Cabinet (550W/750W)
Installation Manual
Version: MN160004ENA
May 2022
Thank you for choo
shown below.
Version Description
Manual version Description
A Initial version
Intended Readers
This manual is intended for the following readers:
◆ Construction personnel
◆ Electrical safety
◆ Mechanical engineering
◆ Communication equipment
Symbol Conventions
Symbol Refer to Meaning
I
Content
Foreword ............................................................................................................... I
Content ................................................................................................................. 1
6.2 Connect and Lay the Solar Power Supply Cable ............................. 24
Note:
Please observe the local safety regulations when performing various operations. The safety
precautions introduced in this manual only serve as a supplement to local safety codes.
Installation requirements
◆ The personnel responsible for installing the equipment must undergo strict
training, understand various safety precautions and master the correct operation
methods before installing the equipment.
◆ It is not allowed to operate the facilities of this project or enter the non-
construction areas of this project in the computer room. If there are special
requirements, the user's permission is required.
◆ During the installation, the operator should strictly follow the operation steps and
installation requirements.
◆ During the installation process, the operator should report the faults or errors
that may cause safety problems to the person in charge in time.
Grounding requirements
The following requirements are only for equipment that needs grounding:
◆ When installing the equipment, it must be grounded first. When dismantling the
equipment, finally dismantle the ground cable.
◆ Before turning on the power supply, the protective ground cable of the
equipment casing must be grounded firstly, and check whether the insulation
resistance and grounding resistance meet the specified values and whether the
power grounding of the equipment is in good condition.
Personal security
1
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
Caution:
FiberHome will not take any responsibility for the damage to individuals or equipment
caused by construction personnel's failure to operate according to the requirements
of this manual.
◆ It is forbidden to install or remove the power cord with electricity. Do not plug the
unplugged power cord directly into the socket.
◆ It is forbidden to look naked at the tail fiber section with both eyes to prevent the
laser beam from burning eyes. Wear safety glasses when necessary.
◆ During operation, tools should be insulated and protected, and tools (soldering
irons, etc.) should be used and placed correctly to avoid personal injury and
damage to equipment or circuit boards.
◆ In case of fire, evacuate the building or equipment area and press the fire alarm
bell or call the fire alarm. Under any circumstances, it is strictly forbidden to enter
the burning building again.
Equipment safety
◆ Before operation, the equipment should be reliably fixed on the floor or other
stable objects, such as walls or mounting brackets.
◆ In the process of moving or lifting the equipment, avoiding the collision between
the equipment and other hard objects.
◆ When installing the panel, if screws need to be tightened, tools must be used.
◆ After installing the equipment, please clear the empty packaging materials in the
equipment area.
2
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
◆ In order to avoid tipping over, please fasten the whole box firmly on the forklift
with ropes before moving, and personnel are required to take care of it when
moving.
◆ The cabinet must be moved carefully to avoid any impact or drop that may
damage the equipment.
◆ Try to move the equipment to the nearest place to the installation location before
unpacking. Be careful during unpacking to avoid scratching or bumping. Try not
to remove the equipment from the pallet before installation.
Drilling holes
◆ It is forbidden to drill holes on the cabinet by yourself. Drilling holes that do not
meet the requirements will destroy the electromagnetic shielding performance
of the cabinet and internal cables, and the metal chips generated by drilling
holes will enter the cabinet and cause short circuit of the circuit board.
◆ When drilling, we must strictly follow the drilling safety operation rules, confirm
the drilling position, size and depth before operation.
◆ When drilling, goggles should be worn to avoid eye injury caused by flying metal
3
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
scraps.
◆ After drilling, remove the generated scraps with tools in time, and it is forbidden
to take them by mouth.
◆ When using tools such as percussion drill, you should operate according to the
tool usage specification to avoid personal injury.
Sharp object
◆ When handling equipment by hand, wear protective gloves to avoid cutting your
hands by sharp corners of the equipment.
Fan
◆ When replacing parts, pay attention to put away parts, screws, tools and other
objects to avoid falling into the running fan and damaging the fan or equipment.
◆ When replacing the equipment around the fan, don't put your fingers or veneer
into the running fan before the fan is powered off and stopped running, so as to
avoid hurting your hands or damaging the equipment.
◆ When handling heavy objects, be prepared to bear the load to avoid being
crushed or sprained by heavy objects.
◆ When pulling the chassis out of the cabinet, be careful of the equipment that
may be unstable or heavy on the cabinet to avoid being crushed or bruised.
◆ Generally, it takes two people to carry the chassis. It is forbidden to carry the
heavy chassis alone. When handling the chassis, keep the back straight and
move smoothly to avoid sprain.
