1 Fill materials shall be placed in lift or layer not exceeding ………...in loose depth.
a. 100mm b. 200mm
c.
300mm d. 400mm
e. None of the above
a. Design strength > Required strength b. Design strength < Required strength
c.
Design strength = Required strength d. None of the above
e.
4 As per ACI 318M sec. 5.6.1.1 , sample grouting shall be taken not less than once a day or less than
……… m³ of concrete.
a. 110 m³ b. 120 m³
c.
115 m³ d. 130 m³
e. None of the above
a. True. b. False.
c.
None of the above d. 0
e.
6 For Cast-in-place concrete size of spirals shall not be less than ….. Diameter.
a. 8mm b. 6mm
c.
10mm d. 12mm
e. None of the above
a. 6 b. 8
c.
4 d. 2
e. None of the above
8 How many days should a masonry wall be cured prior to grout pouring for high lift grouted
construction?
a. 8 days b. 3days
c.
7 days d. 14 days
e. None of the above
a. 16mm b. 20mm
c.
25mm d. 12mm
e. None of the above
10 The maximum particle size of fill material shall be?
11 Paving slabs subject to vehicular traffic shall have a minimum thickness of?
a. 100mm b. 150mm
c.
200mm d. 250mm
e. None of the above
12 Control or construction joints for concrete paving shall be spaced at a maximum of meters in both
directions.
a. 2 b. 4
c.
6 d. 8
e. None of the above
13 Asphalt mix can be placed & compacted if the temperature is not less than 139 degrees centigrade.
a. TRUE b. FALSE
c.
None of the above d. 0
e.
a. 2000psi b. 4000psi
c.
5000psi d. 6000psi
e. None of the above
15 Bituminous mixture shall be compacted to …… % of the marshal density per ASTM D 1559
a. 96 b. 98
c.
90 d. 100
e. None of the above
17 As a minimum, 'Select Fill Material' shall be used within of the bottom elevation of foundations,
spread footings, or slabs-on-grade when fill is required to achieve final grade.
a. 0.4m b. 0.6m
c.
0.8m d. 1.2m
e. None of the above
18 Any excavation or trench with a minimum depth of ……….,the shoring shall be installed or the sides
shall be sloped or benched and treated as a confined space.
a. 1.0m b. 1.2m
c.
1.5m d. 2
e. None of the above
19 Under foundations with static loads over 320kPa and foundations for vibrating or heavy machinery
and pavements........ ..... ..% of relative density (ASTM D4253/ASTM D4254) for cohesion less soils.
a. 70 b. 75
c.
80 d. 85
e. None of the above
20 The depth of the test holes for nuclear method shall be no greater than deep. (ASTM D 2922…SEC 1.1)
a. 150mm b. 200mm
c.
250mm d. 300mm
e. None of the above
21 Coarse grout mix proportions shall be: …...part Portland cement; …….part slaked lime; …….. parts
coarse aggregates. (ACI 530.1, Sec. 2.6B.1)
I part cement, 0.1 part slaked lime and 1-2.0 I part cement, 0.25 part slaked lime and 2.2-2.5
a. b.
parts fine aggregates parts fine aggregates
c. I part cement, 0.27 part slaked lime and 2.0-2.5 I part cement, O. 3part slaked lime and 3.0-3.25
d.
parts fine aggregates parts fine aggregates
e. I part cement, 0.6 part slaked lime and 3.0-3.5
parts fine aggregates
22 Alignments of masonry walls shall be within for bearing walls (ACI 530.1, Sec3.3.G.2d
a. +0.75" b. ±0.6"
c.
±0.5” d. +0.25"
e. None of the above
23 Minimum clear distance from anchor bolts or sleeves to edge of concrete shall be ……..
a. 50mm b. 75mm
c.
