BOQ FOR PROPOSED 5m RETAINING WALL

Table 1: Excavation
DESCRIPTION QTY UNIT RATE AMOUNT
EXCAVATION
per m run of Wall

Labour for excavation 54.6 m ₦4,000 ₦218,400.00


TOTAL ₦218,400.00

Table 2: Concreting
S/NO DESCRIPTION QTY UNIT RATE AMOUNT
CONCRETE WORK (Grade C20/25)
54.6 m run of Wall

Concrete 126 m3 ₦75,000.00 ₦9,450,000.00


Labour for casting Concrete - - ₦500,000.00
TOTAL ₦9,950,000.00

Table 3: Reinforcement
S/NO DESCRIPTION QTY UNIT RATE AMOUNT
REINFORCEMENT

12mm diameter 500 Len ₦5,000 ₦2,500,000.00

16mm diameter 250 pcs ₦8,500 ₦2,125,000.00


Binding wire 10 bag ₦15,0000 ₦150,000.00
Iron-bender on reinforcement 10,243 kg ₦60.00 ₦614,580.00
TOTAL ₦5,389,580.00

Table 3: Formwork
S/NO DESCRIPTION QTY UNIT RATE AMOUNT
FORM WORK

Boards (per 10m run of wall) 580 pcs ₦8,500 ₦4,930,000.00

Page | 1
BOQ FOR PROPOSED 5m RETAINING WALL

Carpenter on formwork 580 m2 ₦1000.00 ₦580,000.00


TOTAL ₦5,510,000.00

TOTAL COST OF RETAINING WALL ₦21,067,980.00