◆ When moving or lifting the chassis, you should hold the chassis handle or hold
the bottom edge of the chassis, instead of holding the handle of the installed
module in the chassis.
◆ Before using the ladder, check the specified load-bearing size of the ladder.
Overweight use is prohibited.
◆ The width of the ladder bottom shall not be less than 50cm, and anti-skid devices
shall be provided to prevent slipping.
◆ Make sure that the center of gravity does not deviate from the edge of the ladder
4
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
frame. Keep your body steady before operation to reduce danger and ensure
safety.
◆ The installation personnel should wear anti-skid shoes when climbing, and the
objects they carry with them should be firmly fixed to avoid the risk of falling or
collision.
◆ Personnel who are installed above the equipment should wear non-slip shoes
when working. It is forbidden to trample on cables and rack equipment during
operation. At the same time, the top of the cabinet should be protected, and no
engineering wastes such as metal scraps should fall on the top of the cabinet.
Warning:
The power supply voltage of the power system is hazardous voltage. Direct contact
or indirect contact with these parts through wet objects will bring fatal danger. Non-
standard and incorrect operation may cause accidents such as fire or electric shock.
◆ Irregular and incorrect high-voltage operation will cause accidents such as fire
or electric shock.
◆ If the sign of "Large Leakage Current" is affixed near the power terminal of the
equipment, the protective grounding terminal of the equipment case must be
grounded before connecting the AC input power supply to prevent the leakage
current of the equipment from causing electric shock to human body.
Power cord
◆ It is forbidden to install or remove the power cord with electricity. When the
power cord touches the conductor, it will produce electric arc or spark, which
may cause fire or eye injury.
◆ Before installing and removing the power cord, the power switch must be turned
off.
◆ Before connecting the power cord, you must confirm that the label of the power
cord is correct before connecting.
5
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
ESD requirement
◆ Static electricity generated by human body will damage static sensitive
components on single board.
◆ When people move, clothes rub, shoes rub against the floor or ordinary plastic
products are held by hand, the human body will generate electrostatic
electromagnetic field, which is not easy to disappear before discharge.
◆ Before touching the equipment, holding the single board or special integrated
circuit chip, etc., in order to prevent the sensitive components from being
damaged by human static electricity, you must wear an antistatic wrist strap,
and the other end of the antistatic wrist strap should be well grounded.
Warning:
Battery short circuit will produce a strong spike in current and release a large amount
of heat energy that may cause personal injury.
6
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
◆ The battery has a risk of electric shock and short circuit. To avoid accidents such
as electric shock and injury, please observe the following warnings when the
battery is installed and maintained:
➢ Please wear rubber shoes and gloves to disassemble and install the battery;
◆ Please do not throw the battery into the fire, which may cause an explosion and
endanger personal safety.
◆ Please do not short-circuit the positive and negative terminals of the battery,
which will lead to dangerous accidents such as electric shock or fire.
Warning:
During installation, maintenance and other operations, the solar photovoltaic module
shall be completely covered with opaque materials to prevent electric shock caused
by current.
It is forbidden to focus the sunlight directly on the module with a plane mirror or lens,
which may cause damage to the solar photovoltaic module and personal injury.
When handling components, do not lift the junction box and electrical cables.
7
A16 integrated direct air power cabinet (550W/750W) installation manual 1 Safety precautions
During the installation and maintenance of high support, the bracket platform must
be built and the safety helmet and safety belt must be worn.
It is forbidden to drill holes, step on and place heavy objects on the solar photovoltaic
components to prevent damage.
When handling and installing solar photovoltaic components, there should be at least
two people. The stress point is the aluminum frame of solar photovoltaic components.
It is forbidden to apply stress on the front or back of solar photovoltaic components
by overhead or other means, resulting in hidden cracks of solar cells.
8
2 Solution Introduction
Smart meter
48V embedded
power supply
system
Module
Inverter
Hall sensor
PDU
DC output
terminals
Photovoltaic
DC fuse
Air inlet
filter screen
9
A16 integrated direct air power cabinet (550W/750W) installation manual 2 Solution introduction
10
3 Installation Preparation
Note:
The pictures in this manual are only for reference of installation and maintenance.
Please refer to the actual received products.