100mm d. 125mm
e. None of the above
24 The minimum anchor bolt diameter shall be .....................unless specified by the vendor for small
equipment or for the anchorage of small miscellaneous items e.g. ladder supports, small piping
supports, handrail anchorage, stair stringers, small platforms etc.
a. 25MM b. 20MM
c.
10MM d. 12MM
e. None of the above
25 The hot mix asphalt using the conventional bitumen shall have a temperature between …………….. at
the time of delivery
a. 139 Deg.C and 163 Deg.C b. 136 Deg.C and 165 Deg.C
c.
139 Deg.C and 165 Deg.C d. 130 Deg.C and 160 Deg.C
e. None of the above
26 At the time of spreading and compaction, the conventional hot mix asphalt concrete material all be at
least ………….
27 The entire subgrade shall be compacted to not less than ………..% of the maximum dry density (ASTM
D1557) while within 1.5% of the optimum moisture content (for cohesive soils)
a. 90 b. 95
c.
98 d. 100
e. None of the above
28 The entire subgrade shall be compacted to not less than ……..% relative density (ASTM D4253/D4254)
(for cohensionless soils).
a. 75 b. 80
c.
85 d. 90
e. None of the above
29 Prime coat is to be applied only when the surface to be treated is dry and the atmospheric
temperature is or above.
a. 12Deg C b. 4Deg C
c.
10Deg C d. 16Deg C
e. None of the above
30 The prime coat shall be applied uniformly to the surface of the base using a pressure distributor at a
rate between ……….
31 Measurement of any cores shall not be less than ………….of the design thickness, whichever is less.
33 Core compaction requirements shall be equal to or greater than ……..% of Marshall density (ASTM D-
2726/ASTM D1559) using samples taken at the road site
a. 95 b. 96
c.
98 d. 100
e. None of the above
34 Gypsum board corners shall be square with a tolerance of over the full width of the board. (1997 UBC,
Sec. 2502.14; ASTM 06, sec. 6.2.5)
a. ±2 b. ±3
c.
±4 d. ±5
e. None of the above
35 Wood supports for lath or gypsum board shall not be less than………… in least dimension. (1997 UBC,
Sec. 2503.2)
a. 2" b. 3"
c.
4" d. 5"
e. None of the above
a. 0 to 5 b. 0 to 10
c.
0 to 20 d. 5 to 15
e. None of the above
38 The primary member use to carry the axial compressive load is?
a. Beam b. Slab
c.
Column d. Walls
e. None of the above
a. Compression b. Stress
c.
Tension d. Strength
e. MPA
41 Complete record of test of materials and of concrete shall be available for inspection after completion
of project for ….. Years
a. 5 b. 2
c.
6 d. 1
e. None of the above
43 The admixture can be reJected of the air content found more than ………..% in non-air Entrained
concrete.
a. 2 b. 3.5
c.
3 d. 1
e. None of the above
44 Short chutes, which made by Aluminum can be used to convey concret from a truck mix.
a. True. b. False.
c.
None of the above d. 0
e.
a. True. b. False.
c.
None of the above d. 0
e.
46 Reinforcement partially embedded in concrete can be field bent, it shown in IFC drawing or permitted
by company engineer.
a. True. b. False.
c.
None of the above d. 0
e.
a. True. b. False.
c.
None of the above d. 0
e.
48 Concrete surface to be chipped out minimum of ……………… as the surface preparation for grouting.
a. 40mm b. 25mm
c.
50mm d. 10mm
e. None of the above
a. Two b. One
c.
None of the above d. 0
e.
51 Place concrete in layers not to exceed thick and consolidate.(ACl 301, Sec. 8.3.1.3)
a. 300mm b. 350mm
c.
400mm d. 450mm
e. None of the above
a. 25mm b. 40mm
c.
20mm d. 50mm
e. None of the above
53 Compaction shall begin only after the fill or backfill has been properly placed and the material to e
compacted is at the proper moisture content………….of the optimum moisture content per ASTM
D1557 or ASTM D698, whichever is applicable.
a. +1.5%, b. +2.0%,
c.
