provide shelter from rain or from a very sunny weather.

Program or Project
Establishment of passenger terminal/ waiting area
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Establishment of passenger terminal/ waiting area

Terminals continually strive to improve customer experience as passengers are demanding h


Justification of service. Providing a comfortable experience for passengers waiting in gate areas is a prior
terminal as waiting, even for very short periods, is an inevitable part of the passenger journey

Intended
Daily commuters of the city will be the main target benificiaries of the program.
Beneficiaries
Program or Project Total Project Duration
Term Establishment of passenger terminal/ waiting area
Positive response from commuters and terminal passenger on their daily experience.
Target Output(s) and
Success Indicator(s)

Insufficient allocated funds to provide the needed number of waiting area facilities for the sati
Possible Risks
the passengers.
Risk Mitigation Additional waiting area should be provided on the next project by providing additional funds.
Expected
Commuters/ passengers in the terminal will have a improved convience while waiting for their
Stakeholder's
to their destination.
Response
complete facilities. (for motorized and

s that serves as a place for people waiting for


commuters waiting for motorized vehicle
unny weather.

as passengers are demanding higher levels


rs waiting in gate areas is a priority for
ble part of the passenger journey.

es of the program.

on their daily experience.

waiting area facilities for the satisfaction of

ct by providing additional funds.

convience while waiting for their ride going


Name of Program or
Construction of covered walk and waiting area (for buses, jeeps and vans)
Project

Covered walkways serve a dual purpose, protecting site users from adverse weather conditio
Brief Description providing clearly defined access routes to connect buildings. These structures help promote p
across sites, creating a safer and more pleasant environment.

Program or Project
Construction of Covered Walk and Waiting Area
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Construction of Covered Walk and Waiting Area

The benefits of covered walkways are endless. Covered walkways are a necessary addition t
Justification business because they create an area that protects those people walking into your business
elements such as rain, and UV rays.

Intended
Daily commuters will mostly benefit on this project.
Beneficiaries

Program or Project Total Project Duration


Term Construction of Covered Walk and Waiting Area

Target Output(s) and


Better service on the commuters by providing better facilities such as waiting area and covere
Success Indicator(s)

Inadequate funds to fully provide such facility to all targeted area that needed waiting area an
Possible Risks
walk.
Risk Mitigation Providing sufficient funds next project to fully meet all projected area that needed such servic
Expected
Comfort and protection against the extreme hot weather for the commuters will be seen post-
Stakeholder's
of the project.
Response
s, jeeps and vans)

rs from adverse weather conditions while


These structures help promote people flow
nt.

kways are a necessary addition to any


eople walking into your business from natural

such as waiting area and covered walk.

area that needed waiting area and covered

ed area that needed such service.

he commuters will be seen post-construction


Name of Program or Construction/ Rehabilitation/ Improvement of Ports at Barangay Rawis, Hacienda, F
Project Roque Seaports

Ports enable trade and cheaper freight movement across waters, and their development i
investment. Port infrastructure plays a key role in a city’s trade and economy.
Brief Description Port construction projects dashboard provides overview of the global port construction act
construction project value and volume by country, and momentum index for global port co
projects.

Program or Project Construction/ Rehabilitation/ Improvement of Ports at Barangay Rawis, Hacienda, Fatima
Components Seaports
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Construction/ Rehabilitation/ Improvement of Seaports

The concept of sustainability and productivity in ports requires a simultaneous pursuit of


economic prosperity, environmental quality and social responsibility. In the shipping and p
Justification industries, with broadened port functions as an economic catalyst for revenue and employ
and a central position for industries related to international trade, economic stability and c
responsibility issues may shed new light on port operations.

Intended For most part of this project, people from San Miguel Island will mostly benefit from this pr
Beneficiaries will be provided with better port facilities.

Program or Project Total Project Duration


Term Construction/ Rehabilitation/ Improvement of Seaports
Target Output(s) and Improved pier/ seaports facilities in the City
Success Indicator(s)
For the rehabilitation, limited motorized banka ride may be seen because of the renovatio
Possible Risks
ports.
Provision of better contingency plan or planning ahead and such problems must be forsee
Risk Mitigation
plan ahead of the construcion phase,
Expected
Positive response will be receive from seafarers and residents from San Miguel Island sin
Stakeholder's
facilites will be provided for them.
Response
arangay Rawis, Hacienda, Fatima and San

aters, and their development involves huge


de and economy.
he global port construction activity, port
entum index for global port construction

gay Rawis, Hacienda, Fatima and San Roque

es a simultaneous pursuit of
nsibility. In the shipping and ports
talyst for revenue and employment
ade, economic stability and corporate

will mostly benefit from this project since they

een because of the renovation of the current

such problems must be forseen and have a

ts from San Miguel Island since better port


Name of Program or
Installation of CCTVs in strategic areas including island and Upland Barangays
Project

