LARSEN & TOUBRO LIMITED

INFRASTRUCTURE INDEPENDENT COMPANY


Ref: IM-08-B Rev 00
EHS RISK ASSESSMENT

Name of the Project: DMRC CC28 Business Unit: M&D

Activity considered: Compressor. Date:12-06-14

Hazard / Environment Aspect Additional Control


Sl. Risk / Measures (If the list is
Residual Risk
N Activity Source / Possible People at Existing Control Measures Impact exhaustive, give only Action By
/ Impact
o Situation / Act Outcome risk Level a Doc. ref no. of Safe
Work Method)

Substandard Failure of
Air Compressors are
equipment Equipment,
procured from reputed 1 4 L
Bursting of P&M Eng.
vendors with IS make
Container
Unguarded workmen P&M Eng.
All rotating parts are 1 3 L
rotating parts Entanglem
guarded
ent
Poor Condition Workmen/ Site
of Hose Bursting of Engineer Reinforced hoses are Eng./P&M
2 4 M Whip arrestor should be Eng.
Hose/ used.
Hitting the Couplers are used to join installed in all L
compressors.
workmen the hoses.
Outlet pressure is
4 Compressor controlled by quick shut
operation valves.

Site Eng.
Excessive Bursting of Workmen/ Pressure Gauges &
pressure Cylinders Engineer Pressure relief valves are 1 4
fitted & Ensured working L
condition.
Regular draining of drain
valves to avoid corrosion
& Condensation of water.
Hazard / Environment Aspect Additional Control
Sl. Risk / Measures (If the list is
Residual Risk
N Activity Source / Possible People at Existing Control Measures Impact exhaustive, give only Action By
/ Impact
o Situation / Act Outcome risk Level a Doc. ref no. of Safe
Work Method)

Cleaning of Injury workmen Workers are educated to Site Eng.


body by avoid using compressed 2 2 L
Compressed air for body, dress
Air. cleaning
ALARP – As Low as Reasonably Practicable.
Note: -
1) All low risk /impact level consider as ALARP level.
Medium and high risk can bring down to low risk level with additional control measures. Low risk is only acceptable.
2) All legal requirement consider as significant aspect.

___________________