+2.5%, d. ,± 3.0%
e. None of the above
54 What are the things mixed with a cementing __is form a hydraulic cement concrete or mortar?
a. Sand, gravel ,crashed stone, Blast furnace slag b. Sand, Blast furnace slag
c.
Blast furnace slag, Water d. Blast furnace slag, Retarders
e. None of the above
55 ASTM means ???
a. American Society for Testing & Materials b. American Society for Testing & Minerals
c.
American Society of Testing & Minerals d. American Society of Testing & Materials
e. None of the above
56 Direct Buried Cable / Conduit Trench - A minimum of dry sand shall be installed from bottom of
trench to bottom of cable or conduit (as a cushion).
a. 100mm b. 150mm
c.
200mm d. 300mm
e. None of the above
a. 6mm b. 10
c.
12 d. 16
e. None of the above
58 Maximum total dissolved solids in water used for moist curing shall not exceed........
a. 500ppm b. 1000ppm
c.
1500ppm d. 2000ppm
e. None of the above
59 What is TDS ?
a. Total Drainable Solid b. Total Dissolved Solid
c.
Total Detected Solid d. Total Defected Solid
e. None of the above
a. 2 numbers b. 1 number
c.
4 numbers d. 3 numbers
e. None of the above
62 How many days should a masonry wall be cured prior to grout pouring for high lift grouted
construction?
a. 8 days b. 3days
c.
7 days d. 14 days
e. None of the above
63 As a minimum, 'Select Fill Material' shall be used within of the bottom elevation of fundations, spread
footings, or slabs-on-grade when fill is required to achieve final grade.
a. 0.4m b. 0.6m
c.
0.8m d. 1.2m
e. None of the above
64 At the time of spreading and compaction, the conventional hot mix asphalt concrete material all be at
least ………….
65 Wood supports for lath or gypsum board shall not be less than………… in least dimension. (1997 UBC,
Sec. 2503.2)
a. 2" b. 3"
c.
4" d. 5"
e. None of the above
66 Short chutes, which made by Aluminum can be used to convey concrete from a truck mix.
a. True. b. False.
c.
None of the above d. 0
e.
67 Concrete shall be discharged from the mixer within ………..of the mixer from the time the mixing water
was added. ASTM C-94, Sec. 11.7
a. 100mm b. 50mm
c.
75mm d. 150mm
e. None of the above
70 The minimum time that a plastic sheet should be in place on concrete surface to determine its
moisture content by plastic sheet method, ASTM D4263 is
a. 10Hours b. 24Hours
c.
5Hours d. 16Hours
e. None of the above
a. 0.5m b. 1m
c.
3m d. 2m
e. None of the above
72 The tack coat shall be applied on paved surfaces and vertical surfaces which will be in contact with the
asphalt paving by means of a bitumen distributor at a maximum rate of …………….
a. ℓ∕20 b. ℓ∕24
c.
ℓ∕28 d. ℓ∕10
e. None of the above
a. 25 Deg.C b. 30 Deg.C
c.
35 Deg.C d. 40 Deg.C
e. None of the above
75 Method of pre stressing in which tendons are tensioned after concrete had hardened is?
a. 250mm b. 150mm
c.
100mm d. 200mm
e. None of the above
77 The prime coat shall be applied at a temperature between ... ... .... .. .............for MC-70
a. 50Dec and 70Deg.c b. 60Dec and 80Deg.c
c.
50Dec and 80Deg.c d. 50Dec and 90Deg.c
e. None of the above
a. 6 b. 8
c.
4 d. 2
e. None of the above
80 The hot mix asphalt using the conventional bitumen shall have a temperature between …………….. at
the time of delivery
a. 139 Deg.C and 163 Deg.C b. 136 Deg.C and 165 Deg.C
c.
