Professional Documents
Culture Documents
ScheduleD PM Report CT520
ScheduleD PM Report CT520
GE Healthcare
PM REPORT Schedule D,
Optima CT520
SITE INFORMATION
Site Name
System ID Room Number
System Type (Select:) Select
FE Name Inspection Date RFS#
PRELIMINARY TASKS
Last PM Inspection
Verify last PM Inspection.
Last Inspection Date Last Schedule Completed: Select
List any Schedule C tasks that were completed earlier.
Initial Procedures
Check Temperature and Humidity.
Record the temperature and humidity. Indicate if these are within spec.
Room Temperature Humidity Pass/Fail Comments/Follow-up
Scan room Select
Control Room Select
Console
Task Completed Comments/Follow-up
Console Monitor Cleaning & Inspection
GE Confidential Page 1 of 6
GE Healthcare PM Report Schedule D Optima CT520
General Tasks
Task Pass/Fail Comments/Follow-up
Emergency Off Switch Select
UPS Power Off Inspection Select
General Tasks
Task Pass/Fail Comments/Follow-up
UPS Powered and Operational
Select
Plenum Fans (5) Operational Select
Grease Gantry Main Bearing Select
No. Revs since last greasing
GE Confidential Page 2 of 6
GE Healthcare PM Report Schedule D Optima CT520
Finalization
System Scanning Test
Task QA Phantom Location Gantry Serial #
Serial #
Scans Scan Failures Artifacts Artifact Types
Series 1 (Scout/Auto Voice) Select Select
Series 2 (Axial/Tilt) Select Select
Series 3 (Helical/Auto Voice) Select Select
General Tasks
Task Select Comments/Follow-up
X-ray On Indicators Select
Scan Control Pushbuttons Test Select
Quality Assurance Test Select
GE Phantom Serial #
Completed
Site Log Updated
PM Paper work completed for this site
Comments:
Is follow-up work required?: Select
Service Scheduled Date:
This inspection passed and meets all GE Healthcare PM specifications.
GE Confidential Page 3 of 6
GE Healthcare PM Report Schedule D Optima CT520
GE Confidential Page 4 of 6
GE Healthcare PM Report Schedule D Optima CT520
GE Confidential Page 5 of 6
GE Healthcare PM Report Schedule D Optima CT520
Revision History
Rev Date Reason for Change
1 Aug/7/2012 Initial Release
GE Confidential Page 6 of 6