SITE COORDINATION MEETING

S/N COMPANY WORKS INVOLVED SAFETY CONTROL MEASURE PERSON IN


CHARGE
1. GTM i. Cleaning paint Elimination: Nil RAMA WSHC
Engineering and cement Substitution:Scissors lift
stains on all PPE:Dust mask,Safety
utilities and harness,Safety goggles
machineries.
2. Veolia i. Preparation of  Ensure all fitting and
Hydro pressure couplings are properly
Testing of Pipes tightened.
(Hydro testing  Ensure all installed
pressure – 10 mechanical systems is in
bar). good working condition. RAMA WSHC
 Ensure the pressure Joan ng(Veolia)
gauge has been
calibrated and in good
working condition.
 Ensure that there is no
missing installation eg.
future main take off.
 Ensure all valves must be
temporarily tagged with
open close labels; check
for directional flow for
valve.
 Ensure all the end points
are capped / flanged
properly.
 Ensure the system of
pressurization is as per
the approved drawing.
3. Letic i. Testing and  Commissioning and
commissioning power turn work shall
of cables on DB have permit to work
panels,Lighting, system ("LIVE" panel
SSO ,Isolators permit) work supervisor,
LEW and GTM personnel
shall conduct through RAMA WSHC
and detailed physical KUMAR(Letic)
check before work is
allowed to proceed Live
panels.
 Prior to work
commencement, all
involved personnel shall
SITE COORDINATION MEETING
be thoroughly briefed on
the job and hazards.
 Workers shall be
adequately trained and
competent for the "Live
switch board work.
 Red soft Barricade work
area with proper warning
signages.
 Testing / power turn
on /off to electrical
system shall only be
undertaken by qualified
personnel (LEW)
 Supervisor and worker
are to double check,
verify and confirm the
circuit breakers and
communicate with LEW
personnel before
switching.
 Standby all necessary
tools and instruments
needed for the testing.
 Make sure that your
testing instruments are
working properly and
calibrated.

Meeting No: 04

Date : 27/02/2023

Minutes Recorded by: Approved by:


Ramarajan Muthu kumaran
WSHC Project Manager