JOB SAFETY ANALYSIS PREPAR

ED
VERIFIED APPROVED

Sub-con Const. Safety PM/CM


Activities Manually Lover post erection (300kg)
Company DSHI Location ICT
Date 28-03-2023 / / / /

WORK PROCEDURE HAZARD&RISK RISK RISK CONTROL


(★)Low Risk.
(★★)Medium Risk.
(★★★)High Risk.

1. Shifting Lover post by 1 (★★) -Temporary lights are firmly fixed with clamps,
Crane. - While crane welding [L/L]
swinging the chain
sling hit the loose -Check fall prevention measures such as how to
installed connect (fix) joints while installing steel beams / heavy
facility/materials structural members [L/L] 

-Fall during shifting/ - Removal of obstacles / objects which are expected to


fall from height in collide / come in contact with the crane's lifting /
case of temporary rotation path in advance.(H/P)
bolting.
-Establishment of a plan for binding, transporting, and
-Over load Crane. loading methods according to the size, shape and
weight of the steel frame.
-Swing materials
-Control the access in material handling area.

- Nobody allowed under the suspended load.


- Lifting zone to the cordoned off with signage at the
entry.
- Tag line must control swing of load.

2. Arrange materials and - Falling support (★★★) - Manual lifting and installation load less than 20Kg
fixing. beam during with buddy system [L/L]
overhead installation.
-fixed 2 (two) webbing selling for fixing materials.
-Materials fall from
edge. -All hand tools properly Fixing by Lanyard.
-Ping point materials -We Install 3 (Three) lifeline before work & per lifeline
with human body. use 4 (Four) person.
-Hand tools fall from - Weight material will be controlled people to prevent
work area. entry to cordon off away.
-Human fall from -Full body harness must tie up properly with life line.
height.
-During fixing the lover post every people must be hold
by hand.

-Use proper PPE.


-Workers need to maintain constant awareness of their

feet in relation to objects being moved and avoid


(★★) placing them under materials.
3.Moving materials by hand
and/or with rock bars. -Foot or leg injuries.
-Finger or hand -It is recommended that workers use either rock
injuries.
bars or hand lifting techniques to minimize the
potential for injuries to hands. -If hands are
absolutely necessary in the presence of rock bars,
extreme caution and 100% communication with
other workers should follow.