In recent past, there have been security concerns regarding theft and burglary in most our commercial
and residential places. This has led to development and installation of CCTV surveillance systems to
Brief Description
cub the menace. Moreover, these CCTV surveillance cameras need to be installed by skilled
personnel who are experienced in this field.
Program or Project
Installation of CCTV's on island and upland barangays
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Installation of CCTV's on island and upland barangays

CCTV systems are able to keep track of what is happening at the premises where they are installed.
Justification By monitoring the activity of workers and visitors at your business’ site, you and your workforce can
have total peace of mind about exactly what is going on under your roof.

Intended Workers/ Employees of the establishment will benefit in this project especialy their added security
Beneficiaries within the premises.

Program or Project Total Project Duration


Term Installation of CCTV's on island and upland barangays
Better security in the area
Target Output(s) and
Success Indicator(s)

Possible Risks Other areas that need such security service may not yet be provided.
Risk Mitigation Allocating funds for those area not included in this project program
Expected
Stakeholder's Guaranteed security for the constituents of the area will be provided.
Response
Name of Program or Construction of Public Safety and Security Command Center Building, complete with e
Project facilities and amenities

Having a security control and command center helps you have a central location for all your s
equipment, and, more importantly, a place where your security team can efficiently operate to
building safe. But when building a command center, there are many considerations to take in
Brief Description
While having a security control and command center is important, having an efficient one is ju
critical. Having the proper equipment, layout, and support is essential to having the best setu
needs.

Program or Project
Construction of Public Safety and Security Command Center Building
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Construction of Public Safety and Security Command Center Building

Security, centralized solutions and streamlined practices should be your top priorities. A secu
operations center centralizes essential security processes, so your organization has compreh
Justification
protection and threat detection response measures in place at all times. Whether you want to
particular network, location, building, or team of people, SOCs offer unmatched intelligence.

Intended The word public itself states that the majority of the public people of the city will benefit mostly
Beneficiaries program. Specially in providing them better security.

Total Project Duration


Program or Project
Term Construction of Public Safety and Security Command Center Building
Drastic improvement in monitoring the safety of the people in the premises.
Target Output(s) and
Success Indicator(s)

Possible Risks The scope of area covered by the security command center

If the area of scope is limited, additional fund may be allocated to improve more the service to
Risk Mitigation
provided by this facility

Expected
The constituents of the city will be more confident in their security compared before this proje
Stakeholder's
implemented because of the improved facility and service provided.
Response
enter Building, complete with equipments,

ve a central location for all your security


ity team can efficiently operate to keep your
e many considerations to take into account.
rtant, having an efficient one is just as
essential to having the best setup for your

r Building

uld be your top priorities. A security


o your organization has comprehensive
at all times. Whether you want to secure a
Cs offer unmatched intelligence.

eople of the city will benefit mostly in the

n the premises.

ed to improve more the service to be

curity compared before this project will be


ovided.
Name of Program or Installation and Upgrading of Free Wi-Fi at Public Places/ internet facilities/ IT infra fac
Project as IT Tower and System

This Project aims to accelerate the government’s efforts in enhancing Internet accessibility fo
Brief Description
accelerate economic, social and educational opportunities.
Program or Project
Installation and Upgrading of IT Infra Facilites
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Installation and Upgrading of IT Infra Facilites

Create public Wi-Fi zones for a number of reasons that revolve around economic developme
the ability to promote local businesses on a splash or landing page, the attractiveness of free
tourists, the fact that having this kind of connection “signals” to outsiders that a town is forwar
Justification
and, finally, the opportunity for those who might otherwise not be able to have the internet at
(whether this is because there is no option for a fast connection, or whether they simply cann
one) to access the internet from a broad area.