Cross
Cable name Cable type Cable length
sectional area
Positive battery power
Red NYAF 4m 50mm2
cable
Negative battery power
Black NYAF 4m 50mm2
cable
Battery ground cable Yellow green RV - 6mm2
Battery cabinet ground
NYAF 6m 35mm2
cable
Battery communication Conventional standard
4m -
cable network cable (8-core)
Photovoltaic power cable PV DC cable pv1-f - 4mm2
Photovoltaic ground cable NYAF 6m 35mm2
11
A16 integrated direct air power cabinet (550W/750W) installation manual 3 Installation preparation
Protective
Marker pen Tape measure Levelling rod
gloves
Phillips
Angle square Standing ladder Flat screwdriver
screwdriver
Offset ring
Monkey wrench Wrench Socket Allen wrench
spanner
Needle nose
Diagonal pliers Crimping pliers Cable stripper
pliers
12
A16 integrated direct air power cabinet (550W/750W) installation manual 3 Installation preparation
Universal cutting
Hydraulic tongs Tramegger Wrist strap
pliers
Network cable
Pressure gage Multimeter Test pencil
tester
Heat-shrinkable
Brush Hacksaw Nylon tie
tubing
Resistance
Insulating tape measuring - -
instrument
- -
13
A16 integrated direct air power cabinet (550W/750W) installation manual 3 Installation preparation
Figure 3-1 Schematic diagram of cabinet installation space dimension (unit: mm)
Note:
➢ The installation point should not be close to trees or other plants, so as to avoid
insects being sucked in by the fan of the heat dissipation system and affecting
the normal operation of the equipment.
➢ The distance between the installation point and residents should be > 10m, for
reducing the impact of noise on the Residents. And the cabinet should face away
from the Residents.
14
A16 integrated direct air power cabinet (550W/750W) installation manual 3 Installation preparation
Solar power
supply cable Lithium battery
cable
Grounding
cable
Communication
cable
15
4 Cabinet installation
◆ During handling, do not drag the cabinet directly to avoid damaging the coating
on the bottom of the cabinet.
◆ During handling, attention should be paid to prevent the cabinet from tilting and
overturning, and operators should protect themselves.
Anchor bolt ×4
Cabinet
Concrete
plinth
Ground
Embedded
PVC tube
16
A16 integrated direct air power cabinet (550W/750W) installation manual 4 Cabinet installation
Note:
When all installation steps are completed, the cables are laid and checked, then the
cover plates should be covered again.
Note:
Before hoisting the cabinet, put some protective materials (e.g. sponge pad) between
the cabinet and the lifting rope to protect the cabinet from scratching.
Route the lifting rope through the bottom of the cabinet. Use the hoisting equipment
to lift the cabinet up. Adjust the position of the cabinet to align the mounting holes
with the anchor bolts in the concrete plinth. Place the cabinet carefully on the
concrete plinth.
17
A16 integrated direct air power cabinet (550W/750W) installation manual 4 Cabinet installation
18
A16 integrated direct air power cabinet (550W/750W) installation manual 4 Cabinet installation
Use a knife to cut open the sealing rubber at the cable hole at the bottom of the
cabinet. Pass the ground cable through the cable hole. Make an OT terminal for the
ground cable. The size requirements are shown in Figure 4-6.
Connect the ground cable to the M8 hole of the ground bar, as shown in Figure 4-7.
Note:
Measure the grounding resistance with a grounding resistance measuring instrument to ensure
that the grounding resistance is less than 10Ω.
19
A16 integrated direct air power cabinet (550W/750W) installation manual 4 Cabinet installation
◆ The connection points at both ends of the working grounding cable should
ensure good electrical contact, and do a good job in anti-corrosion and anti-rust
treatment.
◆ The grounding cable and signal cable shall not be parallel or intertwined to
reduce mutual interference.
20
5 Components Installation
Caution:
Do not put your hand into the module slot to avoid electric shock. Non-professional
maintenance personnel are not allowed to insert, remove, or replace the photovoltaic
module.
The mounting methods of the two kinds of modules are the same. Before mounting,
please make sure the module slot to be installed is matched with the module type.
2. Slowly push the module until its front panel is flush with the panel of the embedded
power supply system;
3. Fasten the screws on the front panel clockwise to lock the module.
21
6 Cable Connection and Laying
◆ The specification, route, section and position of laying cables shall comply with
the provisions of the construction drawing, and the laying of cables and the use
of ports shall be convenient for maintenance and future expansion.
◆ Cables must be arranged neatly, without damage to the skin, all kinds of cables
should not be pulled hard, and appropriate allowance should be left.
◆ The AC/DC power supply and signal cables should be arranged separately to
avoid being in the same harness. When it is impossible to avoid the same route,
the interval should be at least 5cm.
◆ All kinds of cables should not be bent excessively at the bend to protect the cable
from damage.
◆ The bending radius of the cable should be ≥ 5~10 times of the cable diameter.