139 Deg.C and 165 Deg.C d. 130 Deg.C and 160 Deg.C
e. None of the above
81 Gypsum board corners shall be square with a tolerance of over the full width of the board. (1997 UBC,
Sec. 2502.14; ASTM 06, sec. 6.2.5)
a. ±2 b. ±3
c.
±4 d. ±5
e. None of the above
82 The admixture can be rejected of the air content found more than ………..% in non-air Entrained
concrete.
a. 2 b. 3.5
c.
3 d. 1
e. None of the above
a. 75mm(3") b. 100mm(4")
c.
150mm(6") d. 200mm(8")
e. None of the above
84 The laboratory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO T-193 for base class
material at 100% compaction D1557 shall conform to:…………
a. 25Min. b. 50Min
c.
30Min d. 100Min
e. None of the above
85 The minimum bend diameter for No.16 Bar commonly used for stirrups and ties shall be ………………..
a. 2 db b. 4 db
c.
6 db d. 12 db
e. None of the above
86 Fill or backfill placed beneath footings, grade beams, mats, buildings, and process areas shall be
compacted to at least …….% of the maximum Modified Proctor density as determined by ASTM D1557
a. 85 b. 90
c.
95 d. 98
e. None of the above
a. [0] b. 15
c.
35 d. 5
e. None of the above
a. 6mm b. 12mm
c.
8mm d. 10mm
e. None of the above
90 Fill materials shall be placed in lift or layer not exceeding ………in loose depth.
a. 100mm b. 200MM
c.
300MM d. 400MM
e. None of the above
91 All compaction shall be completed before the temperature of the mix falls below ………….
94 The minimum thickness of grout between the foundation and base plates shall besteel 1m and
Packings to be provided
a. 10mm b. 15mm
c.
29mm d. 25mm
e. None of the above
96 Any excavation or trench with a minimum depth of ……….,the shoring shall be installed or the sides
shall be sloped or benched and treated as a confined space.
a. 1.0m b. 1.2m
c.
1.5m d. 2
e. None of the above
97 The entire subgrade shall be compacted to not less than ………..% of the maximum dry density (ASTM
D1557) while within 1.5% of the optimum moisture content (for cohesive soils)
a. 90 b. 95
c.
98 d. 100
e. None of the above
a. True. b. False.
c.
None of the above d. 0
e.
100 Fine grout mix proportions shall be …... Part Portland cement …….. Part slaked lime and parts fine
aggregates.(ACl 530.1, Sec. 2.6B.1)
1part cement, 0.1 part slaked lime and 2.25-3.0 1part cement, 0.25 part slaked lime and 3.25-
a. b.
parts fine aggregates 3.5 parts fine aggregates
c. 1 part cement, 0.27 part slaked lime and 2.25- 1 part cement, O. 3part slaked lime and 3.0-3.25
d.
2.5 parts fine aggregates parts fine
e. 1 part cement, 1 part slaked lime and 4.0-6.25
parts fine aggregates
ANSWERS
1 B 51 D
2 A 52 A
3 A 53 D
4 B 54 A
5 A 55 A
6 C 56 C
7 C 57 A
8 C 58 B
9 C 59 B
10 A 60 A
11 B 61 D
12 C 62 C
13 A 63 B
14 C 64 D
15 A 65 A
16 A 66 A
17 B 67 D
18 B 68 A
19 D 69 B
20 D 70 D
21 A 71 B
22 A 72 B
23 C 73 D
24 B 74 C
25 A 75 A
26 D 76 A
27 B 77 C
28 C 78 C
29 D 79 A
30 B 80 A
31 A 81 A
32 B 82 B
33 B 83 B
34 A 84 D
35 A 85 B
36 A 86 B
37 C 87 A
38 C 88 A
39 A 89 A
40 B 90 C
41 B 91 C
42 C 92 B
43 B 93 B
44 A 94 D
45 B 95 C
46 A 96 B
47 B 97 B
48 B 98 A
49 B 99 B
50 B 100 A