Input
Project /
b rib (m) 0.15
h Block (m) 0.25
ts (m) 0.08
F.C (t/m2) 0.15
L.L (t/m2) 0.2
W bolck (ton) 0.01
L rib (m) 5
Ø (mm) 12
Fy (mpa) 420
Fcu (mpa) 25
AS mm2 201.78
AS mm2 201.78
RFT. 2 Ø
esign of one way hollow blocks slabs according
Project /
0.65
5m
0.68 0.68
B.M.D (t.m)
2.03
0.65
2.03
1.63
S.F.D (t)
01.78
01.78 1.63
12
s according to ECP 203 2018
ORTED SPAN
Input
Output
B.M.D (t.m)
S.F.D (t)
Input
Fy (mpa) 400
Fcu (mpa) 30
Wrib 0.65
Sec 1
Mu @ sec 1 1.67
c1 9.12
j 0.826
AS mm2 174.3
RFT
Sec 2
Mu @ sec 2 -2.52
c1 7.42
j 0.826
AS mm2 263
RFT
Sec 3
Mu @ sec 3 0.77
c1 13.42
j 0.826
AS mm2 104.5
RFT
Design of one way hollow block
CON
Project /
Input
Output
1.53
t/(m*s)
Sec 1
t.m
2 Ø 12
Sec 2
t.m
2 Ø 14
Sec 3
t.m
2 Ø 10
hollow blocks slabs according to ECP 203 2018
0.65 0.65
6m 5m
-2.52
1 2 3
1.67
0.77
1.53
2.13
2.37
2018
B.M.D (t.m)
S.F.D (t)
1.12
Design of one w
Input PROJECT /
b rib (m) 0.15
h Block (m) 0.25
ts (m) 0.08
F.C (t/m2)
L.L (t/m2)
0.15
0.2
Input
W bolck (ton) 0.01
L1 (m)
L2 (m)
6
5
Output
L3 (m) 4
Fy (mpa) 350
Fcu (mpa) 25
SEC 2
MU t m -2.27
C1 7.14
J 0.826
AS mm2 270.76
AS mm2 270.76
RFT 2
gn of one way hollow blocks slabs according t
OJECT /
nput
utput
1.79
1.57
Ø 14
cording to ECP 203 2018
SPAN
0.65
6M 5M
-2.27 -1.07
2 3
0.36
1.79
1.86
2.33 1.39
t/(m*s)
4M
-1.07
4 5 B.M.D (t.m)
0.77
1.57
S.F.D (t)
1.03
1.39
B.M.D (t.m)
S.F.D (t)
Input
b rib (m) 0.1
h Block (m) 0.2
ts (m) 0.05
Fy (mpa) 350
Fcu (mpa) 25
M -ve t.m 2.015
Moment - VE
R (t) 1.7
MR (t.m) 1.46
Rmax 0.198
Xm (m) 0.34
PROJECT /
0.05
0.2
0.1
Shear
qcu (N/mm2) 0.65
QR (t) 1.365
XQ (m) 0.64
T (m) 0.64
o ECP 203 2018
Input
0.25
0.4
Output
0.64
Input
Output