◆ Including the ground cable, power cable should be in accordance with the
principle of shortest, according to the actual routing needs, on-site processing.
◆ The power cable must be made of the whole length of cable, with no connector
in the middle.
◆ The cables must be carefully tied up with cable ties, and the spacing between
the thread buckles should be kept even and the tightness should be moderate.
The bundled cables should be close to each other, the appearance should be
straight and neat, and cannot be entangled with each other, as shown in Figure
6-1.
22
A16 integrated direct air power cabinet (550W/750W) installation manual 6 Cable connection and laying
◆ The cable outlet of the plug shall be bundled in fan-shaped order, and the cable
shall not be wound, as shown in Figure 6-2.
Nylon tie
◆ The thread buckle shall be cut neatly without sharp angle. The buckle should be
in one direction as far as possible, as shown in Figure 6-3.
◆ When the bundled cables are bent, the binding tape should not be tied at the
turning point, otherwise the inner core may be broken. The binding method is
shown as Figure 6-4.
23
A16 integrated direct air power cabinet (550W/750W) installation manual 6 Cable connection and laying
Connect the tube type terminals onto the photovoltaic DC fuse, which has already
connected with the solar power input ends of the 48V embedded power supply
system before delivery.
Warning:
Before installing or removing the power cable, it is necessary to ensure that the
switch of the power supply system is off, and it is strictly forbidden to install or remove
the power cable with electricity.
24
A16 integrated direct air power cabinet (550W/750W) installation manual 6 Cable connection and laying
Warning:
Before installing or removing the battery cable, it is necessary to ensure that the
switch of the power supply system is off, and it is strictly forbidden to install or remove
the power cable with electricity.
25
A16 integrated direct air power cabinet (550W/750W) installation manual 6 Cable connection and laying
The communication cables connection diagram on FSU and 48V embedded power
supply system is shown as Figure 6-9 and Table 6-2. Please refer the Appendix A and B
for the specific connection terminals on 48V embedded power supply system and FSU.
26
A16 integrated direct air power cabinet (550W/750W) installation manual 6 Cable connection and laying
1
FSU without the
3 protective shield
Figure 6-9 Communication cables connection diagram on FSU and 48V embedded power
supply system
Table 6-2 Communication cable connection table
27
A16 integrated direct air power cabinet (550W/750W) installation manual 6 Cable connection and laying
28
7 Lithium Battery Installation
29
A16 integrated direct air power cabinet (550W/750W) installation manual 7 Lithium battery installation
7.3.1 Grounding
Unscrew the screw at the grounding hole on the battery panel, install the matching
yellow and green cable on the OT terminal, then wind it on the screw and tighten it
with a screwdriver.
Figure 7-3 Positive pole cable (red) and negative pole cable (black)
30
A16 integrated direct air power cabinet (550W/750W) installation manual 7 Lithium battery installation
31
A16 integrated direct air power cabinet (550W/750W) installation manual 7 Lithium battery installation
1 1 0 0 0 1
2 2 0 0 1 0
3 3 0 0 1 1
4 4 0 1 0 0
5 5 0 1 0 1
6 6 0 1 1 0
7 7 0 1 1 1
8 8 1 0 0 0
9 9 1 0 0 1
10 10 1 0 1 0
11 11 1 0 1 1
12 12 1 1 0 0
13 13 1 1 0 1
14 14 1 1 1 0
15 15 1 1 1 1
32
8 Photovoltaic Bracket Installation
Figure 8-1 Photovoltaic bracket appearance diagram (before and after installation of
photovoltaic panel)
33
A16 integrated direct air power cabinet (550W/750W) installation manual 8 Photovoltaic bracket installation
Items Descriptions
Hot dip galvanizing treatment of metal parts, the zinc layer
Surface treatment
thickness of the main frame shall not be less than 70μm;
and appearance
appearance is silvery white.
1. The main body of the front and rear columns is made of
section steel, 150×75×5×7;
2. The transverse support adopts aluminum profile guide rail;
Material 3. The fastening bolts, nuts, flat washers and spring washers
are made of stainless steel;
4. The strength grade of cement base concrete shall not be
lower than C30.
1. Supports the installation of 21(3×7) 330WP photovoltaic
panels;
2. The dimension of photovoltaic panel is 1956×992×40,
Function
unit: mm;
3. Angle between photovoltaic panel and horizontal plane is
10°.