Intended
Numbers of citizen of the city who does not have the privilige to have access on the internet.
Beneficiaries

Program or Project Total Project Duration


Term Installation and Upgrading of IT Infra Facilites
Target Output(s) and One of the most interesting benefits of free Wi-Fi is that it encourages visitors to stay long
Success Indicator(s) establishment, which means they will take longer to discover and enjoy your products and
Possible Risks Not all remote areas or places cannot be installed with free wi-fi
Risk Mitigation Provision of plan the additional areas will be installed with free wifi next project.
Expected Public Wi-Fi is a great opportunity for governments to connect entire cities: smart cities deplo
Stakeholder's Wi-Fi are largely increasing and as a result, can effectively empower their communities with b
Response services.
s/ internet facilities/ IT infra facilities such

nhancing Internet accessibility for Filipinos to

ve around economic development, including


g page, the attractiveness of free Wi-Fi to
to outsiders that a town is forward thinking,
ot be able to have the internet at home
ion, or whether they simply cannot afford

e to have access on the internet.

encourages visitors to stay longer in your


ver and enjoy your products and services.
wi-fi
ee wifi next project.
ct entire cities: smart cities deploying free
mpower their communities with better
Name of Program or Preservation/ Conservation of the Historical Sites in Tabaco City such as "Bahay na Ba
Project "Cimburio" and "St. John the Baptist Church"

Rehabilitation acknowledges the need to alter or add to a historic property to meet continuing
Brief Description uses while retaining the property's historic character. Restoration depicts a property at a parti
of time in its history, while removing evidence of other periods.

Program or Project
Preservation/ Conservation of the Historical Sites in Tabaco Cty
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Preservation/ Conservation of the Historical Sites in Tabaco Cty

Cultural Heritage is more than just a petrified memory of the past that has a particular signific
in the life of the nation, it is also an active resource for the future. Reusing and valorizing it ch
the way we think about preservation. Since many of the listed buildings have outstanding land
Justification or picturesque values, it is essential that nothing is carried out that might impair these qualitie
Although precious cultural heritage resources are reusable, they are neither renewable nor re
This means that all interventions to modify buildings must involve minimal disturbance to both
buildings themselves and to their wider context.

Intended Church goers but to be in general, it's the City of Tabaco will be the beneficiary of this project
Beneficiaries project may result to the improvement of its tourism sector.

Program or Project Total Project Duration


Term Preservation/ Conservation of the Historical Sites in Tabaco Cty

Target Output(s) and


Hundred percent (100%) renovation or rehabilitation of the Historical Site
Success Indicator(s)

Original solutions in terms of shape and size, architectural style, construction, bearing structu
Possible Risks
materials, functionality, aesthetics, etc.
Risk Mitigation In order for the stated above to be restored accordingly, frequent project monitoring must be
Expected
Stakeholder's Not only does historic restoration benefit culture and education, but it also helps to boost the
Response
aco City such as "Bahay na Bato",

toric property to meet continuing or changing


ation depicts a property at a particular period
ds.

Cty

past that has a particular significance


ture. Reusing and valorizing it changes
d buildings have outstanding landscape
ut that might impair these qualities.
hey are neither renewable nor replaceable.
volve minimal disturbance to both the

be the beneficiary of this project since this

Historical Site

yle, construction, bearing structures,

uent project monitoring must be done

on, but it also helps to boost the economy.


Name of Program or
Rehabilitation/ Improvement of Mayon Planetarium and Mayon Skyline
Project

Nestled halfway on the slope of Mount Mayon is the famed Mayon Skyline View Deck also known as
Mayon Rest House. Formerly the bustling Mayon Skyline Hotel, its business operations have been halted
Brief Description due to the unpredictable outbursts of Mt. Mayon in recent decades, but the place has been preserved
and converted into a lovely nature park. It has a multi-purpose hall used for receptions and parties and
some recreational facilities.

Program or Project
Rehabilitation/ Improvement of Mayon Planetarium and Mayon Skyline
Components
Proponents CEO, CPDO
Total Estimated Cost
Estimated Cost
Rehabilitation/ Improvement of Mayon Planetarium and Mayon Skyline

The crisis is an opportunity to rethink tourism for the future. Tourism is at a crossroads and the measures
put in place today will shape the tourism of tomorrow. Governments need to consider the longer-term
Justification implications of the crisis, while capitalising on digitalisation, supporting the low carbon transition, and
promoting the structural transformation needed to build a stronger, more sustainable and resilient tourism
economy. One of the better option is to rehabilitate the Mayon Planetarium and Mayon Skyline.

Intended
The tourism sector of the city will be the main target beneficary of the project
Beneficiaries

Total Project Duration


Program or Project
Term Rehabilitation/ Improvement of Mayon Planetarium and Mayon Skyline
Improved economy in terms of tourism for the city
Target Output(s) and
More tuorist are coming to witness the beautiful scenery from the Mayon Skyline
Success Indicator(s)

During implementation, hauling of materials may be encountred. Fund allocated may be insufficient ot
Possible Risks
fully renovated or improve the building
Risk Mitigation Additional funds may be allocated for next implementation if needed.
Expected
Tourist from different places will leave a postive response in result of the completed project or
Stakeholder's
rehabilitation of the said structure.
Response