SECTION VIII TECHNICAL SPECIFICATIONS

All sections of Tender documents and Tender drawings shall complement each other. Any
discrepancy between various documents shall be studied and implemented as best for the project
and as per decision of PROJECT OFFICER /PMC, without any cost implication.
The Tenderer has to ensure that all the designs, drawings, specifications and other things are in
line with codal provisions applicable for the project and as per the requirements given by PROJECT
OFFICER /PMC.
If there is any variation in Design and Specifications between tender documents/drawings and any
of the statutory/standard’s requirement, then higher standard of specifications from either of them
shall be implemented in approval with PROJECT OFFICER /PMC. Nothing extra shall be payable
on any account.
It shall be responsibility of the Contractor to ensure that all works are carried out in full compliance
with the Employer’s requirements, System Requirements,
This Specification gives the project specific special requirements for the Construction of Commercial
Building, Chennai herein after referred to as the Works, except where otherwise modified or
amended within the Contract. Reference must be made to the General Specification for general
requirements and to the appropriate Technical Specification for the corresponding technical
requirements of all work.
The Specifications listed below have been added for guidance of the PROJECT OFFICER /PMC
responsible for carrying out the Works who shall however ensure that all aspects of the construction
of the Works shall comply with Local Standards, Laws and Regulations and accepted good practice
in India.

Contractor’s Responsibility
Apart from carrying out necessary surveying and setting out of the buildings and equipment
foundations wherever required collecting all materials, equipment, plant, labour, consumables, tools
and services necessary for proper execution, fabrication, ensuring quality control by conducting
required tests at the appropriate time and intervals during the execution, disposal of excavated
material as instructed, carrying out all associated works like removal, disposal of the debris, getting
out, remove temporary facilities on completion of the works, clearance from local bodies / authorities
for commissioning of all installation / equipment of the project work shall be obtained and furnished
before taking over of the completed work, all within the quoted rates only. Machinery operators,
drivers should have valid license.
Child labors are strictly prohibited. Top most attention shall be paid to the Health, safety of workers
and Environment and the same shall be monitored on daily basis by qualified and experienced
personnel in HSE.

Bidder’s Stamp & Initials Page 4 of 4