Installation way Site installation of floor cement pile base
◆ The bolts of photovoltaic bracket shall be fastened reliably, and the key nodes
shall be fastened with double nuts;
2. Level the ground and pour concrete according to the overall size requirements
of photovoltaic support;
34
A16 integrated direct air power cabinet (550W/750W) installation manual 8 Photovoltaic bracket installation
Figure 8-2 Schematic diagram of ground pile column setting of photovoltaic bracket (unit:
mm)
Figure 8-3 Schematic diagram of photovoltaic bracket pile pouring (unit: mm)
Figure 8-4 Schematic diagram of photovoltaic bracket anchor bolt burying and positioning
dimension (unit: mm)
35
A16 integrated direct air power cabinet (550W/750W) installation manual 8 Photovoltaic bracket installation
4. Install the front and rear columns of the photovoltaic bracket. The length of the
front and rear columns are different.
36
A16 integrated direct air power cabinet (550W/750W) installation manual 8 Photovoltaic bracket installation
8. Photovoltaic panel wiring. The photovoltaic panels are connected in series and
parallel according to the photovoltaic electrical wiring schematic diagram below,
and finally connected to the cabinet.
37
A16 integrated direct air power cabinet (550W/750W) installation manual 8 Photovoltaic bracket installation
Caution:
All electrical connections must meet the requirements of national and local electrical
38
A16 integrated direct air power cabinet (550W/750W) installation manual 8 Photovoltaic bracket installation
39
9 Installation Inspection
Height error of all cabinets after leveling is less than 5mm, and (Qualified;
2
front and rear error of adjacent cabinets is less than 5mm. (Unqualified
(Qualified;
4 The cabinet is clean.
(Unqualified
(Qualified;
5 Keep the cabinet clean and meet the dust-proof requirements.
(Unqualified
The cabinet door is flexible to open and close, and the door (Qualified;
7
lock is normal. (Unqualified
(qualified;
8 All kinds of marks are correct, clear and complete.
(Unqualified
Inspection
No. Inspection items
results
The bare cable and cable nose handle at the terminal shall be
(Qualified;
2 tightly wrapped with insulating tape or covered with heat
(Unqualified
shrinkable sleeve, and shall not be exposed.
Flat pads and elastic pads should be installed at each terminal (Qualified;
3
to ensure firm installation and good contact. (Unqualified
The excess length of the tie should be cut off, and all tie strips (Qualified;
7
must be cut flat at the same root without pulling the tip. (Unqualified
(Qualified;
8 There is no excess tape, tie, etc. left on the cable.
(Unqualified
The excess length of power cord and protective ground cable (Qualified;
3
should be cut off and not coiled. (Unqualified
When making the nose for the power cord and protective (Qualified;
4
ground cable, the nose should be welded or pressed firmly. (Unqualified
41
A16 integrated direct air power cabinet (550W/750W) installation manual 9 Installation inspection
Inspection
No. Inspection items
results
When laying, the power cord and ground cable should be (Qualified;
5
bound separately from other cables. (Unqualified
(Qualified;
6 The dip switch setting on the device is correct.
(Unqualified
42
10 Configuration After Installation
This chapter only introduces the basic configuration steps after installation. Refer to
the maintenance manual of the cabinet for the relevant contents of use and
maintenance.
Enter the default IP of FSU at the browser address bar. The default IP of FSU is
192.168.1.50. The following interface will be displayed.
43
A16 integrated direct air power cabinet (550W/750W) installation manual 10 Configuration after installation
Click 【Network Settings】, then set the FSU IP as needed, as shown below.
Enter the default IP of 48V embedded power supply system at the browser address
bar. The default IP of 48V embedded power supply system is 192.168.70.2. The
following interface will be displayed.
Click 【Communication】, then set the 48V embedded power supply system IP as
needed, as shown below.
44
A16 integrated direct air power cabinet (550W/750W) installation manual 10 Configuration after installation
45
Appendix A General Wiring Diagram
of 48V Embedded Power Supply
System (550W/750W)
46
A16 integrated direct air power cabinet (550W/750W) installation manual
Figure A-1 General wiring diagram of 48V embedded power supply system (550W)-1
47
A16 integrated direct air power cabinet (550W/750W) installation manual
Figure A-2 General wiring diagram of 48V embedded power supply system (550W)-2
48
A16 integrated direct air power cabinet (550W/750W) installation manual
Figure A-3 General wiring diagram of 48V embedded power supply system (750W)-1
49
A16 integrated direct air power cabinet (550W/750W) installation manual
Figure A-4 General wiring diagram of 48V embedded power supply system (750W)-2
50
Appendix B General Wiring Diagram
of FSU (550W/750W)
51
A16 integrated direct air power cabinet (550W/750W) installation manual
Figure B-2 General wiring diagram of intelligent power and environment monitoring system (750W)
52
Appendix C Abbreviations
4 DC Direct current
53