FMCS-SCADA

FMCS-PLC

AI AI AO AI AI

ROOM TEMPERATURE

ROOM TEMPERATURE

ROOM HUMIDITY
VALVE CONTROL

VALVE POSITION
TT01 A & TT01B TCV01 MT01 A & MT01B
SIMILAR FOR SIMILAR FOR SIMILAR FOR
TT02A & TT02B, TCV02 & TCV03 MT02A & MT02B,
TT03A & TT03B MT03A & MT03B
TENDER
CUB EXT FAB EXT

STAGING WAREHOUSE
IMP
PHOTO RESIST
CUB
GAS PLANT EXPANSION
FAB

132kV SUBSTATION UPW WAREHOUSE 2


UPW POLISH
CUB ANNEX CMP
WET BENCH
HF2 HF1

RESERVED
AN SLUDGE
AREA FOR
WAREHOUSE
FUTURE

33 UBI AVENUE 3 #06-37 VERTEX


TOWER A SINGAPORE 408868
TEL : +65-62220942 FAX :
+65-62220943

NO. 8, 1ST FLOOR, LOT 7414, SECTION


64, JALAN SIMPANG TIGA,
93350 KUCHING, SARAWAK
DESIGN GROUP TEL : +6082-411961
FAX : +6082-241558

TT01A MT01A TCV01 TT02A MT02A TCV02 TT03A MT03A TCV03 PCS KONSULTANT SDN. BHD.

A A A A A A A A A

TT01B MT01B TT02B MT02B TT03B MT03B PERUNDING CHL SDN BHD
NO. 15-A, 1ST & 2ND FLOOR, LOT 511,

A A A A A A SECTION 6, KTLD, JALAN KULAS, 93400


KUCHING, SARAWAK.
TEL: +6082-245911
FAX: +6082-230911

INSTRUMENTATION & CONTROL


FABRICATION BUILDING
DRY COOLING COIL SYSTEM - FMCS
SECOND FLOOR
SCHEMATIC

XFAB-SCH-FB-2F-ICFMS-002