Zero Sprandel - ASTM 2307

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
Design No. HI/BPF 120-10 PERIMETER FIRE BARRIERS Firestop Joint Spray CFS-SP WB ASTM E 2307 Table 1. Firesiop Joint Siicone Jent Spray CFS-SP Spray CFS-SP WB Sk. F-Rating 2 Hour 2Hour T-Rating “4 Minute 45 Minule ‘oplcaion | Bin. wet fm 2mm (008 in) Thickness (1118. ay) wet fi Static Joint L-Rating <1.0 SCFMILF at Ambient Conditions HIBPF 120-09 Cosa) Hilti Firestop Systems Reproduced by HILT, Inc Courtesy of Intertek Group November 26, 2016 om fi NG Page: 1 of2 Design No. HI/BPF 120-10 HIBPF 120-10 1. CONCRETE FLOOR ASSEMBLY: 2 hour rated concrete floor assembly made rom ether ghtweigh or normal weight concrete wih a densty of 100 to 150 pct, having a mn, thickness of 6 in. at the joint face. When a longitudinal recess blockout is equied to contain an architectural joint system, increase coneret foo assembly thickness to maintain a min, thickness of 6 i. and accommodate depth of blockout formed in the concrete: blockout width unesticted 2. CURTAIN WALL ASSEMBLY: The curtain wall assembly shall incorporate the flowing constuction features: ‘Mounting Atachment (Not show): Atach aluminum framing em 28) the stuctral faming according to the curtain wall manufacturer's insrucons, Connect the mounting attachments to the joint face ofthe concrete for assembly item 1) according fo the curtain wal manufacturer’ instructons 8. Aluminum Framing: Use hollow rectangular alurinum extruded ting wth min, overall dimensions of 0.100 in thick, 4 nigh and 212 in wide, Locate muons (vertical aluminum framing) min. 60. o¢. Local the transom (horizontal aluminum framing) such that the bottom surface of the transom i atthe same height as the top surlace ofthe for assembly. ©. Glass Panels: Sized and installed into aluminum framing (lem 28) in accordance wit the curtain wall manufacturers insrucions. Use min ‘in, thick, clear, heat strengthened (HS) or tempered lass witha max, with and height ess than the aluminum framing (Item 28} oc spacing OC spacing shall alow alas fo be secured tothe aluminum framing (tem 28) between the notched shoulders. Secure glass panels wit a thermal break (rubber extrusion, pressure bar (aluninum extrusion), min 14-20 by 58 In. fog screws, anda snap face (aluminum extrusion) D. Aluminum Anchor Brackets (Not shown}: Use min. 1/2in thick aluminum anchor brackets to serve a pat ofthe mounting attachment (tem 2) rigidly secured tothe aluminum framing (em 28) andthe concrete Noor assembly (er 1 E., Galvanized Sheet Metal Pan: Atach 18 GA galvanized steel section fo the aluminum framing wth No, 10 selling sheet meal screws a "Zin, oc and to the concrete slab wih Hit Kwik HUS-EZ 1/4 in, x 178i, stel concrete anchors, also 12in. oc. The galvanized steel pan shal be formed such that has @ min. np for which fo secure the pan fo the aluminum framing, can contain min. 3 in thick min. 6 nal curtain vallinsultion (tem 2F), anda bottom leg long enough to overlap the concrete floor assembly min. in. to secure the pant the floor assembly (tem 1), Install 18 GA galvarized steel plates min. 4-12 in. in width, centered atthe aluminum malions such that there is continuous coverage below the ont. Install ili CFS-S SIL GG Fiestop Silicone along the edges of the meal pan that rein contac with the aluminum members of te curtain wall assembiy. F. Curtin Wall insulation: Filthe cavity ofthe metal pan (Item 2E) with nominal in thick, min 6 in tall, 8 pet densty, mineral wool bat insulation. Tih ff, compress atleast 8 in.in al drectons. Use only Intrtek cered products meeting the above min. requirements 3. PERIMETER JOINT PROTECTION: Do not exceed a 4n, nominal joint width (ont width at instalation}. Incorporate the flowing constuction features forthe perimeter joint protection (aso known as perimeter re baer system) ‘A Packing Material: Use only mineral woo! bearing an Intetekcertied product abel and meeting the fllowing min. requirements. inser min “Zin. long, min. 2n tl 4-pf density, mineral woo att insulaton packing material compressed int the jit to 25% into battom of pan centered at each malion, Use min. 4 in tal 4-pcf density, mineral woo att insulation and cut packing material with to achieve 25% compression when installed inthe nominal ont width and use no more than two adjacent sips. Istll insulation withthe fers running parallel fo the edge of concrete flor assembly (tem 1) and curtain wall assembly (lem ZA). Tighly compress together splices (tints) in the lengths of packing material by using mi. 14 in. comoression per piece of packing material. Use only ntertek certified products meeting the above min. requirements. Locate the top surface ofthe packing material fush with the top surface ofthe concrete floor assembly (tm 1). 8. CERTIFIED MANUFACTURER: Hil Corporaon CERTIFIED PRODUCT: Firestop Joint Spray CFS-SP WB or Siicone Joint Spray CFS-SP SIL Fil, oid, Cavity Material: Apply over he packing material (tem 3A) as discussed below. ‘Anply a the thickness specified in Table 1 and overap the material Zin. ono the adjacent curtain wall assembly and concrete for sad assembly, When the spraying process is lopped andthe applied liquid cures to an elastomeric fim before applications restarted, overlap the edge ofthe cured material atleast 18 i, wih the spray. Reference Product Section ofthe nterlek Directory for more details onthe Listed product. Reproduced by HILT, Inc Courtesy of Intertek Group vr November 24, 2015 Hilti Firestop Systems vember i 2of2

You might also like